First Notice | 3/11/2019 | 3/11/2019 | 4/8/2019 | | DONE |
Jim Storey
|
|
|
emailed to Paul 4/8/19
|
BLD-Final | 3/8/2019 | 3/11/2019 | 3/11/2019 | A | PASS |
Jim Storey
|
|
|
Kevin Phone #: ###-####
|
DOC - Permit Finaled | 3/11/2019 | 3/11/2019 | 3/11/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 1/16/2019 | 1/16/2019 | 1/16/2019 | P | PASS |
Jim Storey
|
|
|
Please call Kevin Phone #: ###-#### Inspection requested via web by Chris Fuhrman 2nd phase of occ ok for new caffiteria use. exting ok
|
BLD-Final | 1/14/2019 | 1/15/2019 | 1/15/2019 | P | NR |
Jim Storey
|
|
|
Please call Kevin Phone #: ###-#### Inspection requested via web by Chris Fuhrman c/n signage to indcate exits/remove debri and workers/ handrail required at srair.
|
FIRE-Final Inspection | 1/14/2019 | 1/15/2019 | 1/15/2019 | A | PART |
Jim Page
|
|
|
Life fire safety inspection for TCO of cafeteria expansion complete.
Please call Kevin Phone #: ###-#### Inspection requested via web by Chris Fuhrman
|
BLD-Final | 1/11/2019 | 1/14/2019 | 1/14/2019 | P | NR |
Jim Storey
|
|
|
Kevin Phone #: ###-####
|
FIRE-Final Inspection | 1/11/2019 | 1/14/2019 | 1/14/2019 | P | FAIL |
Jim Page
|
|
|
Spoke with fire alarm contractor, in duct detectors on RTU's suppling main open area are not hooked to fire panel, FIR permit for fire alarms needs to be finaled before life fire safety inspection.
Kevin Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 1/11/2019 | 1/11/2019 | 1/11/2019 | P | PASS |
Jim Storey
|
|
|
Kevin Phone #: ###-#### ceilling in kitchen ok exit path being maintaned.
|
BLD-Framing/Rough-in | 1/10/2019 | 1/10/2019 | 1/10/2019 | P | PASS |
Jim Storey
|
|
|
Please call Kevin; Firewall Phone #: ###-#### Inspection requested via web by Chris Fuhrman south 2 hr wall complet ok to cover.
|
BLD-Framing/Rough-in | 1/7/2019 | 1/8/2019 | 1/8/2019 | P | PART |
Jim Storey
|
|
|
Kevin Phone #: ###-#### 3/4 height of core borad installed with ch studs// need stager of core board aprox 15 to 16 ft.
|
Fees Due Hold | 12/22/2018 | | 1/3/2019 | | DONE |
Brittany Hill
|
|
|
|
BLD-Wall Bracing | 12/17/2018 | 12/18/2018 | 12/18/2018 | A | PASS |
Mike Jordan
|
|
|
Kevin-interior wall inspection Phone #: ###-####. Interior steel stud framed walls ok.
|
BLD-Energy code compliance | 12/10/2018 | 12/10/2018 | 12/10/2018 | P | PASS |
Mike Jordan
|
|
|
Kevin Phone #: ###-####. Exterior walls only ok.
|
BLD-Framing/Rough-in | 12/10/2018 | 12/10/2018 | 12/10/2018 | P | PASS |
Mike Jordan
|
|
|
Kevin Phone #: ###-####. Soffit framing around accordian doors ok.
|
BLD-Energy code compliance | 12/7/2018 | 12/10/2018 | 12/10/2018 | A | NR |
Mike Jordan
|
|
|
Kevin Phone #: ###-####. Moved to pm inspection.
|
CHANGE STATUS TO (ISS) | | | 11/23/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/23/2018 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 10/15/2018 | 10/15/2018 | 11/21/2018 | | PASS |
Carl D Madsen
|
|
|
Add exterior canopy over outdoor seating area at southwest corner of building expansion. Steel structure will connect to new exterior wall construction, previously reviewed and approved.
