Meeting | | | 6/24/2019 | | DONE |
|
|
|
Hardie Board fiber cement permitted through DRH16-00403. Siding to match reveal and be smooth, with no artificial grains.
|
BLD-Final | 11/16/2018 | 11/19/2018 | 11/19/2018 | A | PASS |
Tony Young
|
|
|
ok now to final
|
DOC - Permit Finaled | 11/19/2018 | 11/19/2018 | 11/19/2018 | P | PASS |
Tony Young
|
|
|
|
OVERRIDE | | | 11/16/2018 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/16/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/16/2018 | | 11/16/2018 | | PASS |
Josh Bogle
|
|
|
modified scope per applicant e-mail
|
Case Summary (BLD) | | | 11/16/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 11/16/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/16/2018 | | DONE |
|
|
|
|
Zoning Approval | 11/13/2018 | 11/13/2018 | 11/13/2018 | | DONE |
Ted Vanegas
|
|
|
|
BLD-Final | 11/6/2018 | 11/8/2018 | 11/8/2018 | A | PART |
Tony Young
|
|
|
Kristi Phone #: ###-####,, garage part ok
|
BLD-Final | 11/5/2018 | 11/6/2018 | 11/6/2018 | A | NR |
Tony Young
|
|
|
Kristi Phone #: ###-####,, needs historical and handrails
|
Routing Walk-In (BLD) | 9/17/2018 | 9/17/2018 | 9/17/2018 | A | PASS |
Josh Bogle
|
|
|
talked with applicant about Modifying the permit - decided to open a new permit
|
CHANGE STATUS TO (ISS) | | | 9/17/2018 | | DONE |
|
|
|
no modification per JAB
|
Plan Modification Accepted | | | 9/17/2018 | | DONE |
|
|
|
roof line
|
BLD-Energy code compliance | 8/6/2018 | 8/6/2018 | 8/6/2018 | P | PASS |
Tony Young
|
|
|
Matt Phone #: ###-####
|
Telephone call | | | 8/6/2018 | | DONE |
|
|
|
Parcel owner Kristi Johnson called and will be taking over as GC. She will be coming in to submit transfer letter and sign GC form, no fee for transfer into parcel owners name.
|
BLD-Framing/Rough-in | 7/30/2018 | 7/31/2018 | 7/31/2018 | P | PASS |
Tony Young
|
|
|
Matt Phone #: ###-####
|
BLD-Framing/Rough-in | 7/20/2018 | 7/20/2018 | 7/20/2018 | P | NR |
Tony Young
|
|
|
Matt Phone #: ###-####
|
BLD-Framing/Rough-in | 7/5/2018 | 7/6/2018 | 7/6/2018 | P | FAIL |
Jim Storey
|
|
|
Matt Phone #: ###-#### not per plan engineer field review for as built aproval
|
BLD-Wall Bracing | 5/7/2018 | 5/7/2018 | 5/7/2018 | P | PASS |
Tony Young
|
|
|
shear-Matt Phone #: ###-####
|
BLD-Foundation | 3/20/2018 | 3/20/2018 | 3/20/2018 | A | PASS |
Dave Hannah
|
|
|
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
BLD-Footing | 3/19/2018 | 3/20/2018 | 3/20/2018 | A | PASS |
Tony Young
|
|
|
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
BLD-Conference | 3/19/2018 | 3/19/2018 | 3/19/2018 | P | PASS |
Tony Young
|
|
|
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro ,, set backs appear ok
|
Issue PAID IN FULL permit | | | 2/28/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 2/23/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 2/22/2018 | 2/22/2018 | 2/23/2018 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 2/23/2018 | | 2/23/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 2/23/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 2/23/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 2/23/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/23/2018 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 2/23/2018 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Telephone call | | | 2/23/2018 | | DONE |
Christina Prado
|
|
|
Call Matt, gave fees due and advised permit is ready for pick up
|
Routing Walk-In (Zoning) | 2/22/2018 | 2/22/2018 | 2/22/2018 | P | PASS |
Ted Vanegas
|
|
|
|
Routing Walk-In (BLD) | 2/22/2018 | 2/22/2018 | 2/22/2018 | P | PASS |
Josh Bogle
|
|
|
took in as a level 2
|
Application received | | 2/22/2018 | | | |
|
|
|
|