BLD-Final | 7/3/2018 | 7/5/2018 | 7/5/2018 | A | PASS |
Jim Sly
|
|
|
Steve Phone #: ###-####
|
DOC - Permit Finaled | 7/5/2018 | 7/5/2018 | 7/5/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 7/2/2018 | 7/3/2018 | 7/3/2018 | P | PART |
Tony Young
|
|
|
Steve Phone #: ###-####,, needs fire seperation house/garage
|
BLD-Energy code compliance | 6/27/2018 | 6/28/2018 | 6/28/2018 | A | PASS |
Jim Sly
|
|
|
Steve Phone #: ###-####
|
BLD-Final | 6/27/2018 | 6/28/2018 | 6/28/2018 | P | CANC |
Jim Sly
|
|
|
Steve Phone #: ###-####
|
BLD-Wall cover | 5/1/2018 | 5/2/2018 | 5/2/2018 | P | PASS |
Jim Sly
|
|
|
I need an insulation inspection so I can cover. Please inspect in the afternoon. Thank you Phone #: ###-#### Inspection requested via web by Steve Harmon
|
BLD-Framing/Rough-in | 4/5/2018 | 4/6/2018 | 4/6/2018 | A | NR |
Jim Sly
|
|
|
Steve Phone #: ###-#### Need all trade rough in inspections.
|
BLD-Conference | 3/9/2018 | 3/12/2018 | 3/12/2018 | A | DONE |
Jim Sly
|
|
|
Steve.....208 781 2758 C/N....Provide Egress window master bath....R-49 attic insulation.
|
BLD-Conference | 3/8/2018 | 3/9/2018 | 3/9/2018 | P | CANC |
Jim Sly
|
|
|
Steve Phone #: ###-####
|
Plan assigned to (JAB) Josh | 2/28/2018 | 2/28/2018 | 3/6/2018 | | PASS |
Josh Bogle
|
|
|
1st done - failed Mechanical
|
Routing - MECHANICAL | 3/6/2018 | | 3/6/2018 | | PASS |
Troy James
|
|
|
Allowing the existing 2.5 ton condenser to remain. The new furnace can handle the existing condenser cfm needed.
|
1st review completed | | | 3/6/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 3/6/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/6/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/6/2018 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy yes
|
Permit Ready to Issue | | | 3/6/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/6/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/2/2018 | | 3/4/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 3/4/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - MECHANICAL | 2/28/2018 | | 3/2/2018 | | FAIL |
Troy James
|
|
|
Emailed corrections to acca designer
|
Routing Walk-In (BLD) | 2/28/2018 | 2/28/2018 | 2/28/2018 | P | PASS |
Josh Bogle
|
|
|
took in as level 2 for Mech review
|
BLD-Framing/Rough-in | 4/30/2018 | 5/1/2018 | | P | |
Jim Sly
|
|
|
There will be a mechanically rough in inspection done in the am. The framing rough in will be ready in the pm. Thank you Phone #: ###-#### >> Inspection requested via web by Steve Harmon
|
Application received | | 2/28/2018 | | | |
|
|
|
|