Print Statement | | | 6/26/2018 | | DONE |
|
|
|
|
First Notice | | 5/25/2018 | 6/11/2018 | | DONE |
|
|
|
mailed 6-12
|
Permanent Occupancy | | | 5/15/2018 | | DONE |
|
|
|
|
BLD-Final | 5/7/2018 | 5/8/2018 | 5/8/2018 | A | PASS |
Mike Jordan
|
|
|
Ryan Phone #: ###-####. OK for perm occ.
|
FIRE-Final Inspection | 5/7/2018 | 5/8/2018 | 5/8/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
Ryan Phone #: ###-####
|
BLD-Final | 5/4/2018 | 5/7/2018 | 5/7/2018 | A | NR |
Mike Jordan
|
|
|
Devin Phone #: ###-####
|
FIRE-Final Inspection | 5/4/2018 | 5/7/2018 | 5/7/2018 | A | FAIL |
Troy Cobbley
|
|
|
Provide panic hardware on both of the exit doors as shown on the city approved plans
Devin Phone #: ###-####
|
BLD-Final | 5/3/2018 | 5/4/2018 | 5/4/2018 | P | NR |
Mike Jordan
|
|
|
Devin Phone #: ###-####. Fire/life/afety failed.
|
FIRE-Final Inspection | 5/3/2018 | 5/4/2018 | 5/4/2018 | P | FAIL |
Troy Cobbley
|
|
|
Provide final for the fire sprinkler permit, repair the fire alarm panel, provide annual inspection for the sprinkler system, repair two exit signs, provide panic hardware at the north exit door as per plans.
Devin Phone #: ###-####
|
BLD-Framing/Rough-in | 4/12/2018 | 4/13/2018 | 4/13/2018 | A | PASS |
Mike Jordan
|
|
|
Devan Phone #: ###-####. All issues resolved.
|
BLD-Framing/Rough-in | 4/11/2018 | 4/11/2018 | 4/11/2018 | P | FAIL |
Mike Jordan
|
|
|
Interior steel stud framed walls and soffits. Needs to remove screws from grid and install kickers to structure.
|
Issue PAID IN FULL permit | | | 3/28/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/28/2018 | | DONE |
|
|
|
|
Telephone call | | | 3/21/2018 | | DONE |
|
|
|
emailed Jeff to let know we still need the 2 forms filled out by the GC (302 & 306)
|
Plan assigned to (JG) | 3/2/2018 | 3/2/2018 | 3/15/2018 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 3/15 L2 Firepoint Solutions ePlan
|
Routing - PLAN CHECK | 3/14/2018 | | 3/15/2018 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/15/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/15/2018 | | DONE |
|
|
|
MET
do not issue without BLD18-00913
NEED
GC
Rev Cert of Val
|
Route to Impact Fee Review | 3/13/2018 | 3/16/2018 | 3/14/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - Addressing | 3/13/2018 | | 3/13/2018 | | PASS |
Doug Chausow
|
|
|
signed off in ePlan by PW Addressing Doug Chausow
|
Routing - PUBLIC WORKS | 3/13/2018 | | 3/13/2018 | | PASS |
Rachael Beierle
|
|
|
|
1st review completed | | | 3/13/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 3/2/2018 | | 3/13/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing - FIRE | 3/2/2018 | 3/2/2018 | 3/8/2018 | | PASS |
Scott Arellano
|
|
|
Attached comments to case
|
Intake Approval | | | 3/2/2018 | | PASS |
|
|
|
|
Application received | | | 2/28/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 28 2018 6:32PM
|