BLD-Wall Bracing | 6/18/2018 | 6/19/2018 | 6/19/2018 | A | PASS |
Dave Hannah
|
|
|
Michael Phone #: ###-####
|
BLD-Foundation | 5/30/2018 | 5/31/2018 | 5/31/2018 | P | PASS |
Dave Hannah
|
|
|
wall- Dane Phone #: ###-####
|
BLD-Footing | 5/29/2018 | 5/30/2018 | 5/30/2018 | P | PASS |
Brandon Shaw
|
|
|
Set backs OK, garage moved to North side property line.
|
BLD-Footing | 5/25/2018 | 5/29/2018 | 5/29/2018 | P | CANC |
Dave Hannah
|
|
|
Dane Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/21/2018 | | DONE |
|
|
|
|
Telephone call | | | 3/20/2018 | | DONE |
|
|
|
Spoke with Michael informing him that this permit is ready and the fee amout due
|
OVERRIDE | | | 3/19/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 3/16/2018 | 3/16/2018 | 3/19/2018 | | PASS |
Josh Bogle
|
|
|
due 3/20 - garage
|
Routing - PLAN CHECK | 3/16/2018 | | 3/19/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 3/19/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 3/19/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/19/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/19/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 3/19/2018 | | DONE |
|
|
|
MET
NEED
RP
|
Routing Walk-In (BLD) | 3/16/2018 | 3/16/2018 | 3/16/2018 | P | PASS |
Josh Bogle
|
|
|
took in as a level 2
|
Routing Walk-In (Zoning) | 3/13/2018 | 3/13/2018 | 3/13/2018 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 3/13/2018 | 3/13/2018 | 3/13/2018 | A | CANC |
Josh Bogle
|
|
|
no contact with applicant - JAB
|
Application received | | 3/13/2018 | | | |
|
|
|
|