Print Statement | | | 8/13/2020 | | DONE |
|
|
|
email to Christina to mail out.
|
Telephone call | | | 7/24/2020 | | DONE |
|
|
|
final values received and saved to doc
|
Print Statement | | | 7/24/2020 | | DONE |
|
|
|
|
Second Notice | | 5/17/2020 | 7/9/2020 | | DONE |
|
|
|
mailed 7-9-2020
|
First Notice | | 5/7/2020 | 5/7/2020 | | DONE |
|
|
|
mailed 5-8-2020
|
Permanent Occupancy | | | 4/27/2020 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | 4/24/2020 | 4/24/2020 | 4/24/2020 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 4/20/2020 | 4/21/2020 | 4/21/2020 | A | PASS |
Jim Storey
|
|
|
screened // Steve Phone #: ###-#### final ok pending sign offs p$z/achd/pw (TCH 4-27-20 inspections signed off)
|
Zoning Approval | 4/21/2020 | 4/21/2020 | 4/21/2020 | | DONE |
KayCee Babb
|
|
|
|
FIRE-Final Inspection | 4/14/2020 | 4/15/2020 | 4/15/2020 | A | PASS |
Jim Page
|
|
|
Previously noted item has been corrected, no fire sprinklers, no fire alarms, fire extinguishers are placed with current inspection tags. Permenant addressing is on site, GC will verify configuration of numbering with tenant (vertical or horizontal) after verification addressing will be installed. Signature provided on permit sign off card.
Screened- Steve Phone #: ###-####
|
BLD-Final | 4/13/2020 | 4/14/2020 | 4/14/2020 | A | NR |
Brandon Shaw
|
|
|
See fire/life...
|
FIRE-Final Inspection | 4/14/2020 | 4/14/2020 | 4/14/2020 | P | FAIL |
Jim Page
|
|
|
Emergency lights on the northeast side of the building did not function when AC power was isolated.
Screened- Steve Phone #: ###-####
|
BLD-Energy code compliance | 2/28/2020 | 3/2/2020 | 3/2/2020 | A | PART |
Jim Storey
|
|
|
Steve Phone #: ###-#### attic cert at final.
|
BLD-Energy code compliance | 2/12/2020 | 2/12/2020 | 2/12/2020 | P | PASS |
Jim Storey
|
|
|
Steve- plan mod on Hvac and Plumbing Phone #: ###-####
|
BLD-Energy code compliance | 2/11/2020 | 2/12/2020 | 2/12/2020 | A | DEFR |
Jim Storey
|
|
|
Steve- plan mod on Hvac and Plumbing Phone #: ###-####
|
BLD-Framing/Rough-in | 2/11/2020 | 2/11/2020 | 2/11/2020 | P | PART |
Jim Storey
|
|
|
Steve- plan mod on Hvac and Plumbing Phone #: ###-#### web braces a3.a4 b3.b3 6 in oc 80% top of trusses
|
OVERRIDE | | | 2/11/2020 | | |
|
|
|
|
Plan assigned to (CJW) | 1/31/2020 | 1/31/2020 | 2/11/2020 | | PASS |
Carl Westfall
|
|
|
plan mod (schroeder office) (routed to staff)
|
CHANGE STATUS TO (ISS) | | | 2/11/2020 | | DONE |
|
|
|
plan mod
|
Permit Ready to Issue | | | 2/11/2020 | | DONE |
|
|
|
plan mod approved- fees due
|
Plan Reviewer's activity | | | 2/11/2020 | | PASS |
|
|
|
2nd plan mod approved
|
Routing - MECHANICAL | 2/5/2020 | | 2/10/2020 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 2/5/2020 | | 2/10/2020 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
BLD-Framing/Rough-in | 2/7/2020 | 2/7/2020 | 2/7/2020 | P | PASS |
Jim Storey
|
|
|
Steve- (plan mod for MECHANICAL) inspection for sealing Phone #: ###-#### air seal ok/ framing ok pending truss engineering/ ok to insulate.
|
BLD-Framing/Rough-in | 2/3/2020 | 2/6/2020 | 2/6/2020 | A | NR |
Jim Storey
|
|
|
Steve Phone #: ###-####
|
Routing - PLAN CHECK | 2/5/2020 | | 2/5/2020 | | PASS |
Carl Westfall
|
|
|
Plan mod intake review and plan mod both approved. Drawings routed.
|
Routing - PLAN CHECK | 2/3/2020 | | 2/4/2020 | | FAIL |
Carl Westfall
|
|
|
Plan mod 2nd plan intake review failed for the same reasons.
|
Routing - PLAN CHECK | 1/31/2020 | | 2/3/2020 | | FAIL |
|
|
|
Failed the plan intake review for the 2nd plan mod. Deleted 6 sheets that were mostly white space and garbled. Called the Architect and asked him to try again. The plan mod was submitted late on a Friday before a weekend.
