Letter of compliance/Occupancy | | | 9/18/2018 | | DONE |
|
|
|
|
BLD-Final | 9/6/2018 | 9/6/2018 | 9/6/2018 | P | PASS |
Dave Hannah
|
|
|
Rain Phone #: ###-####
|
DOC - Permit Finaled | 9/6/2018 | 9/6/2018 | 9/6/2018 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 5/30/2018 | 5/31/2018 | 5/31/2018 | A | PASS |
Dave Hannah
|
|
|
Wayne Phone #: ###-####
|
BLD-Framing/Rough-in | 5/24/2018 | 5/29/2018 | 5/29/2018 | A | PASS |
Dave Hannah
|
|
|
Wayne-please call when on way for access Phone #: ###-####
|
OVERRIDE | | | 5/8/2018 | | |
|
|
|
|
BLD-Conference | 5/8/2018 | 5/8/2018 | 5/8/2018 | A | PEND |
Dave Hannah
|
|
|
Per other inspector more then just a covered deck addtions is being done. Looks like a reroof, new beams and cut through to add door contracted notifed he needs to get permits for new work being done outside of this permit
|
Plan Reviewer's activity | | | 5/8/2018 | | DONE |
Josh Bogle
|
|
|
modified scope due to Homeowner choices and building deficiencies discovered
|
Inspection Record Card- Bld | | | 5/8/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 5/8/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 5/8/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/8/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/8/2018 | | DONE |
|
|
|
|
BLD-Footing | 4/18/2018 | 4/19/2018 | 4/24/2018 | P | PASS |
Dave Hannah
|
|
|
Andy Phone #: ###-####
|
PubWorks Subgrade Approval | 4/20/2018 | 4/20/2018 | 4/20/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 4/16/2018 | 4/17/2018 | 4/17/2018 | A | NR |
Dave Hannah
|
|
|
Andy Phone #: ###-#### needs hill side sign off
|
OVERRIDE | | | 3/19/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 3/12/2018 | 3/12/2018 | 3/19/2018 | | PASS |
Josh Bogle
|
|
|
1st - done - need footing engineering & WUI specs
|
Issue PAID IN FULL permit | | | 3/19/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/19/2018 | | 3/19/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 3/19/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/19/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/19/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 3/19/2018 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 3/16/2018 | | DONE |
Josh Bogle
|
|
|
e-mail converstaion about needed resubmittals
|
Routing Walk-In (Zoning) | 3/12/2018 | 3/12/2018 | 3/12/2018 | P | DONE |
Tom R. Laws
|
|
|
|
Routing Walk-In (BLD) | 3/12/2018 | 3/12/2018 | 3/12/2018 | P | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 3/12/2018 | | 3/12/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - Erosion and Sediment | 3/12/2018 | | 3/12/2018 | | PASS |
Michael Zawacki
|
|
|
Syman SWPPP provided. Erosion Map in SWPPP not included with plan sheets.
|
Routing PW Grading-Hillside | 3/12/2018 | | 3/12/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
|
1st review completed | | | 3/12/2018 | | FAIL |
|
|
|
|
Application received | | 3/12/2018 | | | |
|
|
|
|