BLD-Aging Inspection | 4/9/2020 | 4/9/2020 | 4/14/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 4/8/2020 | 4/8/2020 | 4/14/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Final | 11/26/2019 | 11/29/2019 | 12/4/2019 | P | PEND |
Tony Young
|
|
|
Warren Phone #: ###-####
|
BLD-Final | 11/25/2019 | 11/25/2019 | 11/26/2019 | P | PART |
Tony Young
|
|
|
Warren Phone #: ###-####,, ok pending hillside if needed
|
BLD-Aging Inspection | 3/29/2019 | 3/29/2019 | 3/29/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 3/28/2019 | 3/28/2019 | 3/29/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Energy code compliance | 11/14/2018 | 11/14/2018 | 11/14/2018 | P | PASS |
Tony Young
|
|
|
Ron Phone #: ###-####
|
BLD-Energy code compliance | 11/1/2018 | 11/2/2018 | 11/2/2018 | A | PART |
Tony Young
|
|
|
Ron Phone #: ###-####,, seal pack ok
|
BLD-Framing/Rough-in | 11/1/2018 | 11/2/2018 | 11/2/2018 | A | PASS |
Tony Young
|
|
|
Ron Phone #: ###-####
|
BLD-Energy code compliance | 7/20/2018 | 7/23/2018 | 7/23/2018 | A | PART |
Tony Young
|
|
|
Ron Phone #: ###-####,, under wood floor top of existing slab rigid foam ok
|
BLD-Foundation | 6/28/2018 | 6/28/2018 | 6/28/2018 | P | PASS |
Jim Sly
|
|
|
Wall // Ron Phone #: ###-####
|
BLD-Footing | 6/22/2018 | 6/26/2018 | 6/26/2018 | A | PASS |
Tony Young
|
|
|
Ron Phone #: ###-####
|
PubWorks Subgrade Approval | 6/26/2018 | 6/26/2018 | 6/26/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 6/21/2018 | 6/22/2018 | 6/22/2018 | A | PART |
Tony Young
|
|
|
Ron Phone #: ###-####,, still needing soils approval from public works
|
BLD-Footing | 6/21/2018 | 6/21/2018 | 6/22/2018 | P | PEND |
Tony Young
|
|
|
Ron Phone #: ###-####
|
BLD-Footing | 6/19/2018 | 6/20/2018 | 6/21/2018 | P | PEND |
Tony Young
|
|
|
Ron Phone #: ###-####,, still needs soils approval
|
BLD-Footing | 6/18/2018 | 6/19/2018 | 6/19/2018 | A | PEND |
Tony Young
|
|
|
Ron Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 6/19/2018 | | DONE |
|
|
|
Per Tony, finaled by mistake
|
BLD-Footing | 6/14/2018 | 6/18/2018 | 6/18/2018 | A | PASS |
Tony Young
|
|
|
Ron Phone #: ###-####,, ok now
|
DOC - Permit Finaled | 6/18/2018 | 6/18/2018 | 6/18/2018 | P | PASS |
Tony Young
|
|
|
c of o issued
|
Issue PAID IN FULL permit | | | 4/18/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 4/17/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 3/14/2018 | 3/14/2018 | 4/17/2018 | | PASS |
Josh Bogle
|
|
|
1st done - Hillside needs info, see my email 3/28 - JAB
|
Routing PW Grading-Hillside | 4/9/2018 | | 4/17/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
|
Routing - PUBLIC WORKS | 4/9/2018 | | 4/17/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLAN CHECK | 4/17/2018 | | 4/17/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 4/17/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 4/17/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/17/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 4/17/2018 | | DONE |
|
|
|
met
NEED
RP
|
Telephone call | | | 4/17/2018 | | DONE |
|
|
|
Spoke with Rick informing him this permit is ready and the fee amount due. Ask who the rp will be and he stated the home owner
|
Plan resubmittals received | | | 4/6/2018 | | DONE |
|
|
|
received engineers response letter, two copies of Stormwater Calcs and geotech report, three copies of plan sheets C1.0, C2.0, C3.0, C3.1, C4.0, ESC1.0; taken to Josh Bogle
|
Routing Walk-In (BLD) | 3/28/2018 | 3/28/2018 | 3/28/2018 | P | PASS |
Josh Bogle
|
|
|
applicant added notes to plans for clarification - JAB
|
1st review completed | | | 3/28/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 3/14/2018 | | 3/28/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - FIRE | 3/14/2018 | 3/14/2018 | 3/27/2018 | | PASS |
Erika Akin
|
|
|
Plans were reviewed for FD access and defensible space. Applicant received approval from Assistant Fire Marshall for access road.
|
Routing - MECHANICAL | 3/14/2018 | | 3/26/2018 | | PASS |
Troy James
|
|
|
|
Routing PW Grading-Hillside | 3/14/2018 | | 3/22/2018 | | FAIL |
Melissa Jannusch
|
|
|
Corrections requested to applicants Agent/Representative and to the Civil Engineer e-mail dated 3-22-2018
|
Routing - Erosion and Sediment | 3/14/2018 | | 3/22/2018 | | PASS |
Michael Zawacki
|
|
|
Valid RP needed. Site prep inspection required.
|
Routing - PUBLIC WORKS | 3/22/2018 | | 3/22/2018 | | FAIL |
Morgan Webb
|
|
|
SEE HILLSIDE FOR FAIL
|
Routing Walk-In (Zoning) | 3/16/2018 | 3/16/2018 | 3/16/2018 | P | PASS |
Andrea Tuning
|
|
|
|
Routing Walk-In (BLD) | 3/16/2018 | 3/16/2018 | 3/16/2018 | P | PASS |
Josh Bogle
|
|
|
took in updated WUI details
|
Routing Walk-In (Zoning) | 3/13/2018 | 3/13/2018 | 3/13/2018 | P | FAIL |
Andrea Tuning
|
|
|
Needs 3-foot side setback for driveway and two identified parking spaces on the site.
|
Routing Walk-In (BLD) | 3/13/2018 | 3/13/2018 | 3/13/2018 | P | PASS |
Josh Bogle
|
|
|
took in as a level 2 - discussed WUI stuff
|
Application received | | 3/13/2018 | | | |
|
|
|
|