BLD-Final | 1/23/2019 | 1/24/2019 | 1/24/2019 | A | PASS |
Brandon Shaw
|
|
|
Al Phone #: ###-####
|
DOC - Permit Finaled | 1/24/2019 | 1/24/2019 | 1/24/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Energy code compliance | 11/13/2018 | 11/13/2018 | 11/13/2018 | P | PASS |
Jim Sly
|
|
|
Al Phone #: ###-####
|
BLD-Framing/Rough-in | 11/7/2018 | 11/8/2018 | 11/8/2018 | A | PASS |
Dave Hannah
|
|
|
Al Phone #: ###-####
|
BLD-Other | 6/27/2018 | 6/27/2018 | 6/27/2018 | P | PART |
Dave Hannah
|
|
|
floor joist & insulation - Al Phone #: ###-#### part west half floor ok to cover
|
BLD-Footing | 4/3/2018 | 4/4/2018 | 4/4/2018 | A | PASS |
Dave Hannah
|
|
|
Al Baun Phone #: ###-####
|
Routing Walk-In (BLD) | 3/5/2018 | 3/5/2018 | 3/5/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 3/5/2018 | | 3/5/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 3/5/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/5/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/5/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 3/5/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/5/2018 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 2/27/2018 | 2/27/2018 | 2/27/2018 | P | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 2/27/2018 | 2/27/2018 | 2/27/2018 | P | FAIL |
Brian McGowan
|
|
|
need more details and engineering for modifying the ceiling structure
|
1st review completed | | | 2/27/2018 | | FAIL |
Brian McGowan
|
|
|
need more details and engineering for modifying the ceiling structure
|
Routing - PLAN CHECK | 2/27/2018 | | 2/27/2018 | | FAIL |
Brian McGowan
|
|
|
need more details and engineering for modifying the ceiling structure
|
Application received | | 2/27/2018 | | | |
|
|
|
|