BLD-Final | 7/31/2018 | 7/31/2018 | 7/31/2018 | P | PASS |
Mike Jordan
|
|
|
Late afternoon // Will Phone #: ###-####
|
DOC - Permit Finaled | 7/31/2018 | 7/31/2018 | 7/31/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 5/1/2018 | 5/1/2018 | 5/1/2018 | P | PASS |
Mike Jordan
|
|
|
Will Phone #: ###-####
|
BLD-Framing/Rough-in | 5/1/2018 | 5/1/2018 | 5/1/2018 | P | PASS |
Mike Jordan
|
|
|
Will Phone #: ###-####
|
BLD-Energy code compliance | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | NR |
Mike Jordan
|
|
|
call for access- Will Phone #: ###-####. Still needs fireblocking at fireplace.
|
BLD-Framing/Rough-in | 4/23/2018 | 4/23/2018 | 4/23/2018 | P | FAIL |
Mike Jordan
|
|
|
call lock box code // Will Mitchell Phone #: ###-####. Complete the lateral bracing on the A05 trusses. Install missed h2.5 on trusses in garage. Provide additional stud for bearing on 3ply B03 truss. Fireblock firdown in kitchen and at firplace. ok to insulate. Correction notice posted.
|
BLD-Wall Bracing | 3/7/2018 | 3/7/2018 | 3/7/2018 | P | CANC |
Mike Jordan
|
|
|
William Phone #: ###-####
|
Plan assigned to (JAB) Josh | 2/28/2018 | 2/28/2018 | 3/2/2018 | | PASS |
Josh Bogle
|
|
|
plan mod-manual J's
|
Routing - PLAN CHECK | 2/28/2018 | | 3/2/2018 | | PASS |
Josh Bogle
|
|
|
the only change was adding a new furnace
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/2/2018 | | DONE |
Josh Bogle
|
|
|
no charge - easy Mod - JAB
|
CHANGE STATUS TO (ISS) | | | 3/2/2018 | | DONE |
|
|
|
Plan Mod For Manual J approved
|
Routing - MECHANICAL | 2/28/2018 | | 2/28/2018 | | PASS |
Troy James
|
|
|
|
Plan Modification Accepted | | | 2/28/2018 | | DONE |
|
|
|
plan mod submitted-manual J's for work on the hvac system-not on original app-put on Josh's desk
|
Routing Walk-In (BLD) | 2/20/2018 | 2/20/2018 | 2/20/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 2/20/2018 | | 2/20/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 2/20/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 2/20/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 2/20/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/20/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 2/20/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/20/2018 | | DONE |
|
|
|
|
Application received | | 2/20/2018 | | | |
|
|
|
|