BLD-Final | 9/20/2018 | 9/21/2018 | 9/21/2018 | A | PASS |
Tony Young
|
|
|
Charlie Phone #: ###-####
|
DOC - Permit Finaled | 9/21/2018 | 9/21/2018 | 9/21/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 6/20/2018 | 6/21/2018 | 6/21/2018 | A | PART |
Tony Young
|
|
|
Goerge Phone #: ###-####,, see paint
|
BLD-Energy code compliance | 6/20/2018 | 6/21/2018 | 6/21/2018 | A | PASS |
Tony Young
|
|
|
Goerge Phone #: ###-####
|
BLD-Framing/Rough-in | 6/12/2018 | 6/13/2018 | 6/13/2018 | A | PART |
Tony Young
|
|
|
George Phone #: ###-####,, corrections w/ the owner,, ok to insulate
|
Plan Modification Accepted | | | 6/11/2018 | | DONE |
|
|
|
New manual j report
|
Routing - MECHANICAL | 6/11/2018 | | 6/11/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
Issue PAID IN FULL permit | | | 3/27/2018 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 2/28/2018 | 2/28/2018 | 3/26/2018 | | PASS |
Josh Bogle
|
|
|
1st done - needs ES report & window specs - JAB
|
Routing - PLANNING | 3/7/2018 | | 3/26/2018 | | PASS |
Ted Vanegas
|
|
|
|
Routing - PLAN CHECK | 3/26/2018 | | 3/26/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 3/26/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/26/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/26/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 3/26/2018 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Plan Reviewer's activity | | | 3/19/2018 | | DONE |
Josh Bogle
|
|
|
had a lovely chat with George about ES Reports
|
Routing - PLAN CHECK | 3/7/2018 | | 3/7/2018 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 3/7/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - MECHANICAL | 2/28/2018 | | 3/7/2018 | | PASS |
Troy James
|
|
|
|
Routing - FRONT DESK | 2/28/2018 | | 3/5/2018 | | FAIL |
Josh Bogle
|
|
|
need ES report, footings specified, window specs on air leakage
|
Routing - PLANNING | 2/28/2018 | | 3/2/2018 | | FAIL |
Ted Vanegas
|
|
|
Plans show garden wall located in the east side yard setback. The wall needs to be removed or a variance approved.
|
Routing Walk-In (BLD) | 2/28/2018 | 2/28/2018 | 2/28/2018 | A | PASS |
Josh Bogle
|
|
|
took in as level 2 for Mech & Hist review
|
Application received | | 2/28/2018 | | | |
|
|
|
|