BLD-Final | 12/18/2018 | 12/18/2018 | 12/18/2018 | P | PASS |
Brandon Shaw
|
|
|
Jeff Phone #: ###-####-grading permit needs finaled as well as the mechanical
|
DOC - Permit Finaled | 12/18/2018 | 12/18/2018 | 12/18/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 12/17/2018 | 12/18/2018 | 12/18/2018 | A | FAIL |
Mike Jordan
|
|
|
Jeff Phone #: ###-####. Temp handrails to low. Needs engineering on cable guards. Needs to secure exterior door to stairs to extrior deck. 20 min. door not self closing.
|
PubWorks Occupancy Approval | 12/13/2018 | 12/13/2018 | 12/13/2018 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Conference | 12/7/2018 | 12/10/2018 | 12/10/2018 | P | PART |
Tony Young
|
|
|
Jeff Phone #: ###-####,, ?s on the final,, walk through
|
BLD-Energy code compliance | 9/6/2018 | 9/7/2018 | 9/7/2018 | A | PASS |
Tony Young
|
|
|
Jeff Phone #: ###-####
|
BLD-Framing/Rough-in | 8/27/2018 | 8/27/2018 | 8/27/2018 | P | PART |
Tony Young
|
|
|
Jeff Phone #: ###-####,, corrections needed,, ok to insulate,, need approval/ fix on notched trusses,, fireblocking, straps on plates, truss braces
|
BLD-Framing/Rough-in | 8/22/2018 | 8/23/2018 | 8/23/2018 | A | NR |
Tony Young
|
|
|
Jeff Phone #: ###-####
|
BLD-Framing/Rough-in | 8/21/2018 | 8/22/2018 | 8/22/2018 | A | NR |
Tony Young
|
|
|
Jeff Phone #: ###-####,, needs mech pass
|
BLD-Framing/Rough-in | 8/20/2018 | 8/20/2018 | 8/20/2018 | P | NR |
Tony Young
|
|
|
after 1:30pm- Jeff Phone #: ###-####,, needs mechanical 1st
|
BLD-Conference | 8/8/2018 | 8/9/2018 | 8/9/2018 | A | DONE |
Dave Hannah
|
|
|
Jeff Phone #: ###-####
|
PubWorks Subgrade Approval | 6/27/2018 | 6/27/2018 | 6/27/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 6/22/2018 | 6/25/2018 | 6/25/2018 | A | PART |
Tony Young
|
|
|
Jeff Phone #: ###-####,, deck footings ok pending soils report
|
BLD-Foundation | 6/18/2018 | 6/19/2018 | 6/19/2018 | A | DONE |
Dave Hannah
|
|
|
geo tec is with permit for shotcreet bank
|
BLD-Footing | 6/4/2018 | 6/5/2018 | 6/5/2018 | P | PASS |
Tony Young
|
|
|
Jeff Phone #: ###-####,, house ok
|
BLD-Foundation | 6/1/2018 | 6/4/2018 | 6/4/2018 | P | PEND |
Tony Young
|
|
|
Jeff Phone #: ###-####,, work in progress,, needs official ok from public works on sub grade
|
OVERRIDE | | | 5/9/2018 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/9/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/9/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/9/2018 | | 5/9/2018 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/9/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 5/9/2018 | | DONE |
|
|
|
met
ESC permit is also associated with the grading permit
|
Plan assigned to (M_H) | 3/8/2018 | | 5/9/2018 | | DONE |
Michael Hanson
|
|
|
03/27 sfd L2 ePlan. 1st review completed - Provide required WUI information. MDH
|
Routing PW Grading-Hillside | 4/20/2018 | | 4/20/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - PLAN CHECK | 4/20/2018 | | 4/20/2018 | | FAIL |
Michael Hanson
|
|
|
Provide required WUI information. MDH
|
Routing - FIRE | 4/16/2018 | 4/16/2018 | 4/16/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing PW Grading-Hillside | 4/6/2018 | | 4/6/2018 | | FAIL |
Melissa Jannusch
|
|
|
see changemarks from 3-12-2018 PW Hillside --MMJ
|
Plan Reviewer's activity | | | 3/26/2018 | | FAIL |
Michael Hanson
|
|
|
Provide missing sheets and required WUI, Hillside, and Fire protection information. MDH
|
1st review completed | | | 3/26/2018 | | FAIL |
Michael Hanson
|
|
|
Provide missing sheets and required WUI, Hillside, and Fire protection information. MDH
|
Routing - PUBLIC WORKS | 3/8/2018 | | 3/26/2018 | | PASS |
Rachael Beierle
|
|
|
Per ePlan approval. MDH
|
Routing - PLAN CHECK | 3/8/2018 | | 3/26/2018 | | FAIL |
Michael Hanson
|
|
|
Provide missing sheets and required WUI, Hillside, and Fire protection information. MDH
|
Routing - FIRE | 3/8/2018 | 3/8/2018 | 3/13/2018 | | FAIL |
Scott Arellano
|
|
|
Attached comments to case and emailed applicant
|
Routing PW Grading-Hillside | 3/8/2018 | | 3/12/2018 | | FAIL |
Melissa Jannusch
|
|
|
Missing civil sheets 2 and 3. Missing geotechnical letter 2-26-2018.
|
Route to Impact Fee Review | 3/8/2018 | 3/11/2018 | 3/9/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 3/8/2018 | | 3/9/2018 | | PASS |
David Moser
|
|
|
CFH17-00072
|
Routing - Addressing | 3/8/2018 | | 3/8/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - MECHANICAL | 3/8/2018 | | 3/8/2018 | | PASS |
Troy James
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/8/2018 | | DONE |
|
|
|
|
Intake Approval | | | 3/8/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/8/2018 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 3/8/2018 | | 3/8/2018 | | PASS |
Michael Zawacki
|
|
|
Please refer to ESC18-00264. Site prep inspection already completed.
|
Intake Approval | | | 3/7/2018 | | FAIL |
|
|
|
still need sq ft corrected on app-still need the code change letter or change rescheck, manual J's & drawings to reflect which code is being used
|
Intake Approval | | | 2/22/2018 | | FAIL |
|
|
|
need-code letter, seperate all drawings and uploaded individually to face correctly, bottom right corner needs to be left open for approved stamp, building cross ection and stair section, seperate basement sq foot on drawings to reflect garage and living area, include patio/decks on app
|
Application received | | | 2/20/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 20 2018 9:09PM
|