BLD-Final | 6/3/2019 | 6/4/2019 | 6/4/2019 | A | PASS |
Dave Hannah
|
|
|
Jay Phone #: ###-####
|
DOC - Permit Finaled | 6/4/2019 | 6/4/2019 | 6/4/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 8/31/2018 | 9/4/2018 | 9/4/2018 | A | PASS |
Dave Hannah
|
|
|
Jay Phone #: ###-####
|
BLD-Framing/Rough-in | 8/29/2018 | 8/29/2018 | 8/30/2018 | P | PEND |
Dave Hannah
|
|
|
Jay Phone #: ###-#### framing and air seal ok but needs elec rough in and mec before insulating
|
BLD-Framing/Rough-in | 8/27/2018 | 8/27/2018 | 8/27/2018 | P | NR |
Dave Hannah
|
|
|
Jay Phone #: ###-#### needs air seal city aproved plans
|
BLD-Wall Bracing | 7/5/2018 | 7/6/2018 | 7/6/2018 | A | PART |
Dave Hannah
|
|
|
Jay Phone #: ###-#### ok to cover ext but needs hold downs at double doors in studio
|
BLD-Foundation | 6/1/2018 | 6/1/2018 | 6/1/2018 | P | PASS |
Dave Hannah
|
|
|
Jay Phone #: ###-####
|
BLD-Foundation | 5/30/2018 | 5/30/2018 | 5/30/2018 | P | PART |
Mike Jordan
|
|
|
wall // Jay Phone #: ###-####
|
BLD-Footing | 5/3/2018 | 5/3/2018 | 5/3/2018 | P | PASS |
Dave Hannah
|
|
|
Jay Phone #: ###-####
|
BLD-Foundation | 5/2/2018 | 5/3/2018 | 5/3/2018 | A | NR |
Dave Hannah
|
|
|
Jay Phone #: ###-####
|
BLD-Foundation | 5/1/2018 | 5/2/2018 | 5/2/2018 | A | PART |
Dave Hannah
|
|
|
Jay-would like late AM if possible-pour time 1:00 Phone #: ###-#### garage ok
|
BLD-Footing | 4/30/2018 | 4/30/2018 | 4/30/2018 | A | PASS |
Brandon Shaw
|
|
|
Set backs are as per plans
|
BLD-Footing | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | CANC |
Brandon Shaw
|
|
|
Jay Phone #: ###-####
|
Issue PAID IN FULL permit | | | 4/25/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 2/21/2018 | | |
|
|
|
|
Routing Walk-In (Zoning) | 2/21/2018 | 2/21/2018 | 2/21/2018 | A | DONE |
Jeff Lowe
|
|
|
toilet/sink only in accessory structure
|
Routing Walk-In (BLD) | 2/21/2018 | 2/21/2018 | 2/21/2018 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 2/21/2018 | | 2/21/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 2/21/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 2/21/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 2/21/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/21/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 2/21/2018 | | DONE |
|
|
|
Need
RP (needs updated)
|
Application received | | 2/21/2018 | | | |
|
|
|
|