BLD-Final | 9/11/2018 | 9/11/2018 | 9/11/2018 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 9/11/2018 | 9/11/2018 | 9/11/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Ceiling Grid Inspection | 9/10/2018 | 9/11/2018 | 9/11/2018 | A | CANC |
Jim Sly
|
|
|
Robere Phone #: ###-####
|
DOC - Permit Finaled | 9/11/2018 | 9/11/2018 | 9/11/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 4/23/2018 | 4/23/2018 | 4/23/2018 | P | PASS |
Jim Sly
|
|
|
Robere Phone #: ###-####
|
BLD-Framing/Rough-in | 4/19/2018 | 4/20/2018 | 4/20/2018 | A | PASS |
Jim Sly
|
|
|
Robere Phone #: ###-####
|
BLD-Wall Bracing | 4/2/2018 | 4/3/2018 | 4/3/2018 | A | PASS |
Jim Sly
|
|
|
Robere Phone #: ###-####
|
BLD-Foundation | 3/8/2018 | 3/9/2018 | 3/9/2018 | A | PASS |
Jim Sly
|
|
|
Albert Phone #: ###-####
|
BLD-Footing | 3/7/2018 | 3/8/2018 | 3/8/2018 | A | PASS |
Jim Sly
|
|
|
concrete sched at 10:30 // albert Phone #: ###-####
|
OVERRIDE | | | 2/20/2018 | | |
|
|
|
|
Routing Walk-In (Zoning) | 2/20/2018 | 2/20/2018 | 2/20/2018 | P | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 2/20/2018 | 2/20/2018 | 2/20/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 2/20/2018 | | 2/20/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 2/20/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 2/20/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 2/20/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/20/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 2/20/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/20/2018 | | DONE |
|
|
|
|
Application received | | 2/20/2018 | | | |
|
|
|
|