Permit Information
Permit NumberBLD18-00670
StatusFinaled
Name CONNER CONSTRUCTION LLC
Site Address 1122 E HIGHLAND VIEW DR
Project NameKlein Residence
Customer Number 
ePlanReviewYes
Description
***PLAN MODIFICATION 7-2-19 - Revising front driveway, relocating retaining walls and new driveway design. ***BJM*** PLAN MODIFICATION 9-6-18 - ELIMINATING RETAINING WALLS FOR THE PROPOSED POOL (NO POOL PROPOSED AS OF NOW), MODIFYING DECK AS PER PLANS, MODIFYING GRADING AND RETAINING WALLS AS PER PLANS, ELIMINATING STORAGE AREA ON LOWER LEVEL AND CONVERTING TO CRAWL SPACE. ***BJM** HILLSIDE, WUI FOOTHILLS, ZONE "A" REQUIREMENTS, CLASS "A" ROOF REQUIRED. Permit for the construction of a new 5,702 sq. ft., two story (first story 2,392 sq. ft., second story 957 sq. ft., below grade 2,353 sq. ft.) single family dwelling with 4 bedrooms, 4 and a half bathrooms, approximately 300 sq. ft. of covered patio/porch and an 834 sq. ft. attached garage per the approved plans and any notations. A-1 zoning and setbacks per planning. ***BJM***

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.


Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/16/20199/17/20199/17/2019APASS
DetailsTony Young
Call Chris when you are on your way. Phone #: ###-#### Inspection requested via web by Clayton Conner
DOC - Permit Finaled9/17/20199/17/20199/17/2019PPASS
DetailsTony Young
c of o issued
BLD-Final9/16/20199/16/20199/17/2019PDEFR
DetailsDave Hannah
Call Chris when you are on your way. Phone #: ###-#### Inspection requested via web by Clayton Conner
Routing PW Grading-Hillside9/4/2019 9/7/2019 PASS
DetailsMelissa Jannusch
PLAN MOD Approved

