Permit Information
Permit NumberBLD18-00667
StatusFinaled
Name CANYON CREST HOMES
Site Address 1779 N MOCKBEE PL
Project Name10-1 Sherman
Customer Number 
ePlanReviewYes
Description
*This structure is required to have a NFPA 13D fire sprinkler system.*** Prescriptive component energy approach*** WUI ZONE A REQUIREMENTS*** HILLSIDE = IN*** Permit for the construction of a new 2871 sq. ft., two story (first story 1647 sq. ft., second story 1224 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 372 sq. ft. of covered patio/porch and a 766 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1B zoning and setbacks per planning. MDH

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/5/20194/8/20194/8/2019APASS
DetailsTony Young
3283 keycode Phone #: ###-#### Inspection requested via web by David Wipper
DOC - Permit Finaled4/8/20194/8/20194/8/2019PPASS
DetailsTony Young
c of o issued
BLD-Final4/4/20194/5/20194/5/2019PNR
DetailsTony Young
3283 keycode Phone #: ###-#### Inspection requested via web by David Wipper// needs smoke/carbon detector per plan,, top of stairs area
Extend Permit 90/180 days4/5/20194/5/20194/5/2019PDONE
DetailsTony Young
3283 keycode Phone #: ###-#### Inspection requested via web by David Wipper// 4.29
PubWorks Occupancy Approval4/2/20194/2/20194/2/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.

BLD-Aging Inspection3/1/20193/1/20193/7/2019 PEND
DetailsTony Young
BLD-Wall cover10/16/201810/17/201810/18/2018PPASS
DetailsDave Hannah
fire rated soffit inspection Phone #: ###-#### Inspection requested via web by David Wipper
BLD-Energy code compliance10/16/201810/17/201810/18/2018PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by David Wipper
BLD-Other10/18/201810/18/201810/18/2018APASS
DetailsDave Hannah
fire rated soffit inspection Phone #: ###-#### Inspection requested via web by David Wipper
BLD-Energy code compliance10/18/201810/18/201810/18/2018APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by David Wipper
BLD-Framing/Rough-in10/12/201810/15/201810/15/2018APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by David Wipper
BLD-Framing/Rough-in10/12/201810/12/201810/12/2018PCANC
DetailsTony Young
Phone #: ###-#### >> Inspection requested via web by David Wipper Inspection cancelled from web by: David Wipper
Plan Modification Accepted  10/3/2018 DONE
New manual j report
Routing - MECHANICAL10/3/2018 10/3/2018 PASS
DetailsTroy James
resubmitted manual j report
BLD-Wall Bracing9/25/20189/26/20189/26/2018APASS
DetailsJim Storey
Larry Phone #: ###-####
BLD-Footing8/3/20188/3/20188/3/2018PPART
DetailsTony Young
Phone #: 2086971241 >> Inspection requested via mobile web by Heron,, front garage redo
BLD-Foundation6/27/20186/28/20186/28/2018PPASS
DetailsTony Young
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo Lira
BLD-Foundation6/20/20186/20/20186/20/2018PPART
DetailsTony Young
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo Lira,, work in progress,, ok
BLD-Footing6/12/20186/13/20186/13/2018ADONE
DetailsTony Young
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo Lira
BLD-Footing6/11/20186/12/20186/12/2018APASS
DetailsTony Young
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo Lira
PubWorks Subgrade Approval6/12/20186/12/20186/12/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

BLD-Footing6/10/20186/11/20186/11/2018PCANC
DetailsBrandon Shaw
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo Lira Inspection cancelled via mobile web on Monday, June 11, 2018.
BLD-Footing6/10/20186/11/20186/10/2018ACANC
DetailsTony Young
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo Lira Inspection cancelled via mobile web on Sunday, June 10, 2018.
Issue PAID IN FULL permit  6/4/2018 DONE
Inspection Record Card- Bld  6/4/2018 DONE
OVERRIDE  4/6/2018  
Plan Reviewer's activity  4/6/2018 DONE
DetailsMichael Hanson
1st review completed  4/6/2018 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  4/6/2018 DONE
DetailsMichael Hanson
Permit Ready to Issue  4/6/2018 DONE
Plan assigned to (M_H)3/21/2018 4/6/2018 DONE
DetailsMichael Hanson
04/09 sfd L2 ePlan
Routing - PLAN CHECK3/21/2018 4/6/2018 PASS
DetailsMichael Hanson
Routing - FIRE3/21/20183/21/20183/27/2018 PASS
DetailsScott Arellano
*This structure is required to have a NFPA 13D fire sprinkler system.* Plans were reviewed for FD access, availability of hydrants and defensible space.
Routing PW Grading-Hillside3/21/2018 3/27/2018 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

Routing - Erosion and Sediment3/21/2018 3/26/2018 PASS
DetailsMichael Zawacki
Sherman Hollow Sub. Site prep inspection required.
Routing - MECHANICAL3/21/2018 3/23/2018 PASS
DetailsTroy James
Route to Impact Fee Review3/21/20183/24/20183/22/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - PLANNING3/21/2018 3/21/2018 PASS
DetailsSue Cummings
Routing - Addressing3/21/2018 3/21/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS3/21/2018 3/21/2018 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  3/21/2018 DONE
Intake Approval  3/21/2018 PASS
Recd Pcfee & Taken To Pln CK  3/21/2018 DONE
Application received  2/26/2018 DONE
Application submitted via PDS Online on Feb 26 2018 1:20PM
Intake Approval  2/26/2018 FAIL
Missing letter requesting to be review under 2012 code