Print Statement | | | 1/22/2020 | | DONE |
|
|
|
FIRST PAST DUE NOTICE
|
Print Statement | | | 12/26/2019 | | DONE |
|
|
|
|
Second Notice | | 11/23/2019 | 11/13/2019 | | DONE |
|
|
|
This permit finaled on the web by Kareen Falls
|
First Notice | | 10/5/2019 | 10/29/2019 | | DONE |
|
|
|
mailed 11-1
|
BLD-Final | 9/24/2019 | 9/25/2019 | 9/25/2019 | A | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. OK for perm occ.
|
Permanent Occupancy | | | 9/25/2019 | | DONE |
|
|
|
|
FIRE-Final Inspection | 9/23/2019 | 9/24/2019 | 9/24/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Jim Phone #: ###-####
|
Zoning Approval | 9/24/2019 | 9/24/2019 | 9/24/2019 | | PASS |
Katelyn Menuge
|
|
|
|
FIRE-Final Inspection | 9/23/2019 | 9/23/2019 | 9/23/2019 | P | CANC |
Troy Cobbley
|
|
|
Need the FIR inspection for the range hoods scheduled/passed. Jim Phone #: ###-####
|
FIRE-Final Inspection | 9/18/2019 | 9/19/2019 | 9/19/2019 | A | FAIL |
Troy Cobbley
|
|
|
Previous correctlons have been addressed but additional permits are required for the residential type 1 hood extinguishing systems. Jim Phone #: ###-####
|
FIRE-Final Inspection | 9/11/2019 | 9/12/2019 | 9/12/2019 | P | FAIL |
Jim Page
|
|
|
FIR permits for hood suppression and fire alarm need to be finaled before life fire safety can be signed as complete. Provice internally illuminated exit signage and emergency lighting on exterior gates. Fire caulk condensate drain hole in riser room, riser room is a 1 hour rated assembly. Escutcheon in level 1 common restroom does not cover the entire sprinkler hole, escutcheon must cover entire hole. Remove masking from sprinkler heads in level 2 janitors closet and mech room.
Jim Phone #: ###-####
|
BLD-Conference | 9/11/2019 | 9/12/2019 | 9/12/2019 | A | CANC |
Brandon Shaw
|
|
|
Jim Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 8/13/2019 | | DONE |
|
|
|
plan mod
|
BLD-Ceiling Grid Inspection | 7/25/2019 | 7/25/2019 | 7/25/2019 | A | PART |
Tell Riley
|
|
|
//ok to cover all grid//kitchen area not ready//trades passed rough in for grid cover//
|
Route to Impact Fee Review | 7/18/2019 | 7/21/2019 | 7/19/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan assigned to (CDM) | 7/18/2019 | 7/18/2019 | 7/18/2019 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 7/18/2019 | | 7/18/2019 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLUMBING | 7/18/2019 | | 7/18/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC
plan mod was put on bld17-04447 and should have been on this one
|
Routing - MECHANICAL | 7/18/2019 | | 7/18/2019 | | PASS |
Troy James
|
|
|
plan mod was done one bld17-04447 and should have been done on this one
|
Permit Ready to Issue | | | 7/18/2019 | | DONE |
|
|
|
plan mod accepted
|
Plan Modification Accepted | | | 7/18/2019 | | DONE |
|
|
|
1. Removal of rooms: RECORD/INCENTIVE/KETTLE STORAGE-157 and GYM STORAGE-158
2. Removal of wall between room 157 and 158. New open space converted into FOOD PANTRY-157.
3. Addition of walk-in freezer, 3-door refrigerators and coffin freezers into FOOD PANTRY-157.
4. Light fixtures, electric circuits and HVAC modified for new space usage in FOOD PANTRY-157.
|
BLD-Framing/Rough-in | 5/7/2019 | 5/8/2019 | 5/8/2019 | A | PASS |
Mike Jordan
|
|
|
Hi Mike,,, west single story hard lids for cover Phone #: ###-#### Inspection requested via web by Jim Carriveau
|
BLD-Energy code compliance | 4/22/2019 | 4/22/2019 | 4/22/2019 | A | PASS |
Mike Jordan
|
|
|
Hello Mike west single story, exterior wall insulation for cover Phone #: ###-#### Inspection requested via web by Jim Carriveau
|
BLD-Framing/Rough-in | 4/22/2019 | 4/22/2019 | 4/22/2019 | A | PASS |
Mike Jordan
|
|
|
Hello Mike west single story, exterior wall insulation for cover Phone #: ###-#### Inspection requested via web by Jim Carriveau. Interior steel stud framed walls ok.
