Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-00680
StatusFinaled
Name EKC INC
Site Address 360 E MALLARD DR Unit: 100
Project NameHollingshead Eye Center
Customer Number 
ePlanReviewYes
Description
(HOLLINGSHEAD EYE CENTER) **Permit to expand an existing 6,565 sq ft medical office into the adjacent 2,876 sq ft office to create a 9,441 sq ft medical office. This permit is approved contingent upon adhering to the approved plans on file. Work to include: demo existing nonbearing interior walls, new electrical including light fixtures, new walls, new doors and relights, accessibility upgrade to provide 2 fully accessible single-user restrooms, new plumbing, relocating HVAC, and interior finishes in compliance with Ch. 8 of the 2015 IBC. This building is fully Fire Sprinklered for area increase. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 7/19/20207/27/2020 DONE
This permit finaled on the web by Charlene Meadows
First Notice5/12/20205/12/20207/9/2020 DONE
DetailsBrandon Shaw
mailed 7-9-2020
BLD-Final5/11/20205/12/20205/12/2020APASS
DetailsBrandon Shaw
*screened* Please call ahead for access, looking to have both Jim & Brandon at same time - Bill Phone #: ###-####
DOC - Permit Finaled5/12/20205/12/20205/12/2020PPASS
DetailsBrandon Shaw
FIRE-Final Inspection5/11/20205/12/20205/12/2020APASS
DetailsJim Page
Final life fire safety inspection for scope of work is complete, signature card not available at time of inspection.

*screened* Please call ahead for access, looking to have both Jim & Brandon at same time - Bill Phone #: ###-####
BLD-Aging Inspection12/26/201912/26/201912/26/2019 CANC
DetailsBrandon Shaw
BLD-Aging Inspection12/25/201912/25/201912/26/2019 CANC
DetailsBrandon Shaw
BLD-Aging Inspection8/13/20198/13/20198/13/2019 PASS
DetailsBrandon Shaw
BLD-Aging Inspection3/29/20193/29/20194/1/2019 PASS
DetailsJim Storey
BLD-Framing/Rough-in11/15/201811/15/201811/15/2018PPART
DetailsDave Hannah
Call if any questions on location // John Phone #: ###-#### three offices south end ok to cover after elec rough in
BLD-Ceiling Grid Inspection11/15/201811/15/201811/15/2018PNR
DetailsDave Hannah
Call if any questions on location // John Phone #: ###-#### remove screws from top trace of into grid move lights and get elec rough ins
BLD-Final8/13/20188/14/20188/14/2018APART
DetailsJim Storey
Bill-wants Temp C of O Phone #: ###-#### 1st phase ok
FIRE-Final Inspection8/13/20188/13/20188/13/2018PPART
DetailsJim Page
Fire life safety inspection for phase 1 complete.

Bill Phone #: ###-####
BLD-Ceiling Grid Inspection7/18/20187/19/20187/19/2018APASS
DetailsMike Jordan
Bill Phone #: ###-####. Grid ok, pending fire sprinkler rough in inspection.
BLD-Framing/Rough-in6/12/20186/13/20186/13/2018APASS
DetailsJim Storey
Bill Phone #: ###-####
Issue PAID IN FULL permit  3/30/2018 DONE
Print Occupancy Form  3/30/2018 DONE
Plan assigned to (JAR)3/2/20183/2/20183/26/2018 DONE
DetailsJulie Romig
1st Rev Comp - L2 Hollingshead Eye Center
Routing - PLAN CHECK3/2/2018 3/26/2018 PASS
DetailsJulie Romig
1st review completed  3/26/2018 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/26/2018 DONE
Permit Ready to Issue  3/26/2018 DONE
email permit to Paul Haas at paul@ekcconstruction.com

Need
GC Form -met
Revised Cert of Value -met
Routing - Addressing3/2/2018 3/23/2018 PASS
DetailsDoug Chausow
Routing - Design Review3/20/2018 3/20/2018 PASS
DetailsKatelyn Menuge
CZC18-00038
Routing - FIRE3/2/20183/2/20183/8/2018 PASS
DetailsScott Arellano
Attached comments to case
Intake Approval  3/2/2018 PASS
Routing - PUBLIC WORKS3/2/2018 3/2/2018 PASS
DetailsRachael Beierle
Application received  2/27/2018 DONE
Application submitted via PDS Online on Feb 27 2018 11:01AM