BLD-Final | 8/17/2018 | 8/20/2018 | 8/20/2018 | A | PASS |
Dave Hannah
|
|
|
Kirsten-please call to meet Phone #: ###-####
|
DOC - Permit Finaled | 8/20/2018 | 8/20/2018 | 8/20/2018 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 5/16/2018 | 5/21/2018 | 5/21/2018 | A | PASS |
Dave Hannah
|
|
|
Kersten Phone #: ###-####
|
BLD-Framing/Rough-in | 5/15/2018 | 5/16/2018 | 5/16/2018 | P | PASS |
Dave Hannah
|
|
|
Kersten Phone #: ###-####
|
BLD-Framing/Rough-in | 5/11/2018 | 5/14/2018 | 5/14/2018 | A | PART |
Dave Hannah
|
|
|
Kirsten (downstairs section only) Phone #: ###-#### ok to cover cieling in kitchen
|
BLD-Conference | 5/1/2018 | 5/1/2018 | 5/1/2018 | P | DONE |
Dave Hannah
|
|
|
Call ahead // Kirsten Phone #: ###-####
|
BLD-Conference | 4/19/2018 | 4/19/2018 | 4/19/2018 | P | DONE |
Dave Hannah
|
|
|
Kirsten Phone #: ###-####
|
BLD-Conference | 4/16/2018 | 4/16/2018 | 4/17/2018 | P | DONE |
Dave Hannah
|
|
|
Darren-opened up subflooring in bathroom, check integrity of floor- call for access Phone #: ###-#### needs to reframe floor for bathroom
|
BLD-Other | 4/5/2018 | 4/5/2018 | 4/6/2018 | P | PART |
Dave Hannah
|
|
|
Please call ahead for access / Joist verification - Kersten Phone #: ###-#### floor ceiling framing 7 1/2 inch lvls for second fl ok to cover
|
Routing Walk-In (BLD) | 3/9/2018 | 3/9/2018 | 3/9/2018 | A | FAIL |
Josh Bogle
|
|
|
getting closer : )
|
Routing Walk-In (BLD) | 3/9/2018 | 3/9/2018 | 3/9/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 3/9/2018 | | 3/9/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 3/9/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/9/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/9/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 3/9/2018 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 3/9/2018 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 3/7/2018 | | DONE |
Josh Bogle
|
|
|
e-mailed submittal requirements to applicant & architect
|
Routing Walk-In (Zoning) | 2/26/2018 | 2/26/2018 | 2/26/2018 | P | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 2/26/2018 | 2/26/2018 | 2/26/2018 | P | FAIL |
Josh Bogle
|
|
|
needed structural details - JAB
|
Routing - PLAN CHECK | 2/26/2018 | | 2/26/2018 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 2/26/2018 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 2/26/2018 | | | |
|
|
|
|