Information based on query as of Monday, June 24, 2024.
Permit Information
Permit NumberBLD18-00825
StatusFinaled
Name DAUBY CONSTRUCTION MGMT
Site Address 1111 W JEFFERSON ST
Project NameBoise Plaza
Customer Number 
ePlanReviewYes
Description
(IDAHO HOUSING AND FINANCE) Demolish existing wall and create new corridor to elevator lobby and create two new tenant spaces with new front entry areas. The elevator lobby is rated and any doors thatopen into the lobby are required to commpy as corridor doors and the walls that separate the lobby are required to be an minimum of 1 hour rated walls. This building is fully fire sprinlered ans alarmed for high rise provisions. Any alterations to the sprinkler system shall comply with NFPA 13 and 72 as regulated by the fire department. All work per the approved plans. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  6/18/2018 DONE
pass final 6/14/18
Letter of compliance/Occupancy  6/18/2018 DONE
BLD-Final6/13/20186/14/20186/14/2018PPASS
DetailsTony Young
Eric Phone #: ###-####
FIRE-Final Inspection6/13/20186/14/20186/14/2018APASS
DetailsJim Page
Final life fire safety inspection for area of work complete.

Eric Phone #: ###-####
BLD-Wall cover5/9/20185/9/20185/10/2018PPART
DetailsDave Hannah
Eric Phone #: ###-#### ceiling in north corrador ok to cover
BLD-Wall cover5/4/20185/4/20185/4/2018PPASS
DetailsJim Sly
eric Phone #: ###-####
BLD-Framing/Rough-in4/12/20184/12/20184/13/2018PPASS
DetailsDave Hannah
Eric Phone #: ###-#### basement hallway walls ok to cover
Issue PAID IN FULL permit  4/9/2018 DONE
DetailsChristina Prado
Print Occupancy Form  4/9/2018 DONE
DetailsChristina Prado
Routing - FIRE4/5/20184/5/20184/5/2018 PASS
DetailsErika Akin
Attached comments to case
Plan assigned to (CDM)3/20/20183/20/20184/5/2018 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK3/20/2018 4/5/2018 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  4/5/2018 DONE
Permit Ready to Issue  4/5/2018 DONE
NEED
GC FORM
REVISED VALUE
1st review completed  4/5/2018 FAIL
Routing - FIRE3/20/20183/20/20183/29/2018 FAIL
DetailsScott Arellano
Attached comments to case and emailed architect
Intake Approval  3/20/2018 PASS
Application received  3/9/2018 DONE
Application submitted via PDS Online on Mar 9 2018 10:23AM