Description
(FEDERAL WAY INDUSTRIAL BUILDING – Shell and Core) This building is fire sprinklered in accordance with NFPA 13 with 60 ft yards for unlimited area. Permit for the construction of a new 117,432 sq. ft., 1-story concrete tilt-up shell building and associated site work. Scope of work includes: construction of slab on grade concrete foundation, concrete tilt up construction, construction of new steel bar-joist roof framing / steel pan deck, electrical, mechanical, plumbing. All work shall comply with the approved plans, DRH17-00143 and all applicable codes. Utilizes ANSI/ASHREA 90.1. Special Inspections Required, see form 310. A separate permit is required prior to occupying this structure and a separate racking permit is required if racks are installed over 8 feet in height. Separate permits will be required for the building fire protection systems, as regulated by the Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  6/24/2019 DONE
Meeting  6/24/2019 DONE
emailed court about final value on plumbing
Third Notice 5/11/20196/7/2019 DONE
mailed 6-10 with first follow up letter
First Follow up  6/7/2019 DONE
Third Notice 4/13/20195/6/2019 DONE
mailed 5-10-19
Third Notice 3/16/20194/8/2019 DONE
mailed 4/11
Second Notice 2/17/20193/11/2019 DONE
mailed 3-12-19
Letter of compliance/Occupancy  3/6/2019 DONE
Letter of compliance/Occupancy  3/6/2019 DONE
First Notice1/31/20191/31/20192/7/2019 DONE
DetailsJim Storey
mailed 2-11-19
FIRE-Final Inspection1/30/20191/31/20191/31/2019PPASS
DetailsJim Page
Final life fire safety inspection for core and shell complete.

Michael Phone #: ###-####
BLD-Final1/30/20191/31/20191/31/2019PPASS
DetailsJim Storey
Michael Phone #: ###-####
DOC - Permit Finaled1/31/20191/31/20191/31/2019PPASS
DetailsJim Storey
FIRE-Final Inspection1/29/20191/30/20191/30/2019PCANC
DetailsJim Page
Michael Phone #: ###-####-1--30-19 Mike called and cancelled
BLD-Conference1/23/20191/24/20191/24/2019ADONE
DetailsJim Storey
Courtesy inspection for mezzanine walls // Mike Phone #: ###-####
BLD-Framing/Rough-in1/22/20191/23/20191/23/2019ADEFR
DetailsJim Storey
Courtesy inspection for mezzanine walls // Mike Phone #: ###-#### out of time
BLD-Energy code compliance1/22/20191/22/20191/22/2019PPASS
DetailsJim Storey
Mike Phone #: ###-#### ele rm ok to cover
BLD-Framing/Rough-in1/17/20191/17/20191/17/2019PPASS
DetailsJim Storey
Michael Phone #: ###-#### east end of ele rm ok to cover.
BLD-Conference1/14/20191/16/20191/16/2019PPASS
DetailsJim Storey
Mike Phone #: ###-####
BLD-Grading Inspection1/10/20191/11/20191/11/2019ANR
DetailsJim Storey
Michael Pearson On Site Superintendent Phone #: ###-#### Inspection requested via web by Larry Monkarsh
BLD-Energy code compliance1/10/20191/11/20191/11/2019ANR
DetailsJim Storey
Michael Pearson On Site Superintendent Phone #: ###-#### Inspection requested via web by Larry Monkarsh
BLD-Framing/Rough-in12/26/201812/26/201812/26/2018PPART
DetailsJim Storey
Mike Phone #: ###-#### need ti number// backing for ada// all trades signed off.
BLD-Wall Bracing12/3/201812/3/201812/3/2018PPASS
DetailsJim Storey
Bryce Phone #: ###-####
BLD-Framing/Rough-in11/27/201811/27/201811/27/2018PPASS
DetailsJim Storey
Bruce Phone #: ###-#### ele room ok/ east demizing wall ok
BLD-Framing/Rough-in11/14/201811/15/201811/15/2018APASS
DetailsJim Storey
Brice Phone #: ###-#### exterior roofs at vestables ok to cover
BLD-Other10/18/201810/18/201810/23/2018PPASS
DetailsJim Storey
Bryce-roof deck-2nd half Phone #: ###-#### si
BLD-Framing/Rough-in10/12/201810/15/201810/15/2018APASS
DetailsJim Storey
Bryce-decking on a reroof Phone #: ###-#### si passed for decking/ need verifacation of 2 inch poly iso to meet 11.6 r
BLD-Other8/22/20188/27/20188/27/2018PPART
DetailsJim Storey
rebar insp // Bryce Phone #: ###-#### placed w s/i
BLD-Other8/22/20188/24/20188/24/2018PPASS
DetailsJim Storey
rebar insp // Bryce Phone #: ###-#### si on site
BLD-Foundation8/14/20188/15/20188/15/2018PPASS
DetailsJim Storey
rebar // Bryce Phone #: ###-#### rebar ok pending si reports
BLD-Concrete8/6/20188/8/20188/8/2018PPASS
DetailsJim Storey
please call ahead // Bryce Phone #: ###-#### pending si report
BLD-Foundation7/26/20187/31/20188/1/2018PPART
DetailsJim Storey
Bryce-rebar Phone #: ###-#### pending si report
BLD-Concrete7/23/20187/25/20187/25/2018PPART
DetailsJim Storey
rebar- Bryce Phone #: ###-#### wip ok pending si report
BLD-Concrete7/23/20187/23/20187/23/2018APASS
DetailsJim Storey
si pannels as noted on site
BLD-Footing7/13/20187/16/20187/16/2018PPASS
DetailsJim Storey
Carl Phone #: ###-#### north east ft ok ufer ground in place ok/ pannels wip
BLD-Other6/8/20186/11/20186/11/2018PPASS
DetailsJim Storey
vipor bearer- Carl Phone #: ###-#### south end slab on grade ok to cover
BLD-Foundation5/29/20185/30/20185/30/2018PPASS
DetailsJim Storey
rebar // Carl Phone #: ###-#### north slab ok
BLD-Other5/23/20185/24/20185/24/2018ADEFR
DetailsJim Storey
Carl -for conduits underneath the footing Phone #: ###-#### need ele permit and ele insp.