|
Routing - PLAN CHECK | 11/14/2018 | | 11/21/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 11/14/2018 | | 11/21/2018 | | PASS |
Carl D Madsen
|
|
|
|
Permit Ready to Issue | | | 11/21/2018 | | DONE |
|
|
|
plan mod-do not re issue-need plan mod rev cert of val to assess new fees
|
BLD-Framing/Rough-in | 11/15/2018 | 11/15/2018 | 11/15/2018 | P | PASS |
Jim Storey
|
|
|
Kevin Phone #: ###-#### exterior walls north stair need 2hr assembly
|
Routing - PLAN CHECK | 11/8/2018 | | 11/8/2018 | | FAIL |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 11/8/2018 | | 11/8/2018 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - FIRE | 11/6/2018 | 11/6/2018 | 11/7/2018 | | PASS |
Erika Akin
|
|
|
Exterior Canopy over exisitng patio seating. No effect on previous approval.
|
Routing - Design Review | 10/30/2018 | | 10/30/2018 | | PASS |
Josh Wilson
|
|
|
Ok per DRH18-00449 for addition of exterior canopy
|
Routing PW Drainage | 10/23/2018 | | 10/24/2018 | | PASS |
Brian Murphy
|
|
|
|
Plan Modification Accepted | | | 10/15/2018 | | DONE |
|
|
|
Plan Mod - Add exterior canopy over outdoor seating area at southwest corner of building expansion. Steel structure will connect to new exterior wall construction, previously reviewed and approved.
|
BLD-Foundation | 8/31/2018 | 9/4/2018 | 9/4/2018 | A | PASS |
Jim Storey
|
|
|
Kevin Phone #: ###-#### walls ok / south ft/ ok with foam wrap around duct bank per engineer.
|
BLD-Foundation | 8/23/2018 | 8/28/2018 | 8/28/2018 | A | PART |
Jim Storey
|
|
|
rebar- Kevin Phone #: ###-#### south ft si to insp. corect bar to grade clearances
|
BLD-Foundation | 8/1/2018 | 8/1/2018 | 8/1/2018 | P | PASS |
Jim Storey
|
|
|
Kevin Phone #: ###-#### rebar ok pending si report
|
BLD-Footing | 7/25/2018 | 7/26/2018 | 7/26/2018 | P | PASS |
Jim Storey
|
|
|
Kevin Phone #: ###-####
|
BLD-Foundation | 7/18/2018 | 7/18/2018 | 7/18/2018 | P | PASS |
Jim Storey
|
|
|
Kevin Phone #: ###-#### center sec wall rebar ok
|
Fees Due Hold | 7/13/2018 | | 7/18/2018 | | DONE |
Christina Prado
|
|
|
|
BLD-Foundation | 7/12/2018 | 7/13/2018 | 7/13/2018 | A | PASS |
Jim Storey
|
|
|
Kevin Phone #: ###-#### north sec
|
BLD-Footing | 7/11/2018 | 7/11/2018 | 7/11/2018 | P | PART |
Jim Storey
|
|
|
Kevin Phone #: ###-#### revise reinforced concrete footing detail above & adjacent to the 24in storm drain line to support & transfer the load from the building column above the pipe insp performed with si pending report
|
Plan assigned to (CDM) | 6/27/2018 | 6/27/2018 | 7/11/2018 | | PASS |
Carl D Madsen
|
|
|
Plan Mod - revise reinforced concrete footing detail above & adjacent to the 24in storm drain line to support & transfer the load from the building column above the pipe
|
Routing - PLAN CHECK | 7/11/2018 | | 7/11/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 7/11/2018 | | 7/11/2018 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/11/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/11/2018 | | DONE |
|
|
|
Plan Mod Approved
DO NOT REISSUE
|
CHANGE STATUS TO (ISS) | | | 7/11/2018 | | DONE |
|
|
|
Plan Mod fees to be paid my Micron
|
Inspection Record Card- Bld | | | 7/11/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/4/2018 | | 7/4/2018 | | FAIL |
Carl D Madsen
|
|
|
Failed pending structural resubmittals
|
Routing Off Site - STRUCTURAL | 7/4/2018 | | 7/4/2018 | | FAIL |
Carl D Madsen
|
|
|
|
BLD-Foundation | 6/29/2018 | 7/2/2018 | 7/2/2018 | A | PART |
Dave Hannah
|
|
|
Kevin--late morning preferred, concrete at 12, special inspector on site Phone #: ###-#### 24 inch storm drain is rapped with 4inchs of foam ok to back fill spec inspection will finish rebar inspection.