|
BLD-Framing/Rough-in | 1/29/2019 | 1/30/2019 | 1/30/2019 | A | PASS |
Mike Jordan
|
|
|
Hello Michael, looking for framing inspection to proceed with exterior drywall west single story Phone #: ###-#### Inspection requested via web by Jim Carriveau. Exterior steel stud framing ok to sheet exterior side.
|
BLD-Framing/Rough-in | 1/24/2019 | 1/25/2019 | 1/25/2019 | A | PASS |
Mike Jordan
|
|
|
Hi Mike, looking to drywall roof parapet of west single story Phone #: ###-#### Inspection requested via web by Jim Carriveau. West single story parapet ok for cover.
|
BLD-Foundation | 7/13/2018 | 7/13/2018 | 7/13/2018 | A | PASS |
Mike Jordan
|
|
|
Hi Mike we have a 12:00 placement scheduled for the west structure, all stem walls. Strata will be onsite for rebar and concrete testing. Phone #: ###-#### Inspection requested via web by Jim Carriveau. perimeter and interior stemwalls for west structure(gym and school)
|
BLD-Other | 7/3/2018 | 7/6/2018 | 7/6/2018 | P | PART |
Jim Sly
|
|
|
late friday please // rebar insp // Doug Phone #: ###-#### 3:32 pm No one on site. Called Doug. This will be the 2nd Footing pour. STRATA has been on site, and will be on site Very Early Monday am. when they pour.
|
CHANGE STATUS TO (ISS) | | | 6/5/2018 | | DONE |
|
|
|
change back to ISS
|
Issue PAID IN FULL permit | | | 5/24/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/24/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 5/23/2018 | | |
|
|
|
|
Plan assigned to (CDM) | 2/24/2018 | 2/24/2018 | 5/23/2018 | | PASS |
Carl D Madsen
|
|
|
1st comp Salvation Army
|
Routing - Design Review | 5/11/2018 | | 5/23/2018 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PUBLIC WORKS | 5/11/2018 | | 5/23/2018 | | PASS |
Rachael Beierle
|
|
|
firewall required. routed only.
|
Routing PW Environmental | 5/23/2018 | | 5/23/2018 | | PASS |
Rick Christenson
|
|
|
No plans reviewed. Firewall installation only.
|
Routing PW Solid Waste | 5/23/2018 | | 5/23/2018 | | PASS |
|
|
|
Signed off per Eplan
|
Routing PW Sewer Design | 5/23/2018 | | 5/23/2018 | | PASS |
DeAnn Brown
|
|
|
|
Routing PW Street Lights | 5/23/2018 | | 5/23/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Drainage | 5/23/2018 | | 5/23/2018 | | PASS |
Brian Murphy
|
|
|
|
Permit Ready to Issue | | | 5/23/2018 | | DONE |
|
|
|
NEED
ACHD
RP
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/23/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/11/2018 | | 5/22/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLANNING | 5/11/2018 | | 5/22/2018 | | PASS |
David Moser
|
|
|
|
Routing - Addressing | 5/11/2018 | | 5/22/2018 | | PASS |
Doug Chausow
|
|
|
|
Application received | | 2/23/2018 | 4/24/2018 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 2/24/2018 | | 4/24/2018 | | PASS |
Andy J. Long
|
|
|
|
Routing - FIRE | 2/24/2018 | 2/24/2018 | 2/28/2018 | | PASS |
Scott Arellano
|
|
|
Review comments under BLD17-04447
|
Routing - MECHANICAL | 2/24/2018 | | 2/26/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 2/24/2018 | | 2/26/2018 | | PASS |
Bill VanDegrift
|
|
|
|
Routing - PLANNING | 2/24/2018 | | 2/26/2018 | | FAIL |
David Moser
|
|
|
Need ROS for parcel consolidation and vacate easement on plat
|
Routing - Addressing | 2/24/2018 | | 2/26/2018 | | FAIL |
Doug Chausow
|
|
|
Parcel must be consolidated.
|
Routing - PUBLIC WORKS | 2/24/2018 | | 2/26/2018 | | FAIL |
Rachael Beierle
|
|
|
SEE ADDRESSING FOR FAIL
|
Routing - Design Review | 2/24/2018 | | 2/25/2018 | | FAIL |
Andrea Tuning
|
|
|
|
Routing - PLAN CHECK | 2/24/2018 | | 2/24/2018 | | PASS |
Carl D Madsen
|
|
|
|
Intake Approval | | | 2/24/2018 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 2/24/2018 | | 2/24/2018 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 2/24/2018 | | DONE |
|
|
|
|