Information based on query as of Thursday, June 20, 2024.
Permit Information
Permit NumberBLD18-00649
StatusFinaled
Name STATUS HOMES INC
Site Address 6108 W EVERETT ST
Project NameEverett House
Customer NumberBLD17-00348 DEMO
ePlanReviewYes
Description
Permit for the construction of a new 1579 sq. ft., two story (first story 848 sq. ft., second story 731 sq. ft.) single family dwelling with 4 bedrooms, 3 bathrooms, approximately 240 sq. ft. of covered patio/porch and a 380 sq. ft. attached garage per the approved plans, plan review report and any notations. Prescriptive Energy Compliance. R-1C zoning and setbacks per planning.
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/1/201810/2/201810/2/2018APASS
DetailsJim Sly
Please call ahead for access instructions - Vinnie Phone #: ###-####
Blower door...3.9
DOC - Permit Finaled10/2/201810/2/201810/2/2018PPASS
DetailsJim Sly
BLD-Energy code compliance7/26/20187/27/20187/30/2018PPASS
DetailsJim Sly
As late as possible, please call ahead // Kerry Phone #: ###-####
BLD-Framing/Rough-in7/26/20187/26/20187/26/2018PPASS
DetailsJim Sly
Kerry Phone #: ###-####
BLD-Conference7/26/20187/27/20187/26/2018PCANC
DetailsJim Sly
As late as posiblble // Kerry Phone #: ###-#### Inspection cancelled from web by: Keeley Wilson
Plan Modification Accepted  7/26/2018 DONE
new manual j report
Routing - MECHANICAL7/26/2018 7/26/2018 PASS
DetailsTroy James
resubmitted manual j report
BLD-Framing/Rough-in7/25/20187/25/20187/25/2018PNR
DetailsJim Sly
Kerry Phone #: ###-####
Mechanical Red Tag still in window...3PM
BLD-Framing/Rough-in7/23/20187/24/20187/24/2018PNR
DetailsJim Sly
Kerry Phone #: ###-####
Need Mech rough in approval.
BLD-Framing/Rough-in7/20/20187/23/20187/23/2018PNR
DetailsJim Sly
late late pm- Kerry Phone #: ###-####
Need Mech rough-in approval.
BLD-Wall Bracing7/18/20187/18/20187/18/2018PPASS
DetailsJim Sly
said he talked to you and set up for this AM // Carey Phone #: ###-####
BLD-Wall Bracing7/9/20187/9/20187/9/2018PFAIL
DetailsJim Sly
Kerry Phone #: ###-####
C/N posted
BLD-Wall Bracing5/25/20185/30/20185/30/2018APART
DetailsJim Sly
Jose Phone #: ###-####
Should be FOUNDATION WALL...........OK.
BLD-Footing5/24/20185/25/20185/25/2018PPART
DetailsJim Sly
Jose Phone #: ###-####
No forms or string lines pulled. Met with Jose. We found 3 pins and a witness stake (front East) Pour at own risk.
OVERRIDE  5/17/2018  
Plan assigned to (RDP)3/6/20183/6/20185/17/2018 DONE
DetailsRob Patrick
3/19 sfd L1 ePlan....5/10 Failed: Corrections Required.
Routing - PLAN CHECK5/17/2018 5/17/2018 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  5/17/2018 DONE
DetailsRob Patrick
Permit Ready to Issue  5/17/2018 DONE
verify who the RP is-thee are 4 names of the same name in the RP's
Inspection Record Card- Bld  5/17/2018 DONE
Issue PAID IN FULL permit  5/17/2018 DONE
Routing - PLAN CHECK5/10/2018 5/10/2018 FAIL
DetailsRob Patrick
Requires corrections not addressed in last version.
Routing - PLANNING5/1/2018 5/4/2018 PASS
DetailsKatelyn Menuge
Redlined the remaining changes needed for Design Review.
Routing - PLAN CHECK4/18/2018 4/18/2018 FAIL
DetailsRob Patrick
Corrections Required
Routing - PLANNING4/17/2018 4/17/2018 FAIL
DetailsKatelyn Menuge
Corrections required to meet conditions of DRH17-00237.
1st review completed  3/22/2018 FAIL
DetailsRob Patrick
Waiting for new Design Review Application to be filed.
Route to Impact Fee Review3/6/20183/9/20183/7/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Addressing3/6/2018 3/7/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS3/6/2018 3/7/2018 PASS
DetailsRachael Beierle
Routing - MECHANICAL3/6/2018 3/7/2018 PASS
DetailsTroy James
Routing - PLANNING3/6/2018 3/6/2018 FAIL
DetailsKatelyn Menuge
Drawings do not match Design Review Approval. Need to submit new Design Review application for this new design.
Plans ACCEPTED BY PLAN TECH  3/6/2018 DONE
Intake Approval  3/6/2018 PASS
Recd Pcfee & Taken To Pln CK  3/6/2018 DONE
Intake Approval  3/1/2018 FAIL
need to rotate plans, name plans correctly and use 2015 code
Application received  2/23/2018 DONE
Application submitted via PDS Online on Feb 23 2018 11:33AM
Routing - PLAN CHECK3/6/2018   FAIL
DetailsRob Patrick
Waiting for new Design Review Application to be filed.