BLD-Final | 7/31/2018 | 7/31/2018 | 7/31/2018 | P | PASS |
Dave Hannah
|
|
|
Please call Jon @ ###-#### for access to home Phone #: ###-#### Inspection requested via web by Jon Yorgason
|
DOC - Permit Finaled | 7/31/2018 | 7/31/2018 | 7/31/2018 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 5/17/2018 | 5/17/2018 | 5/17/2018 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Jon Yorgason
|
BLD-Framing/Rough-in | 5/11/2018 | 5/14/2018 | 5/14/2018 | A | PASS |
Dave Hannah
|
|
|
Call me to verify inspection is scheduled Phone #: ###-#### Inspection requested via web by Jon Yorgason
|
BLD-Wall Bracing | 5/9/2018 | 5/10/2018 | 5/10/2018 | A | PART |
Dave Hannah
|
|
|
Access to remodel area behind home through gate on right side of home. Please call, if possible, for inspection time so I can meet to guarantee access Phone #: ###-#### Inspection requested via web by Jon Yorgason shear needs to block seams and add stapels
|
BLD-Foundation | 4/10/2018 | 4/10/2018 | 4/11/2018 | P | PASS |
Dave Hannah
|
|
|
Ryan Phone #: ###-####
|
BLD-Footing | 4/5/2018 | 4/6/2018 | 4/6/2018 | A | CANC |
Brandon Shaw
|
|
|
Brian Phone #: ###-####
|
PubWorks Subgrade Approval | 4/6/2018 | 4/6/2018 | 4/6/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 3/22/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 2/26/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 2/16/2018 | 2/16/2018 | 2/26/2018 | | PASS |
Josh Bogle
|
|
|
1st done - need an ES Report for spray foam
|
Routing - PLAN CHECK | 2/26/2018 | | 2/26/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 2/26/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 2/26/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 2/26/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/26/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 2/26/2018 | | DONE |
|
|
|
met
|
Telephone call | | | 2/26/2018 | | DONE |
|
|
|
called Jon and told him permit is ready and fee due.
|
Routing - PLAN CHECK | | | 2/21/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing PW Grading-Hillside | 2/21/2018 | | 2/21/2018 | | PASS |
Melissa Jannusch
|
|
|
SUBGRADE APPROVAL ONLY
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
|
1st review completed | | | 2/21/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - Erosion and Sediment | 2/16/2018 | | 2/20/2018 | | PASS |
Michael Zawacki
|
|
|
Waiver request approved. JEH still responsible for any needed BMPs.
|
Routing Walk-In (Zoning) | 2/16/2018 | 2/16/2018 | 2/16/2018 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 2/16/2018 | 2/16/2018 | 2/16/2018 | P | PASS |
Josh Bogle
|
|
|
took in as a level 2
|
Application received | | 2/16/2018 | | | |
|
|
|
|