BLD-Final | 10/7/2019 | 10/8/2019 | 10/8/2019 | A | PASS |
Jim Storey
|
|
|
call for access- Russ Phone #: ###-####
|
DOC - Permit Finaled | 10/8/2019 | 10/8/2019 | 10/8/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 9/30/2019 | 10/1/2019 | 10/1/2019 | A | NR |
Mike Jordan
|
|
|
Rus- please call before arrival Phone #: ###-####. Needs to install 1/2 rock on garage/dwelling common wall and install 20 min door.
|
BLD-Energy code compliance | 4/18/2019 | 4/19/2019 | 4/19/2019 | A | PASS |
Brandon Shaw
|
|
|
Call ahead // Russ Phone #: ###-####
|
BLD-Framing/Rough-in | 1/30/2019 | 1/31/2019 | 1/31/2019 | A | PASS |
Mike Jordan
|
|
|
call for access- Russ Phone #: ###-####
|
BLD-Other | 1/23/2019 | 1/24/2019 | 1/24/2019 | A | DONE |
Jim Sly
|
|
|
foam seal- call 15 mins ahead for access - Russ Phone #: ###-####
|
Routing - MECHANICAL | 7/3/2018 | | 7/3/2018 | | PASS |
Troy James
|
|
|
manual j report
|
Override - Parcel Holds | | | 3/19/2018 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/19/2018 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 3/9/2018 | 3/9/2018 | 3/9/2018 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 3/9/2018 | | 3/9/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 3/9/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 3/9/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/9/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/9/2018 | | DONE |
Josh Bogle
|
|
|
|
Override - Parcel Holds | | | 3/9/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 3/9/2018 | | DONE |
|
|
|
Need
Signature on application
|
Inspection Record Card- Bld | | | 3/9/2018 | | DONE |
|
|
|
|
Telephone call | | | 3/9/2018 | | DONE |
|
|
|
Left voicemail for Chris to inform him that the permit is ready, what fees are due and that we need him to sign building permit
|
Application received | | 3/9/2018 | | | |
|
|
|
|