Description
(WAXIE ā€“ BUILDING ā€œCā€ ā€“ 2ND SPACE FROM THE SOUTH - STE 120) (DRH17-00215) The fire sprinkler system is used for building area increase and for fire area. To construct improvements within and existing 10,162 square foot shell tenant space. This shell tenant space was constructed under permit BLD17-02817 when the 51,402 square foot building shell was constructed. Work is to include interior nonbearing walls, 2 toilet rooms accessible to the disabled, interior doors and windows, an insulated ceiling above the office area, suspended acoustical ceilings, gypsum board ceilings, and finishes. A steel frame supported by the existing roof joists will be provided to support the new roof top HVAC unit. Special Inspection is required for welding. A separate permit is required for racking over 8 feet tall. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 9/16/201810/11/2018 DONE
mailed 10-12-18
First Notice 8/19/20189/6/2018 DONE
mailed 9-10-18
Permanent Occupancy  8/9/2018 DONE
BLD-Final7/20/20187/23/20187/23/2018PPASS
DetailsJim Storey
Quinnton Phone #: ###-####
BLD-Final7/18/20187/19/20187/19/2018APASS
DetailsJim Storey
Tim Brewer Phone #: ###-#### temp ada/hardware
FIRE-Final Inspection7/17/20187/18/20187/18/2018APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags, knox box is located by the fire pump/riser room. Final life fire safety inspection complete.

Tim Phone #: ###-####
BLD-Ceiling Grid Inspection7/2/20187/3/20187/3/2018PPASS
DetailsBrandon Shaw
Requests 1PM - John Phone #: ###-####
BLD-Framing/Rough-in5/24/20185/25/20185/25/2018APASS
DetailsJim Storey
John Phone #: ###-####
Plan assigned to (CJW)3/9/20183/9/20184/17/2018 PASS
DetailsCarl Westfall
(2nd done) (Mar 29 - 15 days) (Mar 9 PI) (17 sheets) Waxie
Routing - PLAN CHECK4/16/2018 4/17/2018 PASS
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  4/17/2018 DONE
Permit Ready to Issue  4/17/2018 DONE
MET
Need:
GC from
Revised cert of value
Print Occupancy Form  4/17/2018 DONE
Issue PAID IN FULL permit  4/17/2018 DONE
Plan resubmittals received  4/16/2018 DONE
Plan resubmittals received  4/12/2018 DONE
Routing - PLAN CHECK4/12/2018 4/12/2018 FAIL
DetailsCarl Westfall
Revised drawings required
Plan resubmittals requested  4/12/2018 DONE
Route to Impact Fee Review4/5/20184/8/20184/6/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Plan resubmittals requested  4/5/2018 DONE
1st review completed  4/5/2018 DONE
Routing - PLAN CHECK3/9/2018 4/5/2018 FAIL
DetailsCarl Westfall
Revised drawings required
Routing - FIRE3/9/20183/9/20183/16/2018 PASS
DetailsErika Akin
Attached comments to case
Routing - MECHANICAL3/9/2018 3/13/2018 PASS
DetailsTroy James
Routing - PLUMBING3/9/2018 3/12/2018 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - Addressing3/9/2018 3/12/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS3/9/2018 3/12/2018 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment3/9/2018 3/12/2018 PASS
DetailsMichael Zawacki
TI on new construction.
Routing - Design Review3/9/2018 3/12/2018 PASS
DetailsSarah Schafer
Note- The current maximum allowed parking for this site is 39 stalls, as the main use is considered warehouse.
Routing PW Environmental3/12/2018 3/12/2018 PASS
DetailsRick Christenson
Intake Approval  3/9/2018 FAIL
(3-9-18) Please refer to the circled items in the plan intake checklist. Please resolve each item as directed. CJW
Plan Reviewer's activity  3/9/2018 PASS
Plan intake review approved
Intake Approval  3/9/2018 PASS
DetailsAdele J Schaffeld-Griffin
Carl W accepted pre screen
Application received  3/8/2018 DONE
Application submitted via PDS Online on Mar 8 2018 8:37AM