BLD-Footing5/22/20185/23/20185/23/2018APASS
DetailsJim Storey
Carl Phone #: ###-#### interior ft and rebar ok area a pending si reports
Issue PAID IN FULL permit  5/11/2018 DONE
Inspection Record Card- Bld  5/11/2018 DONE
(F) Reprint permit  5/11/2018 DONE
Inspection Record Card- Bld  5/11/2018 DONE
OVERRIDE  5/8/2018  
Permit Ready to Issue  5/8/2018 DONE
ALL MET
Need:
GC form
Revised cert of value from GC
RP
Plan assigned to (JAR)3/1/20183/1/20185/7/2018 DONE
DetailsJulie Romig
**1st Rev Comp - 3rd Rec'd 05/03 - 502 Federal Way Industrial Bldg
Routing - PLAN CHECK5/3/2018 5/7/2018 PASS
DetailsJulie Romig
PLANS/APPL TAKEN TO FRONT DESK  5/7/2018 DONE
Routing Off Site - STRUCTURAL4/24/2018 5/1/2018 PASS
DetailsJulie Romig
2nd Review
Routing - FIRE4/24/20184/24/20184/30/2018 PASS
DetailsAdele J Schaffeld-Griffin
revised plans addressed comments resubmittal eplan
Routing PW Solid Waste4/24/2018 4/25/2018 PASS
DetailsEvan Carpenter
Application received 4/24/20184/24/2018 DONE
Routing PW Drainage4/24/2018 4/24/2018 PASS
DetailsBrian Murphy
Routing PW Sewer Design4/24/2018 4/24/2018 PASS
DetailsDeAnn Brown
Routing - PLAN CHECK4/24/2018 4/24/2018 FAIL
DetailsJulie Romig
2nd Review - report emailed to architect.
Routing PW Street Lights4/24/2018 4/24/2018 PASS
DetailsTom Marshall
Route to Impact Fee Review4/17/20184/20/20184/18/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  4/17/2018 FAIL
Routing - PLAN CHECK3/1/2018 4/17/2018 FAIL
DetailsJulie Romig
Routing - FIRE3/1/20183/1/20183/13/2018 FAIL
DetailsScott Arellano
Attached comments and emailed architect
Routing Off Site - STRUCTURAL3/1/2018 3/13/2018 FAIL
DetailsJulie Romig
Routing - MECHANICAL3/1/2018 3/8/2018 PASS
DetailsTroy James
Routing PW Solid Waste3/1/2018 3/7/2018 FAIL
DetailsEvan Carpenter
Submitted site plans do not match in terms of solid waste enclosure locations. Sheet A-101 needs to match C1.0; the enclosures in A-101 are inaccessible to collection vehicles.
Routing - Erosion and Sediment3/1/2018 3/5/2018 PASS
DetailsMichael Zawacki
RP Needed prior to permit issue. Site inspection required.
Routing PW Street Lights3/1/2018 3/2/2018 FAIL
DetailsTom Marshall
Routing PW Sewer Design3/1/2018 3/1/2018 FAIL
DetailsMike Sheppard
Sewer revision required
Routing PW Environmental3/1/2018 3/1/2018 PASS
DetailsTerry Alber
Intake Approval  3/1/2018 PASS
Routing PW Drainage3/1/2018 3/1/2018 FAIL
DetailsBrian Murphy
NO SEEPAGE BED
Routing - PLUMBING3/1/2018 3/1/2018 PASS
DetailsBill VanDegrift
Per plans and ISPC.
Routing - PLANNING3/1/2018 3/1/2018 PASS
DetailsDavid Moser
See DRH17-00143 - Current Planning review not required, allowed use in M-1D zone
Routing - Addressing3/1/2018 3/1/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS3/1/2018 3/1/2018 PASS
DetailsRachael Beierle
Routing - Design Review3/1/2018 3/1/2018 PASS
DetailsKatelyn Menuge
DRH17-00143
Intake Approval  2/26/2018 FAIL
DetailsJulie Romig
1. Structural Calculations - indicated on checklist but not found in documents.
2. G-001 States applicable codes as the 2012 codes. The 2015 codes were adopted on Jan. 1, 2018. Update codes to 2018 codes or submit letter by February 28th requesting review under the previous codes.
3. Structural sheets - are stamped but not signed - upload signed sheets.
Application received  2/21/2018 DONE
Application submitted via PDS Online on Feb 21 2018 9:12AM