BLD-Final | 5/9/2018 | 5/11/2018 | 5/11/2018 | P | PASS |
Dave Hannah
|
|
|
Keith Shauger Phone #: ###-####
|
FIRE-Final Inspection | 5/8/2018 | 5/8/2018 | 5/8/2018 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguisher is in place with a current inspection tag. Final life fire safety inspection for area of work complete.
Keith Phone #: ###-####
|
Plan assigned to (RMH) | 3/16/2018 | 3/16/2018 | 3/22/2018 | | PASS |
Ron Hill
|
|
|
3/20 L1 City Hall Bldg 1 Fl 4 ePlan*
|
1st review completed | | | 3/22/2018 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/22/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/22/2018 | | DONE |
|
|
|
All Requirements Met
|
Issue & PRINT to be Invoiced | | | 3/22/2018 | | DONE |
|
|
|
|
Print Statement | | | 3/22/2018 | | DONE |
Rita DeYoung
|
|
|
|
Inspection Record Card- Bld | | | 3/22/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/14/2018 | | 3/22/2018 | | PASS |
Javier Guzman
|
|
|
|
Routing - FIRE | 3/14/2018 | 3/14/2018 | 3/21/2018 | | PASS |
Scott Arellano
|
|
|
Attached comments to case
|
Plan assigned to (JG) | 3/14/2018 | 3/14/2018 | 3/16/2018 | | DEFR |
Javier Guzman
|
|
|
3/20 L1 City Hall Bldg 1 Fl 4 ePlan*
|
Intake Approval | | | 3/14/2018 | | FAIL |
Rob Patrick
|
|
|
Dwgs need to be on 18x24. Code Data needs to be updated to 2015.
|
Intake Approval | | | 3/14/2018 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 3/9/2018 | | FAIL |
Rob Patrick
|
|
|
3/9/18
The Pre-screen for this permit has Failed for the following reasons:
1. Building Code Data needs to be updated to current 2015 IBC.
2. Drawings need to be submitted on 18"x 24" minimum sheet size with a clear space in the bottom right hand corner for electronic stamp.
3. Key Plan on sheet 1 indicates work being done on 3rd floor but, sheets 2 and 3 say 4th floor.
Please resubmit with appropriate changes.
|
Application received | | | 3/7/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 7 2018 12:44PM
|