BLD-Final | 10/3/2018 | 10/4/2018 | 10/4/2018 | A | PASS |
Tony Young
|
|
|
Clint Phone #: ###-####
|
DOC - Permit Finaled | 10/4/2018 | 10/4/2018 | 10/4/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 10/2/2018 | 10/3/2018 | 10/3/2018 | P | CANC |
Tony Young
|
|
|
mec hasn't not called in for final inspection per Clint Clint Phone #: ###-####
|
BLD-Energy code compliance | 7/5/2018 | 7/6/2018 | 7/6/2018 | A | PASS |
Brandon Shaw
|
|
|
Clint Phone #: ###-####
|
BLD-Conference | 6/29/2018 | 7/2/2018 | 7/2/2018 | P | PEND |
Tony Young
|
|
|
Clint Phone #: ###-####,, meet with plan review,, owner is looking into rated wall system and adding a interior wall for a mud room prior to entering the bedroom
|
BLD-Conference | 6/29/2018 | 6/29/2018 | 6/29/2018 | P | PEND |
Tony Young
|
|
|
Clint Phone #: ###-####,, meet with plan review,, Clint will go see plan review
|
BLD-Framing/Rough-in | 6/28/2018 | 6/29/2018 | 6/29/2018 | A | FAIL |
Tony Young
|
|
|
Clint Phone #: ###-####,, needs plan approval or changed to meet code,, ok to insulate
|
BLD-Framing/Rough-in | 6/27/2018 | 6/28/2018 | 6/28/2018 | P | NR |
Tony Young
|
|
|
Clint Phone #: ###-####,, ,future inspections to 415, // needs seal pack... ,, garage firewall/ bedroom entry issues, glass in firewall ?s
|
BLD-Wall Bracing | 5/22/2018 | 5/23/2018 | 5/23/2018 | A | PASS |
Dave Hannah
|
|
|
Clint Phone #: ###-####
|
BLD-Foundation | 3/19/2018 | 3/21/2018 | 3/21/2018 | A | PASS |
Dave Hannah
|
|
|
ben Phone #: ###-####
|
BLD-Footing | 3/16/2018 | 3/19/2018 | 3/19/2018 | A | PASS |
Dave Hannah
|
|
|
Ben Phone #: ###-####
|
OVERRIDE | | | 3/12/2018 | | |
|
|
|
|
Routing Walk-In (BLD) | 3/12/2018 | 3/12/2018 | 3/12/2018 | A | DONE |
Josh Bogle
|
|
|
resubmittals
|
Plan assigned to (JAB) Josh | 2/26/2018 | 2/26/2018 | 3/12/2018 | | PASS |
Josh Bogle
|
|
|
1st done - Need ES report, point loads, & egress
|
Routing - PLAN CHECK | 3/12/2018 | | 3/12/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 3/12/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 3/12/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/12/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/12/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 3/12/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/12/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/2/2018 | | 3/2/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - MECHANICAL | 2/26/2018 | | 3/2/2018 | | PASS |
Troy James
|
|
|
|
1st review completed | | | 3/2/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 2/26/2018 | 2/26/2018 | 2/26/2018 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 2/26/2018 | 2/26/2018 | 2/26/2018 | P | PASS |
Josh Bogle
|
|
|
took in as level 2 - routed to Mechanical - JAB
|
Application received | | 2/26/2018 | | | |
|
|
|
|