Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD18-00585
StatusFinaled
Name GREEN TEAM CONSTRUCTION LLC
Site Address 2772 S QUERCUS AVE
Project NameWagner fire repair
Customer Number 
ePlanReviewNo
Description
Permit for a fire repair that involves all new trusses, eight new windows, all new insulation, new wiring, new cabinets, countertops, floor coverings, and a rebuilt patio cover. Furnace being reused. All work per plans, scope, notes, & local code. Separate electrical, plumbing, & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/31/20187/31/20187/31/2018PPASS
DetailsMike Jordan
Late afternoon // Will Phone #: ###-####
DOC - Permit Finaled7/31/20187/31/20187/31/2018PPASS
DetailsMike Jordan
BLD-Energy code compliance5/1/20185/1/20185/1/2018PPASS
DetailsMike Jordan
Will Phone #: ###-####
BLD-Framing/Rough-in5/1/20185/1/20185/1/2018PPASS
DetailsMike Jordan
Will Phone #: ###-####
BLD-Energy code compliance4/30/20184/30/20184/30/2018PNR
DetailsMike Jordan
call for access- Will Phone #: ###-####. Still needs fireblocking at fireplace.
BLD-Framing/Rough-in4/23/20184/23/20184/23/2018PFAIL
DetailsMike Jordan
call lock box code // Will Mitchell Phone #: ###-####. Complete the lateral bracing on the A05 trusses. Install missed h2.5 on trusses in garage. Provide additional stud for bearing on 3ply B03 truss. Fireblock firdown in kitchen and at firplace. ok to insulate. Correction notice posted.
BLD-Wall Bracing3/7/20183/7/20183/7/2018PCANC
DetailsMike Jordan
William Phone #: ###-####
Plan assigned to (JAB) Josh2/28/20182/28/20183/2/2018 PASS
DetailsJosh Bogle
plan mod-manual J's
Routing - PLAN CHECK2/28/2018 3/2/2018 PASS
DetailsJosh Bogle
the only change was adding a new furnace
PLANS/APPL TAKEN TO FRONT DESK  3/2/2018 DONE
DetailsJosh Bogle
no charge - easy Mod - JAB
CHANGE STATUS TO (ISS)  3/2/2018 DONE
Plan Mod For Manual J approved
Routing - MECHANICAL2/28/2018 2/28/2018 PASS
DetailsTroy James
Plan Modification Accepted  2/28/2018 DONE
plan mod submitted-manual J's for work on the hvac system-not on original app-put on Josh's desk
Routing Walk-In (BLD)2/20/20182/20/20182/20/2018PDONE
DetailsJosh Bogle
Routing - PLAN CHECK2/20/2018 2/20/2018 PASS
DetailsJosh Bogle
1st review completed  2/20/2018 DONE
DetailsJosh Bogle
Inspection Record Card- Bld  2/20/2018 DONE
DetailsJosh Bogle
Case Summary (BLD)  2/20/2018 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  2/20/2018 DONE
DetailsJosh Bogle
Permit Ready to Issue  2/20/2018 DONE
Issue PAID IN FULL permit  2/20/2018 DONE
Application received 2/20/2018