Letter of compliance/Occupancy | | | 8/11/2020 | | DONE |
|
|
|
|
BLD-Final | 1/8/2020 | 1/9/2020 | 1/9/2020 | A | PASS |
Brandon Shaw
|
|
|
Suzanne Phone #: ###-####
|
DOC - Permit Finaled | 1/9/2020 | 1/9/2020 | 1/9/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 11/12/2019 | 11/12/2019 | 11/12/2019 | P | PEND |
Brandon Shaw
|
|
|
Need to finall (2) Ele and Mec permits... Safety glazing required adjacent to door to patio... 30 Temp. C. of O. is OK...
|
BLD-Final | 11/12/2019 | 11/12/2019 | 11/12/2019 | P | NR |
Brandon Shaw
|
|
|
Called/text, no answer or return call.. Plans are under review- see activities 3/06/18
|
BLD-Final | 11/8/2019 | 11/12/2019 | 11/12/2019 | A | DONE |
Brandon Shaw
|
|
|
Per final walk thru...
|
BLD-Aging Inspection | 7/5/2019 | 7/5/2019 | 7/5/2019 | | DEFR |
Brandon Shaw
|
|
|
|
Extend Permit 90/180 days | 7/5/2019 | 7/5/2019 | 7/5/2019 | P | DEFR |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 2/21/2019 | 2/21/2019 | 2/21/2019 | P | PASS |
Jim Storey
|
|
|
Doug Phone #: ###-####
|
BLD-Framing/Rough-in | 2/19/2019 | 2/19/2019 | 2/19/2019 | P | FAIL |
Brandon Shaw
|
|
|
Need Mech. reinspection...
|
BLD-Energy code compliance | 2/13/2019 | 2/13/2019 | 2/13/2019 | P | FAIL |
Jim Storey
|
|
|
Doug Phone #: ###-#### mech reinsp. required/ depth attic need posted thur out attic.
|
BLD-Framing/Rough-in | 2/8/2019 | 2/11/2019 | 2/11/2019 | A | PASS |
Jim Storey
|
|
|
Doug-call if can''t find plans Phone #: ###-#### ok to insulate mech need reinsp.
|
Routing - MECHANICAL | 2/5/2019 | | 2/5/2019 | | PASS |
Troy James
|
|
|
Revised manual j report
|
BLD-Aging Inspection | 1/29/2019 | 1/29/2019 | 1/29/2019 | | PASS |
Jim Storey
|
|
|
|
Plan Modification Accepted | | | 1/22/2019 | | DONE |
|
|
|
New manual j report
|
Routing - MECHANICAL | 1/22/2019 | | 1/22/2019 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
BLD-Framing/Rough-in | 9/17/2018 | 9/17/2018 | 9/17/2018 | P | NR |
Jim Storey
|
|
|
Corey Phone #: ###-####
|
BLD-Wall Bracing | 9/17/2018 | 9/17/2018 | 9/17/2018 | P | PASS |
Jim Storey
|
|
|
Corey Phone #: ###-####
|
BLD-Wall cover | 8/9/2018 | 8/9/2018 | 8/9/2018 | P | FAIL |
Jim Storey
|
|
|
James Phone #: ###-#### sona fts on fill and grass
|
BLD-Footing | 8/8/2018 | 8/8/2018 | 8/8/2018 | P | PASS |
Jim Storey
|
|
|
James Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/1/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/1/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 7/18/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 3/6/2018 | 3/6/2018 | 7/18/2018 | | DEFR |
Rob Patrick
|
|
|
3/19 sfd L1 ePlan....6/27 Emailed Corey and asked why comments aren't being addressed.
|
Plan assigned to (M_H) | 7/18/2018 | | 7/18/2018 | | DONE |
Michael Hanson
|
|
|
03/19 sfd L1 ePlan....6/27 Emailed Corey and asked why comments aren't being addressed.
|
Routing - PLANNING | 7/18/2018 | | 7/18/2018 | | PASS |
Jeff Lowe
|
|
|
shown with correct site plan
|
Routing - PLAN CHECK | 7/18/2018 | | 7/18/2018 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/18/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 7/18/2018 | | DONE |
|
|
|
Need- all met
RP
GC Form (need to know which GC is doing the work)
|
Routing - PLANNING | 6/26/2018 | | 6/26/2018 | | FAIL |
Jeff Lowe
|
|
|
plan does not show dwelling on plan with newly adjusted Lot line.
|
Routing - PLAN CHECK | 6/26/2018 | | 6/26/2018 | | FAIL |
Rob Patrick
|
|
|
Corrections Not completed
|
Routing - PLAN CHECK | 5/16/2018 | | 5/16/2018 | | FAIL |
Rob Patrick
|
|
|
Fail...corrections required.
|
Routing - PLANNING | 5/15/2018 | | 5/15/2018 | | FAIL |
|
|
|
waiting for new ROS to be submitted/approved to move Lot line.
|
1st review completed | | | 3/23/2018 | | FAIL |
Rob Patrick
|
|
|
Re-design may be required for lot line issue
|
Route to Impact Fee Review | 3/6/2018 | 3/9/2018 | 3/7/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PUBLIC WORKS | 3/6/2018 | | 3/7/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - MECHANICAL | 3/6/2018 | | 3/7/2018 | | PASS |
Troy James
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/6/2018 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 3/6/2018 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/6/2018 | | DONE |
Christina Prado
|
|
|
|
Routing - Addressing | 3/6/2018 | | 3/6/2018 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 2/28/2018 | | FAIL |
Christina Prado
|
|
|
Need Manual J
Codes updated, no letter needed
|
Intake Approval | | | 2/27/2018 | | FAIL |
|
|
|
MISSING
letter for rescheck (2012)
Building Cross section
Anchor bolts
Foundation plan stamped and signed
Manual HVAC
|
Application received | | | 2/26/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 26 2018 8:58PM
|
Routing - PLANNING | 3/6/2018 | | | | FAIL |
|
|
|
Hello Corey, the site plan for 2103 Pebblecreek shows the old property line and only a portion of the new line. We will need the accurate new line depicted on the plan to make sure no errors are made in the field.
Also, the driveway cannot be wider than 33-feet in the front setback, which is 20-feet. I think you could move the top of the arc southerly and perhaps get where you need to.
Zoning will need to see a new site plan before we can approve it.
Let me know if you have questions. Thanks, Jeff
|
Routing - PLAN CHECK | 3/6/2018 | | | | FAIL |
Rob Patrick
|
|
|
Re-design may be required for lot line issue
|