|
Telephone call | | | 6/28/2018 | | DONE |
|
|
|
customer called watning an inspection-i told him he clouldn't have an inspection for something that they had turned a plan mod in for-I told him he needed to wait until the plan mod was complete so he could have the correct drawings on the job site
|
Plan Modification Accepted | | | 6/27/2018 | | DONE |
|
|
|
Plan Mod - revise reinforced concrete footing detail above & adjacent to the 24in storm drain line to support & transfer the load from the building column above the pipe
|
BLD-Footing | 6/21/2018 | 6/22/2018 | 6/22/2018 | A | FAIL |
Jim Storey
|
|
|
Kevin Phone #: ###-#### col direct on top of large pipe not allowed per plan resubmit to city// north rebar less than 3 inches to grade//flood ft sillt need conpaction re tested or aproved by engineer.
|
Fees Due Hold | 5/17/2018 | | 6/21/2018 | | DONE |
Brittany Hill
|
|
|
|
Fees Due Hold | 5/5/2018 | | 5/16/2018 | | DONE |
Christina Prado
|
|
|
|
Issue & PRINT to be Invoiced | | | 5/4/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/4/2018 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 3/14/2018 | 3/14/2018 | 4/26/2018 | | PASS |
Carl D Madsen
|
|
|
Micron Cafeteria Expansion Structrual/Demo
|
Routing - PLAN CHECK | 4/23/2018 | | 4/26/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 4/23/2018 | | 4/26/2018 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/26/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/26/2018 | | DONE |
|
|
|
NEED
ACHD - met
Rev Cert of Val from ESI (showing trades)
GC form- MET
|
Routing - PLAN CHECK | 4/10/2018 | | 4/17/2018 | | FAIL |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 4/10/2018 | | 4/17/2018 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLUMBING | 4/11/2018 | | 4/12/2018 | | PASS |
Bill VanDegrift
|
|
|
relocating roof drains. project management will coordinate lining existing 24" storm drain piping under the existing building. Inspection of sleeving will be by the engineer and approval by the building official.
|
Route to Impact Fee Review | 4/5/2018 | 4/8/2018 | 4/6/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 3/14/2018 | | 4/5/2018 | | FAIL |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 3/14/2018 | | 4/5/2018 | | FAIL |
Carl D Madsen
|
|
|
|
1st review completed | | | 4/5/2018 | | DONE |
|
|
|
|
Routing - FIRE | 3/14/2018 | 3/14/2018 | 3/21/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - Erosion and Sediment | 3/14/2018 | | 3/20/2018 | | PASS |
Andy J. Long
|
|
|
covered under active permit ESC18-00006
|
Routing - Design Review | 3/14/2018 | | 3/19/2018 | | PASS |
Sarah Schafer
|
|
|
|
Routing - Addressing | 3/14/2018 | | 3/15/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 3/14/2018 | | 3/15/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Drainage | 3/15/2018 | | 3/15/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Environmental | 3/15/2018 | | 3/15/2018 | | PASS |
Rick Christenson
|
|
|
|
Intake Approval | | | 3/14/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Carl M accepted pre screen
|
Application received | | | 3/13/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 13 2018 3:26PM
|