Permit Information
Permit NumberBLD18-00568
StatusFinaled
Name JEH CONSTRUCTION
Site Address 2718 E RHYOLITE WAY
Project NameDurham bathroom addition
Customer Number 
ePlanReviewNo
Description
WUI - Permit for a 256sq' addition that adds a bathroom & closet adjacent to a bedroom, creating a Master Suite. ResCheck energy compliance. All work per plans, engineering, local codes & ordinances. Separate electrical, plumbing, & mechanical permits required. **JAB** SUBGRADE ONLY
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/31/20187/31/20187/31/2018PPASS
DetailsDave Hannah
Please call Jon @ ###-#### for access to home Phone #: ###-#### Inspection requested via web by Jon Yorgason
DOC - Permit Finaled7/31/20187/31/20187/31/2018PPASS
DetailsDave Hannah
BLD-Energy code compliance5/17/20185/17/20185/17/2018PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Jon Yorgason
BLD-Framing/Rough-in5/11/20185/14/20185/14/2018APASS
DetailsDave Hannah
Call me to verify inspection is scheduled Phone #: ###-#### Inspection requested via web by Jon Yorgason
BLD-Wall Bracing5/9/20185/10/20185/10/2018APART
DetailsDave Hannah
Access to remodel area behind home through gate on right side of home. Please call, if possible, for inspection time so I can meet to guarantee access Phone #: ###-#### Inspection requested via web by Jon Yorgason shear needs to block seams and add stapels
BLD-Foundation4/10/20184/10/20184/11/2018PPASS
DetailsDave Hannah
Ryan Phone #: ###-####
BLD-Footing4/5/20184/6/20184/6/2018ACANC
DetailsBrandon Shaw
Brian Phone #: ###-####
PubWorks Subgrade Approval4/6/20184/6/20184/6/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Issue PAID IN FULL permit  3/22/2018 DONE
OVERRIDE  2/26/2018  
Plan assigned to (JAB) Josh2/16/20182/16/20182/26/2018 PASS
DetailsJosh Bogle
1st done - need an ES Report for spray foam
Routing - PLAN CHECK2/26/2018 2/26/2018 PASS
DetailsJosh Bogle
1st review completed  2/26/2018 DONE
DetailsJosh Bogle
Inspection Record Card- Bld  2/26/2018 DONE
DetailsJosh Bogle
Case Summary (BLD)  2/26/2018 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  2/26/2018 DONE
DetailsJosh Bogle
Permit Ready to Issue  2/26/2018 DONE
met
Telephone call  2/26/2018 DONE
called Jon and told him permit is ready and fee due.
Routing - PLAN CHECK  2/21/2018 FAIL
DetailsJosh Bogle
Routing PW Grading-Hillside2/21/2018 2/21/2018 PASS
DetailsMelissa Jannusch
SUBGRADE APPROVAL ONLY


A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
1st review completed  2/21/2018 FAIL
DetailsJosh Bogle
Routing - Erosion and Sediment2/16/2018 2/20/2018 PASS
DetailsMichael Zawacki
Waiver request approved. JEH still responsible for any needed BMPs.
Routing Walk-In (Zoning)2/16/20182/16/20182/16/2018PDONE
DetailsSue Cummings
Routing Walk-In (BLD)2/16/20182/16/20182/16/2018PPASS
DetailsJosh Bogle
took in as a level 2
Application received 2/16/2018