Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD18-00682
StatusFinaled
Name TBL CONSTRUCTION
Site Address 2990 E STONE POINT DR
Project NameMalberg remodel
Customer Number 
ePlanReviewNo
Description
**MODIFICATION, RECESSING A SECTION OF FLOOR FOR ZERO-THRESHHOLD SHOWER AND ADDING AN EXTERIOR DOOR **jab** - ENGINEERED SHEAR UPDATED 6-27-18 **jab** WUI - HILLSIDE - MODIFICATION - Permit for a remodel, to include: adding 278sq' to the garage, adding 1,220sq' to the home, & full gut-to-the-studs reconfigure and reroof of the home. Final home is 4Bd/3.5Bth. All work per plans, specs, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB** 6/22/18- Permit for interior demo for discovery. Removing cabinets, fixtures, gyp board, interior walls, etc. Home is in the Hillside. **JAB**
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection4/25/20194/25/20194/25/2019 PASS
DetailsBrandon Shaw
DOC - Permit Finaled4/25/20194/25/20194/25/2019PPASS
DetailsBrandon Shaw
BLD-Conference1/25/20191/25/20191/25/2019PDONE
DetailsBrandon Shaw
Per final walk thru...
BLD-Framing/Rough-in12/12/201812/12/201812/12/2018APASS
DetailsBrandon Shaw
Call tim if any issues.

Please check new south door framing and approve to insulate. Thanks
Tim
Phone #: ###-#### Inspection requested via web by Timothy Beaudoin
BLD-Footing11/28/201811/28/201811/28/2018PPART
DetailsBrandon Shaw
Zero threshold/ADA shower,
OVERRIDE  11/27/2018  
Routing Walk-In (BLD)11/27/201811/27/201811/27/2018PPASS
DetailsJosh Bogle
CHANGE STATUS TO (ISS)  11/27/2018 DONE
Inspection Record Card- Bld  11/27/2018 DONE
Telephone call  11/27/2018 DONE
called TBL ###-#### to let know plan mod is ready-explained on the message I left that fees were not assessed for the valuation change last plan mod so are owed with this plan mod
Permit Ready to Issue  11/27/2018 DONE
plan mod-please do not re issue-fees should have been paid last plan mod but were missed
Plan assigned to (JAB) Josh11/21/201811/21/201811/26/2018 PASS
DetailsJosh Bogle
Routing - PLAN CHECK11/21/2018 11/26/2018 PASS
DetailsJosh Bogle
Case Summary (BLD)  11/26/2018 DONE
DetailsJosh Bogle
Routing Walk-In (BLD)11/21/201811/21/201811/21/2018AFAIL
DetailsMichael Hanson
**PLAN MOD MODIFIYING BEDROOM AND BATHROOM TO ACCOMODATE DISABLED FAMILY MEMBER - ADA** THIS IS A JAB PROJECT ROUTED TO HIM. MDH
Plan Modification Accepted  11/21/2018 DONE
BLD-Framing/Rough-in10/17/201810/17/201810/23/2018PPASS
DetailsBrandon Shaw
Mechanical has passed. And air seal is done

Thank u.

Tim Phone #: ###-#### Inspection requested via web by Timothy Beaudoin
BLD-Energy code compliance10/20/201810/22/201810/22/2018APASS
DetailsJim Sly
Call tim if any problems. Thank you Phone #: ###-#### Inspection requested via web by Timothy Beaudoin
BLD-Framing/Rough-in10/16/201810/16/201810/16/2018PNR
DetailsBrandon Shaw
Need Mech rough-in...
No air/foam seal...
BLD-Wall Bracing8/29/20188/29/20188/29/2018APASS
DetailsBrandon Shaw
OK to cover exterior
BLD-Foundation6/29/20186/29/20186/29/2018PPASS
DetailsBrandon Shaw
As late as possible Phone #: 2086971241 >> Inspection requested via mobile web by Heron lira
CHANGE STATUS TO (ISS)  6/29/2018 DONE
(F) Reprint permit  6/29/2018 DONE
Inspection Record Card- Bld  6/29/2018 DONE
OVERRIDE  6/27/2018  
Plan assigned to (JAB) Josh6/26/20186/26/20186/27/2018 PASS
DetailsJosh Bogle
Plan resubmittals received  6/27/2018 DONE
plan mod accepted,2 sets of A1.1 and calcs stamped and taken to JAB for review
Routing - PLAN CHECK6/27/2018 6/27/2018 PASS
DetailsJosh Bogle
updated shear - one hour Mod fee
Case Summary (BLD)  6/27/2018 DONE
DetailsJosh Bogle
Permit Ready to Issue  6/27/2018 DONE
plan mod so please do not re issue
Telephone call  6/27/2018 DONE
called ###-#### to let know plan mod is ready and how much is owed
BLD-Footing6/25/20186/26/20186/26/2018APASS
DetailsBrandon Shaw
Work in progress
PubWorks Subgrade Approval6/26/20186/26/20186/26/2018 DONE
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
OVERRIDE  6/22/2018  
Routing Walk-In (BLD)6/22/20186/22/20186/22/2018ADONE
DetailsJosh Bogle
Plan assigned to (JAB) Josh6/7/20186/7/20186/22/2018 PASS
DetailsJosh Bogle
plan mod
Case Summary (BLD)  6/22/2018 DONE
DetailsJosh Bogle
Inspection Record Card- Bld  6/22/2018 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  6/22/2018 DONE
DetailsJosh Bogle
Permit Ready to Issue  6/22/2018 DONE
Issue PAID IN FULL permit  6/22/2018 DONE
Routing - PLAN CHECK6/7/2018 6/22/2018 PASS
DetailsJosh Bogle
Routing - Erosion and Sediment6/18/2018 6/19/2018 PASS
DetailsMichael Zawacki
Hillside lot. Waiver Approved.
Routing - PUBLIC WORKS6/15/2018 6/18/2018 PASS
DetailsMorgan Webb
Routing PW Grading-Hillside6/7/2018 6/15/2018 PASS
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Routing Walk-In (BLD)6/7/20186/7/20186/7/2018PPASS
DetailsJosh Bogle
took in as a Level 2 - routed to Hillside & ESC
Routing Walk-In (Zoning)6/7/20186/7/20186/7/2018PPASS
DetailsColleen T Carroll
Plan Modification Accepted  6/7/2018 DONE
remodel and addition to house
Routing Walk-In (BLD)5/16/20185/16/20185/16/2018ADONE
DetailsJosh Bogle
Routing - PLAN CHECK5/16/2018 5/16/2018 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  5/16/2018 DONE
DetailsJosh Bogle
Case Summary (BLD)  5/16/2018 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  5/16/2018 DONE
DetailsJosh Bogle
Permit Ready to Issue  5/16/2018 DONE
Issue PAID IN FULL permit  5/16/2018 DONE
Routing Walk-In (BLD)2/27/20182/27/20182/27/2018AFAIL
DetailsBrian McGowan
1st review completed  2/27/2018 FAIL
DetailsBrian McGowan
Must provide an existing floor plan.
Routing - PLAN CHECK2/27/2018 2/27/2018 FAIL
DetailsBrian McGowan
Need existing floor plan
Application received 2/27/2018