Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD18-00622
StatusIssued
Name H20 POOLS & DESIGN LLC
Site Address 1820 N MOCKBEE PL
Project NamePuoppolo Poolo
Customer Number 
ePlanReviewNo
Description
Permit for a 300sq’ (12x25) shotcrete swimming pool. Barrier requirements per 2015 ISPSC being satisfied with an autocover. All work per plans, engineering, & local code. Separate electrical permit required. **JAB** A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. Please allow 24 hours for subgrade approval processing. If you have any questions call Melissa Jannusch 208-608-7168.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.


A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection8/24/20188/24/20188/24/2018 PEND
DetailsTony Young
BLD-Foundation4/11/20184/12/20184/12/2018PPASS
DetailsDave Hannah
rebar // Mark Phone #: ###-####
PubWorks Subgrade Approval4/11/20184/11/20184/11/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

OVERRIDE  3/20/2018  
Telephone call  3/20/2018 DONE
Spoke with Lance informing him that this permit is ready and the fee amount for issuance
Issue PAID IN FULL permit  3/20/2018 DONE
Permit Ready to Issue  3/20/2018 DONE
Plan assigned to (JAB) Josh2/22/20182/22/20183/19/2018 PASS
DetailsJosh Bogle
1st done - pool, Hillside - need barrier requirements - JAB
Routing - Erosion and Sediment3/14/2018 3/19/2018 PASS
DetailsAndy J. Long
ESC plan waiver approved. Notified pool contractor site praparation inspection is required. OK for homeowner RP, requested H2O pools take certification class.
Routing - PLAN CHECK3/2/2018 3/19/2018 PASS
DetailsJosh Bogle
1st review completed  3/19/2018 DONE
DetailsJosh Bogle
Inspection Record Card- Bld  3/19/2018 DONE
DetailsJosh Bogle
Case Summary (BLD)  3/19/2018 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  3/19/2018 DONE
DetailsJosh Bogle
Plan resubmittals received  3/15/2018 DONE
resubmittals received 2 each-ESC1 (sheet) and ESC design plan-stamped and took to JAB
Routing - PUBLIC WORKS3/14/2018 3/14/2018 PASS
DetailsMorgan Webb
Routing PW Grading-Hillside3/2/2018 3/14/2018 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. Please allow 24 hours for subgrade approval processing. If you have any questions call Melissa Jannusch ###-####.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call ###-#### to schedule an inspection.


A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Plan resubmittals received  3/12/2018 DONE
received 3 copies of geotech report; taken to JAB
Plan resubmittals received  3/1/2018 DONE
resubmittals recieced 3 sets of sheets A.0, A.0, DETAIL PLAN, FOOT NOTES,C1, dETAIL 12 SC & STRUC CALCS-took to JAB
1st review completed  2/26/2018 DONE
DetailsJosh Bogle
Routing PW Grading-Hillside2/22/2018 2/26/2018 FAIL
DetailsMelissa Jannusch
Needs full geotechnical report. Correction requested to applicant on 2-26-18.
Routing - Erosion and Sediment2/26/2018 2/26/2018 FAIL
DetailsMichael Zawacki
Hillside lot. Needs ESCP & Site map. Rated category 2 for amount of grading required and retaining walls.
Routing - PLAN CHECK2/22/2018 2/26/2018 FAIL
DetailsJosh Bogle
Barrier requirements not noted - JAB
Routing Walk-In (Zoning)2/23/20182/23/20182/23/2018PPASS
DetailsNicolette Womack
Routing Walk-In (Zoning)2/22/20182/22/20182/22/2018PFAIL
DetailsNicolette Womack
Appeal period ends 2-23-18. Meets requirements.
Routing Walk-In (BLD)2/22/20182/22/20182/22/2018PFAIL
DetailsJosh Bogle
Hillside - took in as a Level 2
Application received 2/22/2018   
Routing - PUBLIC WORKS2/26/2018   FAIL
SEE HILLSIDE