Second Notice | | 12/24/2018 | 1/8/2019 | | DONE |
|
|
|
mailed 1-11-19
|
First Notice | 12/3/2018 | 12/3/2018 | 12/14/2018 | | DONE |
Jim Storey
|
|
|
mailed 12-17
|
BLD-Final | 12/3/2018 | 12/3/2018 | 12/3/2018 | P | PASS |
Jim Storey
|
|
|
Eric Phone #: ###-#### Existing Use: Tower only - no structure. No impact fees assessed. MKB
|
DOC - Permit Finaled | 12/3/2018 | 12/3/2018 | 12/3/2018 | P | PASS |
Jim Storey
|
|
|
|
Letter of compliance/Occupancy | | | 12/3/2018 | | DONE |
|
|
|
|
BLD-Foundation | 10/23/2018 | 10/24/2018 | 10/24/2018 | P | PASS |
Jim Storey
|
|
|
1 if possible // Matt Phone #: ###-####
|
Issue PAID IN FULL permit | | | 6/25/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 4/19/2018 | | |
|
|
|
|
Routing - PLAN CHECK | 4/19/2018 | | 4/19/2018 | | PASS |
Michael Hanson
|
|
|
|
Routing Off Site - STRUCTURAL | 4/19/2018 | | 4/19/2018 | | PASS |
Michael Hanson
|
|
|
Per Jan Welch - Stapley Engineering
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/19/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 4/19/2018 | | DONE |
|
|
|
Need
GC Form
Revised Cert of Value
Met - RP
|
Plan assigned to (M_H) | 3/20/2018 | | 4/19/2018 | | DONE |
Michael Hanson
|
|
|
04/30 Maverick Tower New 30 days - 1st review completed. See comments from structural engineering review and Boise city design review. MDH
|
Routing - Design Review | 4/17/2018 | | 4/17/2018 | | PASS |
Andrea Tuning
|
|
|
|
Route to Impact Fee Review | 4/3/2018 | 4/6/2018 | 4/4/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 3/20/2018 | | 4/3/2018 | | FAIL |
Michael Hanson
|
|
|
See comments from structural engineering review and Boise city design review. MDH
|
Routing - PLANNING | 3/20/2018 | | 4/3/2018 | | PASS |
Leon Letson
|
|
|
|
Routing Off Site - STRUCTURAL | 3/20/2018 | | 4/3/2018 | | FAIL |
Michael Hanson
|
|
|
|
1st review completed | | | 4/3/2018 | | FAIL |
Michael Hanson
|
|
|
See comments from structural engineering review and Boise city design review. MDH
|
Routing - FIRE | 3/20/2018 | 3/20/2018 | 3/26/2018 | | PASS |
Scott Arellano
|
|
|
No comments attached. FD access shall remain unobstructed. Inspector to field verify
|
Routing PW Drainage | 3/21/2018 | | 3/21/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing - Addressing | 3/20/2018 | | 3/21/2018 | | PASS |
Doug Chausow
|
|
|
Added new address: 3220 E Amity Rd
|
Routing - PUBLIC WORKS | 3/20/2018 | | 3/21/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 3/20/2018 | | 3/20/2018 | | PASS |
Michael Zawacki
|
|
|
Waiver request approved. Site is on paved lot in commercial area. Contact Andy Cockell ###-####
|
Routing - Design Review | 3/20/2018 | | 3/20/2018 | | FAIL |
Andrea Tuning
|
|
|
The proposed landscape plan is not sufficient to screen the wireless cellular facility from public view and soften the appearance of the site. The applicant was required to submit a detailed landscape plan for review and approvl to the Design Review Department prior to subnmitting for building permit. A landscape plan has nto been approved at this time.
Submit a report from a licensed professional engineer describing the tower height, design and materials of the tower. The report shall include: A cross section of the tower; elevations that document the height above grade for all potential mounting positions for co-located antennae; and the minimum separation distances between antennae. The report also must include a description of the tower's capacity regarding the number and type of antennae that it can accommodate and what precautions the applicant will take to avoid interference with established public safety telecommunications.
|
Intake Approval | | | 3/20/2018 | | PASS |
|
|
|
|
Intake Approval | | | 3/15/2018 | | FAIL |
|
|
|
|
Intake Approval | | | 3/4/2018 | | FAIL |
|
|
|
|
Intake Approval | | | 3/2/2018 | | FAIL |
|
|
|
|
Application received | | | 3/1/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 1 2018 1:19PM
|