BLD-Final | 7/31/2018 | 8/1/2018 | 8/1/2018 | P | PASS |
Tony Young
|
|
|
Ryan Phone #: ###-####
|
DOC - Permit Finaled | 8/1/2018 | 8/1/2018 | 8/1/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 7/24/2018 | 7/31/2018 | 7/31/2018 | P | PEND |
Tony Young
|
|
|
Ryan Phone #: ###-####
|
BLD-Final | 7/24/2018 | 7/24/2018 | 7/24/2018 | P | PART |
Tony Young
|
|
|
Ryan Phone #: ###-####,, ok,, just needs to return hand rails and add a s/c detector
|
BLD-Framing/Rough-in | 4/3/2018 | 4/4/2018 | 4/4/2018 | P | PART |
Tony Young
|
|
|
Ryan Phone #: ###-####,, needs fireplace,, ok to cover unaffected areas
|
BLD-Framing/Rough-in | 3/27/2018 | 3/28/2018 | 3/28/2018 | A | PART |
Tony Young
|
|
|
Ryan Phone #: ###-####,, east wall ok to insulate and cover with plywood per new engineering
|
BLD-Footing | 3/13/2018 | 3/14/2018 | 3/14/2018 | A | PASS |
Brandon Shaw
|
|
|
Ryan Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/9/2018 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 3/5/2018 | 3/5/2018 | 3/7/2018 | | PASS |
Josh Bogle
|
|
|
1st done - waiting for info on Special Inspections
|
Routing - PLAN CHECK | 3/7/2018 | | 3/7/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 3/7/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/7/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/7/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 3/7/2018 | | DONE |
|
|
|
|
Telephone call | | | 3/7/2018 | | DONE |
|
|
|
called Ryan to let know permit was ready and how much is owed-left message on his cell
|
Routing - PLAN CHECK | 3/5/2018 | | 3/6/2018 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 3/6/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (BLD) | 3/5/2018 | 3/5/2018 | 3/5/2018 | P | PASS |
Josh Bogle
|
|
|
took in as a level 2
|
Application received | | 3/5/2018 | | | |
|
|
|
|