|
Plan Modification Accepted | | | 1/31/2020 | | DONE |
Carl Westfall
|
|
|
Plan Mod for mechanicals per Trey Hoff
Mod to sheets M0.0 M0.1 M0.2 M1.1 M2.0 P1.1 P2.1 P3.0
|
BLD-Framing/Rough-in | 1/27/2020 | 1/28/2020 | 1/28/2020 | A | NR |
Dave Hannah
|
|
|
Steve Phone #: ###-####
|
BLD-Framing/Rough-in | 1/21/2020 | 1/22/2020 | 1/22/2020 | A | PASS |
Jim Storey
|
|
|
Sheer & Roof Sheathing - Steve Phone #: ###-####
|
BLD-Foundation | 1/6/2020 | 1/7/2020 | 1/7/2020 | A | PASS |
Jim Storey
|
|
|
Dave - waterproofing Phone #: ###-####
|
BLD-Foundation | 12/27/2019 | 12/31/2019 | 12/31/2019 | A | CANC |
Dave Hannah
|
|
|
Steve - rebar Phone #: ###-####
|
BLD-Footing | 12/23/2019 | 12/27/2019 | 12/27/2019 | A | PASS |
Brandon Shaw
|
|
|
Steve Phone #: ###-####
|
BLD-Footing | 12/20/2019 | 12/24/2019 | 12/24/2019 | A | PASS |
Brandon Shaw
|
|
|
rebar- Steve Phone #: ###-####
|
BLD-Foundation | 12/20/2019 | 12/23/2019 | 12/23/2019 | P | CANC |
Dave Hannah
|
|
|
sTEVE - REBAR INSPECTION Phone #: ###-####
|
Telephone call | | | 12/5/2019 | | DONE |
|
|
|
met GC form
|
Telephone call | | | 12/4/2019 | | DONE |
|
|
|
Received email from applicant designating Petra as the GC (see Docs). Informed him there would be a $35 fee and that Petra will have to submit a form 302
|
Meeting | | | 12/3/2019 | | DONE |
|
|
|
GC Petra Inc will be taking over this project, he was inform that a letter from the parcel owner is needed to change the name
|
Issue PAID IN FULL permit | | | 9/13/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/13/2019 | | DONE |
|
|
|
|
Extend Review Timeline | | | 2/22/2019 | | DONE |
|
|
|
Final Approved 180 day extension per Adele. See documents
|
Expiration Notice | 2/12/2019 | 3/6/2019 | 2/12/2019 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 9/20/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 9/20/2018 | | DONE |
|
|
|
Need:
Revised cert of value from GC (after resubmittal where basement was removed from scope)-met 9-13-19 pdf
Verify HCD still GC (GC form from 5-31-18)-done parcel owner is the GC 9-13-19 CAN
Verify same RP - met 9-13-19 CAN
|
Plan assigned to (CJW) | 9/17/2018 | 9/17/2018 | 9/19/2018 | | PASS |
Carl Westfall
|
|
|
Remove entire basement and exterior basement stair access - SCHROEDER OFFICE BUILDING
|
Routing - PLAN CHECK | 9/17/2018 | | 9/19/2018 | | PASS |
Carl Westfall
|
|
|
Basement deleted from the project. HVAC equipment installed in a closet on the 1st story. Drawings approved.
|
Routing - Design Review | 9/19/2018 | | 9/19/2018 | | PASS |
Andrea Tuning
|
|
|
Bike rack has been redlined.
|
Plan Reviewer's activity | | | 9/19/2018 | | PASS |
|
|
|
Completed the resubmittal review (called a plan mod).
|
Route to Impact Fee Review | 9/18/2018 | 9/21/2018 | 9/18/2018 | | PASS |
Eric Bilimoria
|
|
|
|
Plan resubmittals received | | | 9/17/2018 | | DONE |
|
|
|
(Turned in plan mod application, but permit has not been issued) remove entire basement and exterior basement stair access
|
CHANGE STATUS TO (REV) | | | 9/17/2018 | | DONE |
|
|
|
Plan mod app turned in before permit issued so resubmittals
|
Extend Review Timeline | | | 9/5/2018 | | DONE |
|
|
|
1st Approved 180 day extension per Adele. See documents
|
Telephone call | | | 8/28/2018 | | DONE |
|
|
|
sent email to Dennis, voicemail box full, informing permit will expire in 9 days and may send in a request for an extension
|
Expiration Notice | 8/17/2018 | 9/10/2018 | 8/17/2018 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 5/30/2018 | | |
|
|
|
|
Plan assigned to (CJW) | 3/19/2018 | 3/19/2018 | 5/30/2018 | | PASS |
Carl Westfall
|
|
|
* (3rd done) (Apr 20 - 25 days) (Mar 19 PI) (40 sheets) Schroeder Office Building New
|
Routing - Design Review | 5/29/2018 | | 5/30/2018 | | PASS |
Andrea Tuning
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/30/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/30/2018 | | DONE |
|
|
|
ALL MET
NEED
RP-met
GC FORM-met
REVISED VALUE-met
|
Routing - PUBLIC WORKS | 5/29/2018 | | 5/29/2018 | | PASS |
Morgan Webb
|
|
|
Brian needs to move his stamp to the most recent version.
