Permit Information
Permit NumberBLD18-00881
StatusIssued
Name ALDAPE-LEMMON JUDY
Site Address 5516 W HILL RD
Project NameLemmon addition
Customer Number 
ePlanReviewNo
Description
WUI - HILLSIDE - Permit for an addition remodel that involves adding 961sq' to and existing pergola and converting that pergola to living space. At completion home will be 2bd/2bth. All work per plans, notes, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection4/9/20204/9/20204/14/2020 PEND
DetailsTony Young
BLD-Aging Inspection4/8/20204/8/20204/14/2020 PEND
DetailsTony Young
BLD-Final11/26/201911/29/201912/4/2019PPEND
DetailsTony Young
Warren Phone #: ###-####
BLD-Final11/25/201911/25/201911/26/2019PPART
DetailsTony Young
Warren Phone #: ###-####,, ok pending hillside if needed
BLD-Aging Inspection3/29/20193/29/20193/29/2019 PEND
DetailsTony Young
BLD-Aging Inspection3/28/20193/28/20193/29/2019 PEND
DetailsTony Young
BLD-Energy code compliance11/14/201811/14/201811/14/2018PPASS
DetailsTony Young
Ron Phone #: ###-####
BLD-Energy code compliance11/1/201811/2/201811/2/2018APART
DetailsTony Young
Ron Phone #: ###-####,, seal pack ok
BLD-Framing/Rough-in11/1/201811/2/201811/2/2018APASS
DetailsTony Young
Ron Phone #: ###-####
BLD-Energy code compliance7/20/20187/23/20187/23/2018APART
DetailsTony Young
Ron Phone #: ###-####,, under wood floor top of existing slab rigid foam ok
BLD-Foundation6/28/20186/28/20186/28/2018PPASS
DetailsJim Sly
Wall // Ron Phone #: ###-####
BLD-Footing6/22/20186/26/20186/26/2018APASS
DetailsTony Young
Ron Phone #: ###-####
PubWorks Subgrade Approval6/26/20186/26/20186/26/2018 DONE
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
BLD-Footing6/21/20186/22/20186/22/2018APART
DetailsTony Young
Ron Phone #: ###-####,, still needing soils approval from public works
BLD-Footing6/21/20186/21/20186/22/2018PPEND
DetailsTony Young
Ron Phone #: ###-####
BLD-Footing6/19/20186/20/20186/21/2018PPEND
DetailsTony Young
Ron Phone #: ###-####,, still needs soils approval
BLD-Footing6/18/20186/19/20186/19/2018APEND
DetailsTony Young
Ron Phone #: ###-####
CHANGE STATUS TO (ISS)  6/19/2018 DONE
Per Tony, finaled by mistake
BLD-Footing6/14/20186/18/20186/18/2018APASS
DetailsTony Young
Ron Phone #: ###-####,, ok now
DOC - Permit Finaled6/18/20186/18/20186/18/2018PPASS
DetailsTony Young
c of o issued
Issue PAID IN FULL permit  4/18/2018 DONE
OVERRIDE  4/17/2018  
Plan assigned to (JAB) Josh3/14/20183/14/20184/17/2018 PASS
DetailsJosh Bogle
1st done - Hillside needs info, see my email 3/28 - JAB
Routing PW Grading-Hillside4/9/2018 4/17/2018 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Routing - PUBLIC WORKS4/9/2018 4/17/2018 PASS
DetailsMorgan Webb
Routing - PLAN CHECK4/17/2018 4/17/2018 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  4/17/2018 DONE
DetailsJosh Bogle
Case Summary (BLD)  4/17/2018 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  4/17/2018 DONE
DetailsJosh Bogle
Permit Ready to Issue  4/17/2018 DONE
met
NEED
RP
Telephone call  4/17/2018 DONE
Spoke with Rick informing him this permit is ready and the fee amount due. Ask who the rp will be and he stated the home owner
Plan resubmittals received  4/6/2018 DONE
received engineers response letter, two copies of Stormwater Calcs and geotech report, three copies of plan sheets C1.0, C2.0, C3.0, C3.1, C4.0, ESC1.0; taken to Josh Bogle
Routing Walk-In (BLD)3/28/20183/28/20183/28/2018PPASS
DetailsJosh Bogle
applicant added notes to plans for clarification - JAB
1st review completed  3/28/2018 FAIL
DetailsJosh Bogle
Routing - PLAN CHECK3/14/2018 3/28/2018 FAIL
DetailsJosh Bogle
Routing - FIRE3/14/20183/14/20183/27/2018 PASS
DetailsErika Akin
Plans were reviewed for FD access and defensible space. Applicant received approval from Assistant Fire Marshall for access road.
Routing - MECHANICAL3/14/2018 3/26/2018 PASS
DetailsTroy James
Routing PW Grading-Hillside3/14/2018 3/22/2018 FAIL
DetailsMelissa Jannusch
Corrections requested to applicants Agent/Representative and to the Civil Engineer e-mail dated 3-22-2018
Routing - Erosion and Sediment3/14/2018 3/22/2018 PASS
DetailsMichael Zawacki
Valid RP needed. Site prep inspection required.
Routing - PUBLIC WORKS3/22/2018 3/22/2018 FAIL
DetailsMorgan Webb
SEE HILLSIDE FOR FAIL
Routing Walk-In (Zoning)3/16/20183/16/20183/16/2018PPASS
DetailsAndrea Tuning
Routing Walk-In (BLD)3/16/20183/16/20183/16/2018PPASS
DetailsJosh Bogle
took in updated WUI details
Routing Walk-In (Zoning)3/13/20183/13/20183/13/2018PFAIL
DetailsAndrea Tuning
Needs 3-foot side setback for driveway and two identified parking spaces on the site.
Routing Walk-In (BLD)3/13/20183/13/20183/13/2018PPASS
DetailsJosh Bogle
took in as a level 2 - discussed WUI stuff
Application received 3/13/2018