BLD-Final | 10/25/2018 | 10/26/2018 | 10/26/2018 | A | PASS |
Dave Hannah
|
|
|
Steve Phone #: ###-####
|
DOC - Permit Finaled | 10/26/2018 | 10/26/2018 | 10/26/2018 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 8/16/2018 | 8/17/2018 | 8/20/2018 | P | DONE |
Dave Hannah
|
|
|
Call for access // Chad Phone #: ###-####
|
BLD-Energy code compliance | 8/20/2018 | 8/20/2018 | 8/20/2018 | A | PASS |
Dave Hannah
|
|
|
Call for access // Chad Phone #: ###-####
|
BLD-Framing/Rough-in | 8/13/2018 | 8/14/2018 | 8/14/2018 | P | PASS |
Dave Hannah
|
|
|
Steve Phone #: ###-####
|
Plan Modification Accepted | | | 8/7/2018 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 8/7/2018 | | 8/7/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Foundation | 7/6/2018 | 7/6/2018 | 7/6/2018 | P | PASS |
Dave Hannah
|
|
|
Later afternoon - Brice Phone #: ###-####
|
BLD-Footing | 6/28/2018 | 6/29/2018 | 6/29/2018 | A | PASS |
Dave Hannah
|
|
|
Brice Phone #: ###-####
|
PubWorks Subgrade Approval | 6/28/2018 | 6/28/2018 | 6/28/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 6/22/2018 | 6/25/2018 | 6/25/2018 | A | NR |
Mike Jordan
|
|
|
Brice Phone #: ###-####. Needs subgrade inspection from geotech and submit report. No inspection.
|
Routing Walk-In (BLD) | 6/20/2018 | 6/20/2018 | 6/20/2018 | A | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 6/11/2018 | 6/11/2018 | 6/20/2018 | | PASS |
Josh Bogle
|
|
|
plan mod - Hillside
|
Case Summary (BLD) | | | 6/20/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/20/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 6/20/2018 | | DONE |
|
|
|
Need
RP
|
Inspection Record Card- Bld | | | 6/20/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/20/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/11/2018 | | 6/20/2018 | | PASS |
Josh Bogle
|
|
|
|
Routing Walk-In (BLD) | 6/19/2018 | 6/19/2018 | 6/19/2018 | A | FAIL |
Josh Bogle
|
|
|
need structural & WUI details
|
Routing Walk-In (BLD) | 6/18/2018 | 6/18/2018 | 6/18/2018 | P | CANC |
Josh Bogle
|
|
|
|
Routing - PUBLIC WORKS | 6/15/2018 | | 6/18/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 6/18/2018 | | 6/18/2018 | | PASS |
Michael Zawacki
|
|
|
Waiver request approved. Project manager or home owner will need to act as RP.
|
Routing PW Grading-Hillside | 6/11/2018 | | 6/15/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
|
Routing Walk-In (BLD) | 6/11/2018 | 6/11/2018 | 6/11/2018 | P | PASS |
Josh Bogle
|
|
|
took in as a Level 2
|
Routing Walk-In (Zoning) | 6/5/2018 | 6/5/2018 | 6/5/2018 | P | PASS |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 6/5/2018 | 6/5/2018 | 6/5/2018 | P | FAIL |
Josh Bogle
|
|
|
scope of project has changed - needs more info - WUI - Hillside - ESC
|
Plan Modification Accepted | | | 6/5/2018 | | DONE |
|
|
|
routed applicant to extend garage 5 feet and rebuild addition that was never permitted and not built to code.
|
Routing Walk-In (PW Hillside) | | | 6/5/2018 | | |
|
|
|
|
Routing PW Grading-Hillside | 6/5/2018 | | 6/5/2018 | | PASS |
Melissa Jannusch
|
|
|
PLAN MOD for replacing small additions footing and bumping out garage. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
|
BLD-Conference | 3/14/2018 | 3/15/2018 | 3/16/2018 | A | DONE |
Dave Hannah
|
|
|
call before // pre insp for fire damage project // Chad Phone #: ###-####
|
Plan assigned to (JAB) Josh | 3/9/2018 | 3/9/2018 | 3/14/2018 | | PASS |
Josh Bogle
|
|
|
due 3/15 - fire repair
|
Routing - PLAN CHECK | 3/14/2018 | | 3/14/2018 | | PASS |
Josh Bogle
|
|
|
|
Routing - MECHANICAL | 3/9/2018 | | 3/14/2018 | | PASS |
Troy James
|
|
|
|
1st review completed | | | 3/14/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 3/14/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/14/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/14/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 3/14/2018 | | DONE |
|
|
|
|
Telephone call | | | 3/14/2018 | | DONE |
|
|
|
called Chad at Belfor and told him permit is ready and fee due.
|
Issue PAID IN FULL permit | | | 3/14/2018 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 3/14/2018 | | |
Rita DeYoung
|
|
|
reset issued date.
|
Routing Walk-In (BLD) | 3/9/2018 | 3/9/2018 | 3/9/2018 | A | PASS |
Josh Bogle
|
|
|
|
Application received | | 3/9/2018 | | | |
|
|
|
|