BLD-Final | 9/20/2018 | 9/20/2018 | 9/20/2018 | P | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
DOC - Permit Finaled | 9/20/2018 | 9/20/2018 | 9/20/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 9/20/2018 | 9/20/2018 | 9/20/2018 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 3.96
|
PubWorks Occupancy Approval | 9/20/2018 | 9/20/2018 | 9/20/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Energy code compliance | 6/13/2018 | 6/14/2018 | 6/14/2018 | A | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
BLD-Other | 6/13/2018 | 6/14/2018 | 6/14/2018 | A | PASS |
Brandon Shaw
|
|
|
Soffits - Les Phone #: ###-####
|
BLD-Framing/Rough-in | 6/8/2018 | 6/8/2018 | 6/8/2018 | P | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
BLD-Wall Bracing | 5/16/2018 | 5/17/2018 | 5/17/2018 | A | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
BLD-Foundation | 4/23/2018 | 4/23/2018 | 4/23/2018 | P | PASS |
Jim Sly
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion
|
BLD-Footing | 4/18/2018 | 4/19/2018 | 4/19/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
Issue PAID IN FULL permit | | | 4/6/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/6/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 3/28/2018 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/28/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 3/28/2018 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 3/26/2018 | | 3/28/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Plan assigned to (RDP) | 3/2/2018 | 3/2/2018 | 3/26/2018 | | DONE |
Rob Patrick
|
|
|
3/15 sfd L1 ePlan....3/19 Failed, needs to update to 2015 IRC
|
Routing - PLAN CHECK | 3/26/2018 | | 3/26/2018 | | PASS |
Rob Patrick
|
|
|
|
1st review completed | | | 3/19/2018 | | FAIL |
Rob Patrick
|
|
|
3/19/18
Please correct all sheets to 2015 IRC requirements and redlines.
|
Routing - PLAN CHECK | 3/2/2018 | | 3/19/2018 | | FAIL |
Rob Patrick
|
|
|
3/19/18
Please correct all sheets to 2015 IRC requirements and redlines.
|
Routing - MECHANICAL | 3/2/2018 | | 3/7/2018 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 3/5/2018 | 3/5/2018 | 3/6/2018 | | PASS |
Scott Arellano
|
|
|
Plans were reviewed for FD access, availability of hydrants and defensible space.
|
Routing - Erosion and Sediment | 3/5/2018 | | 3/6/2018 | | PASS |
Michael Zawacki
|
|
|
Site inspection required.
|
Route to Impact Fee Review | 3/2/2018 | 3/5/2018 | 3/5/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 3/2/2018 | | 3/5/2018 | | PASS |
Jeff Lowe
|
|
|
|
Routing - Addressing | 3/2/2018 | | 3/5/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 3/2/2018 | | 3/5/2018 | | PASS |
Rachael Beierle
|
|
|
|
Application received | | | 3/2/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 2 2018 2:23PM
|
Intake Approval | | | 3/2/2018 | | FAIL |
|
|
|
Under 2009/2012 code
|
Plans ACCEPTED BY PLAN TECH | | | 3/2/2018 | | DONE |
|
|
|
|
Intake Approval | | | 3/2/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/2/2018 | | DONE |
|
|
|
|
PubWorks Subgrade Approval | 4/20/2018 | 4/20/2018 | | | DONE |
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|