|
Routing PW Drainage | 5/29/2018 | | 5/29/2018 | | PASS |
Brian Murphy
|
|
|
Brian, please move your stamp to the most recent version
|
Routing - PLAN CHECK | 5/26/2018 | | 5/29/2018 | | PASS |
Carl Westfall
|
|
|
|
Plan resubmittals received | | | 5/26/2018 | | DONE |
|
|
|
Received on a Saturday
|
Plan Reviewer's activity | | | 5/17/2018 | | DONE |
|
|
|
Uploaded a document and a revised sheet that was Emailed to me by the Architect
|
Routing PW Drainage | 5/17/2018 | | 5/17/2018 | | PASS |
Brian Murphy
|
|
|
|
Plan resubmittals requested | | | 5/17/2018 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 5/7/2018 | | 5/15/2018 | | PASS |
Carl Westfall
|
|
|
Dave Haugland (AHJ)
|
Routing PW Drainage | 5/7/2018 | | 5/15/2018 | | FAIL |
|
|
|
NEED STRUCTURAL LETTER/ AND SW ROOF CONVEYANCE
|
Routing PW Sewer Design | 5/7/2018 | | 5/9/2018 | | PASS |
DeAnn Brown
|
|
|
Note for Engineer. Existing service is likely only stubbed to property line.
|
Routing - Design Review | 5/7/2018 | | 5/8/2018 | | FAIL |
Andrea Tuning
|
|
|
The bicycle parking spaces shall be conveniently located, a minimum of 6-feet long and 2.5-feet wide, have an overhead clearance of 7-feet, provide a 4-foot wide aisle is required between rows of bicycle parking spaces and installed on a non-permeable surfaces and anchored to the ground.
Please move away from the building.
|
Routing - PLAN CHECK | 5/7/2018 | | 5/8/2018 | | PASS |
Carl Westfall
|
|
|
Pending structural
|
Plan resubmittals received | | | 5/7/2018 | | DONE |
|
|
|
|
Route to Impact Fee Review | 4/30/2018 | 5/3/2018 | 5/1/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan resubmittals requested | | | 4/30/2018 | | DONE |
|
|
|
|
1st review completed | | | 4/30/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/19/2018 | | 4/30/2018 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Routing - FIRE | 3/19/2018 | 3/19/2018 | 4/18/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing Off Site - STRUCTURAL | 3/19/2018 | | 4/2/2018 | | FAIL |
Carl Westfall
|
|
|
Dave Haugland (AHJ)
|
Routing PW Street Lights | 3/19/2018 | | 3/26/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing - MECHANICAL | 3/19/2018 | | 3/26/2018 | | PASS |
Troy James
|
|
|
|
Routing PW Solid Waste | 3/19/2018 | | 3/22/2018 | | PASS |
Evan Carpenter
|
|
|
Approved for shared service with commercial subdivision.
|
Routing PW Sewer Design | 3/19/2018 | | 3/22/2018 | | FAIL |
DeAnn Brown
|
|
|
See redlines on sheet C2, grading and drainage plan, in eplanreview.
|
Routing PW Drainage | 3/19/2018 | | 3/21/2018 | | FAIL |
Brian Murphy
|
|
|
c-33, cross drainage, patio
|
Routing - PLUMBING | 3/19/2018 | | 3/20/2018 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - PLANNING | 3/19/2018 | | 3/20/2018 | | |
Susan Riggs
|
|
|
No review required
|
Routing - Addressing | 3/19/2018 | | 3/19/2018 | | PASS |
Doug Chausow
|
|
|
Suite 110 and Suite 120
|
Routing - PUBLIC WORKS | 3/19/2018 | | 3/19/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 3/19/2018 | | 3/19/2018 | | PASS |
Michael Zawacki
|
|
|
Valid RP needed before ground disturbance begin. Site prep and inspection required.
|
Intake Approval | | | 3/19/2018 | | PASS |
|
|
|
|
Routing - Design Review | 3/19/2018 | | 3/19/2018 | | FAIL |
Andrea Tuning
|
|
|
|
Intake Approval | | | 3/14/2018 | | FAIL |
Julie Romig
|
|
|
- Please confirm that the signature is the owner signature on Form 304 and Form 310 on the owner signature line; it appears to be the architect's signature. Upload revised documents with owner signature.
- Verification of Legal Lot or Parcel form signed by PDS Staff. Contact Todd Tucker at TTucker@cityofboise.org.
- Drainage System Operation & Maintenance Plan
- Revise Sheet A2.1 to include full construction type (Type VB). Also change Code Year from 2012 IBC to 2015 IBC. The City of Boise adopted the 2015 IBC beginning January 1 and project must comply with all currently adopted codes.
- Provide door hardware schedule. This can be generic. Hardware needs to be specified as lever style for accessibility and the locking function of each door needs to be specified (ie passage, office lock, entrance lock, panic hardware, etc).
|
Intake Approval | | | 3/12/2018 | | FAIL |
Julie Romig
|
|
|
Need 502 checklist and all required documents per checklist.
|
Application received | | | 3/9/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 9 2018 4:24PM
|