BLD-Framing/Rough-in | 4/26/2018 | 4/26/2018 | 4/26/2018 | P | PASS |
Jim Sly
|
|
|
Jesiah-final passed but frame did not-customer called and would like the permit to be finaled if possible. if you need to go out there please call him Phone #: ###-####
|
DOC - Permit Finaled | 4/26/2018 | 4/26/2018 | 4/26/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 4/24/2018 | 4/24/2018 | 4/24/2018 | P | PASS |
Jim Sly
|
|
|
Jesiah Phone #: ###-####
|
BLD-Energy code compliance | 4/6/2018 | 4/6/2018 | 4/9/2018 | P | PASS |
Jim Sly
|
|
|
Steve at ###-#### or Shane (on site) at ###-####
|
BLD-Wall Bracing | 3/26/2018 | 3/26/2018 | 3/26/2018 | P | PASS |
Brandon Shaw
|
|
|
Jeff Phone #: ###-####
|
BLD-Framing/Rough-in | 3/26/2018 | 3/26/2018 | 3/26/2018 | P | NH |
Brandon Shaw
|
|
|
Need ELE rough in
|
BLD-Foundation | 3/8/2018 | 3/9/2018 | 3/9/2018 | P | PASS |
Jim Sly
|
|
|
Terry Phone #: ###-####
|
BLD-Footing | 3/7/2018 | 3/8/2018 | 3/8/2018 | P | PASS |
Jim Sly
|
|
|
late afternoon- Jesiah Phone #: ###-####
|
OVERRIDE | | | 3/1/2018 | | |
|
|
|
|
Routing Walk-In (Zoning) | 3/1/2018 | 3/1/2018 | 3/1/2018 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 3/1/2018 | 3/1/2018 | 3/1/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 3/1/2018 | | 3/1/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 3/1/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 3/1/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/1/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/1/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 3/1/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/1/2018 | | DONE |
|
|
|
|
Application received | | 3/1/2018 | | | |
|
|
|
|