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

BLD-Final8/21/20198/21/20198/22/2019PPEND
DetailsTony Young
Final Inspection Phone #: ###-#### Inspection requested via web by Clayton Conner on site walk through,, working on stairs
BLD-Final8/12/20198/13/20198/21/2019APEND
DetailsTony Young
Final Inspection Phone #: ###-#### Inspection requested via web by Clayton Conner
BLD-Final8/9/20198/12/20198/12/2019PDEFR
DetailsTony Young
Final Inspection Phone #: ###-#### Inspection requested via web by Clayton Conner
BLD-Conference8/8/20198/9/20198/9/2019APART
DetailsTony Young
Clayton Phone #: ###-####,, walk through for final,, needs, hillside PW approval, guard rail interior, letter of approval on cable guard rails, general other items
OVERRIDE  8/9/2019  
PubWorks Occupancy Approval8/9/20198/9/20198/9/2019 DONE
DetailsMelissa Jannusch
bond posted for landscaping. Engineering approval letter recieved.
CHANGE STATUS TO (ISS)  8/9/2019 DONE
Inspection Record Card- Bld  8/9/2019 DONE
Permit Ready to Issue  8/9/2019 DONE
Plan mod approved- DO NOT ISSUE
Plan assigned to (BJM)7/2/20197/2/20198/8/2019 DONE
DetailsBrian McGowan
08/05- plan mod, HILLSIDE and GRADING approval needed
Routing - PLAN CHECK7/30/2019 8/6/2019 PASS
DetailsBrian McGowan
Must meet Planning requirements
Routing PW Grading-Hillside8/5/2019 8/5/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Routing - PLANNING8/2/2019 8/2/2019 PASS
DetailsNicolette Womack
Routing - PLANNING7/2/2019 7/9/2019 FAIL
DetailsNicolette Womack
Retaining Walls within the 20' front yard setback shall not exceed 3' in exposed height.
Routing PW Grading-Hillside7/2/2019 7/5/2019 FAIL
DetailsMelissa Jannusch
see changemark in ePlan
Routing - PLAN CHECK7/2/2019 7/3/2019 PASS
DetailsBrian McGowan
Routing - PUBLIC WORKS7/2/2019 7/2/2019 PASS
DetailsMorgan Webb
Plan Modification Accepted  7/2/2019 DONE
unknow who started work flow in eplan. changing the front driveway and adding retaining wall-candy did it
BLD-Other3/11/20193/12/20193/12/2019APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Clayton Conner,, soffits,, work in progress,, ok
BLD-Energy code compliance3/8/20193/11/20193/11/2019APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Clayton Conner,, soffits are also work in progress
BLD-Energy code compliance3/7/20193/8/20193/8/2019ANR
DetailsTony Young
Insulation Inspection. Phone #: ###-#### Inspection requested via web by Clayton Conner
BLD-Framing/Rough-in3/7/20193/8/20193/8/2019APASS
DetailsTony Young
Framing - WUI and Soffit Phone #: ###-#### Inspection requested via web by Clayton Conner
BLD-Framing/Rough-in2/5/20192/5/20192/5/2019PPART
DetailsTony Young
Approved plan is in trailer. Please call or text first. Thanks! Phone #: ###-#### Inspection requested via web by Clayton Conner,, needs interior shear in some areas,, needs some areas sealed,, ok to insulate
BLD-Framing/Rough-in2/1/20192/1/20192/1/2019PNR
DetailsTony Young
Caulk and seal and partial framing for cover. Need to finish two walls of shear on the inside and then framing inspection should be set. Please call before hand as approved plans are locked in trailer. Thank you, Clayton Conner Phone #: ###-#### Inspection requested via web by Clayton Conner,, walk through part only
BLD-Energy code compliance2/1/20192/1/20192/1/2019APART
DetailsTony Young
Caulk and seal and partial framing for cover. Need to finish two walls of shear on the inside and then framing inspection should be set. Please call before hand as approved plans are locked in trailer. Thank you, Clayton Conner Phone #: ###-#### Inspection requested via web by Clayton Conner,, foam seal ok after minor fixes,, frame not ready,, partial walk through only
BLD-Wall Bracing11/20/201811/20/201811/20/2018PPART
DetailsTony Young
Mike will be on site. Call if you need me to come out. Thank you, Clayton. Phone #: ###-#### Inspection requested via web by Clayton Conner,, exterior ok,, verify hold downs at frame and interior shear
BLD-Wall Bracing11/19/201811/20/201811/20/2018ANR
DetailsTony Young
Mike will be on site. Call if you need me to come out. Thank you, Clayton. Phone #: ###-#### Inspection requested via web by Clayton Conner
CHANGE STATUS TO (ISS)  10/17/2018 DONE
DetailsChristina Prado
Plan Mod fees paid
OVERRIDE  9/18/2018  
Permit Ready to Issue  9/18/2018 DONE
Plan Mod Approved
DO NOT REISSUE (plan mode fees due)
Plan assigned to (BJM)  9/18/2018 DONE
DetailsBrian McGowan
09/10 sfd Plan Mod ePlan
Routing - PLAN CHECK9/4/2018 9/18/2018 PASS
DetailsBrian McGowan
BLD-Foundation9/14/20189/14/20189/14/2018PPASS
DetailsDave Hannah
retaining walls // Alvaro Phone #: ###-####
BLD-Footing9/4/20189/4/20189/5/2018PPART
DetailsBrandon Shaw
Retaining wall
Routing - PLANNING9/4/2018 9/5/2018 PASS
DetailsCeline Acord
Modification removes pool, still complies with setbacks and hillside ordinance. approved per CFH18-00006
Routing - PUBLIC WORKS9/4/2018 9/4/2018 PASS
DetailsRachael Beierle
Plan Modification Accepted  8/30/2018 DONE
No pool, deck is now wood, and other changes..
started new work flow in Eplan
BLD-Footing8/7/20188/8/20188/8/2018APASS
DetailsMike Jordan
Cal Phone #: ###-####. Garage footings.
BLD-Foundation7/13/20187/13/20187/13/2018PPART
DetailsTony Young
Cale Phone #: ###-####,, work in progress,, ok
BLD-Footing5/30/20185/30/20185/30/2018PPART
DetailsTony Young
Pouring today about 2:30 please have Tony call if there are any problems. Phone #: ###-#### Inspection requested via web by Clayton Conner,, work in progress
PubWorks Subgrade Approval5/21/20185/21/20185/21/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Issue PAID IN FULL permit  5/2/2018 DONE
Inspection Record Card- Bld  5/2/2018 DONE
OVERRIDE  4/10/2018  
Plan assigned to (BJM)2/28/20182/28/20184/10/2018 DONE
DetailsBrian McGowan
1st review complete - fail- 3-19 sfd L2 ePlan
Routing - PLAN CHECK4/10/2018 4/10/2018 PASS
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  4/10/2018 DONE
DetailsBrian McGowan
Permit Ready to Issue  4/10/2018 DONE
met
Routing PW Grading-Hillside4/2/2018 4/2/2018 PASS
DetailsMelissa Jannusch


A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
1st review completed  3/19/2018 FAIL
DetailsBrian McGowan
Routing - PLAN CHECK2/28/2018 3/19/2018 FAIL
DetailsBrian McGowan
Routing PW Grading-Hillside3/1/2018 3/7/2018 FAIL
DetailsMelissa Jannusch
Corrections requested see ePlan
Routing - FIRE2/28/20182/28/20183/2/2018 PASS
DetailsScott Arellano
Plans were reviewed for FD access, availability of hydrants and defensible space.
Routing - Erosion and Sediment2/28/2018 3/2/2018 PASS
DetailsAndy J. Long
ESC site map approved. RP to submit project narrative.
Routing - MECHANICAL2/28/2018 3/2/2018 PASS
DetailsTroy James
Routing - PLANNING2/28/2018 3/2/2018 PASS
DetailsCeline Acord
per CFH18-00006
Route to Impact Fee Review2/28/20183/3/20183/1/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Addressing2/28/2018 3/1/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS2/28/2018 3/1/2018 PASS
DetailsRachael Beierle
Intake Approval  2/28/2018 FAIL
Need Erosion & Sediment Control Plans and ESC narrative
Plans ACCEPTED BY PLAN TECH  2/28/2018 DONE
Intake Approval  2/28/2018 PASS
Recd Pcfee & Taken To Pln CK  2/28/2018 DONE
Application received  2/26/2018 DONE
Application submitted via PDS Online on Feb 26 2018 4:34PM