Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-00884
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameB36 Cafeteria Expansion TI
Customer NumberC30616
ePlanReviewYes
Description
(MICRON EXPANSION B36 - DEMO & STRUCTURAL) (PLAN MODIFICATION TO ADD AN EXTERIOR COVERED AREA) **(Project Management- Ron Hill)** Demolition & Structural Package for the 8,900 sq ft cafeteria expansion . The main Cafeteria Expansion Project being Permitted under BLD18-00803. This permit also establishes the required egress system during the construction phase with 1/2 of the 460 occupants allowed to egress through a horizontal exit. All work per the approved plans. This building is fully fire sprinklered. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice3/11/20193/11/20194/8/2019 DONE
DetailsJim Storey
emailed to Paul 4/8/19
BLD-Final3/8/20193/11/20193/11/2019APASS
DetailsJim Storey
Kevin Phone #: ###-####
DOC - Permit Finaled3/11/20193/11/20193/11/2019PPASS
DetailsJim Storey
BLD-Final1/16/20191/16/20191/16/2019PPASS
DetailsJim Storey
Please call Kevin Phone #: ###-#### Inspection requested via web by Chris Fuhrman 2nd phase of occ ok for new caffiteria use. exting ok
BLD-Final1/14/20191/15/20191/15/2019PNR
DetailsJim Storey
Please call Kevin Phone #: ###-#### Inspection requested via web by Chris Fuhrman c/n signage to indcate exits/remove debri and workers/ handrail required at srair.
FIRE-Final Inspection1/14/20191/15/20191/15/2019APART
DetailsJim Page
Life fire safety inspection for TCO of cafeteria expansion complete.

Please call Kevin Phone #: ###-#### Inspection requested via web by Chris Fuhrman
BLD-Final1/11/20191/14/20191/14/2019PNR
DetailsJim Storey
Kevin Phone #: ###-####
FIRE-Final Inspection1/11/20191/14/20191/14/2019PFAIL
DetailsJim Page
Spoke with fire alarm contractor, in duct detectors on RTU's suppling main open area are not hooked to fire panel, FIR permit for fire alarms needs to be finaled before life fire safety inspection.

Kevin Phone #: ###-####
BLD-Ceiling Grid Inspection1/11/20191/11/20191/11/2019PPASS
DetailsJim Storey
Kevin Phone #: ###-#### ceilling in kitchen ok exit path being maintaned.
BLD-Framing/Rough-in1/10/20191/10/20191/10/2019PPASS
DetailsJim Storey
Please call Kevin; Firewall Phone #: ###-#### Inspection requested via web by Chris Fuhrman south 2 hr wall complet ok to cover.
BLD-Framing/Rough-in1/7/20191/8/20191/8/2019PPART
DetailsJim Storey
Kevin Phone #: ###-#### 3/4 height of core borad installed with ch studs// need stager of core board aprox 15 to 16 ft.
Fees Due Hold12/22/2018 1/3/2019 DONE
DetailsBrittany Hill
BLD-Wall Bracing12/17/201812/18/201812/18/2018APASS
DetailsMike Jordan
Kevin-interior wall inspection Phone #: ###-####. Interior steel stud framed walls ok.
BLD-Energy code compliance12/10/201812/10/201812/10/2018PPASS
DetailsMike Jordan
Kevin Phone #: ###-####. Exterior walls only ok.
BLD-Framing/Rough-in12/10/201812/10/201812/10/2018PPASS
DetailsMike Jordan
Kevin Phone #: ###-####. Soffit framing around accordian doors ok.
BLD-Energy code compliance12/7/201812/10/201812/10/2018ANR
DetailsMike Jordan
Kevin Phone #: ###-####. Moved to pm inspection.
CHANGE STATUS TO (ISS)  11/23/2018 DONE
Inspection Record Card- Bld  11/23/2018 DONE
Plan assigned to (CDM)10/15/201810/15/201811/21/2018 PASS
DetailsCarl D Madsen
Add exterior canopy over outdoor seating area at southwest corner of building expansion. Steel structure will connect to new exterior wall construction, previously reviewed and approved.
Routing - PLAN CHECK11/14/2018 11/21/2018 PASS
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL11/14/2018 11/21/2018 PASS
DetailsCarl D Madsen
Permit Ready to Issue  11/21/2018 DONE
plan mod-do not re issue-need plan mod rev cert of val to assess new fees
BLD-Framing/Rough-in11/15/201811/15/201811/15/2018PPASS
DetailsJim Storey
Kevin Phone #: ###-#### exterior walls north stair need 2hr assembly
Routing - PLAN CHECK11/8/2018 11/8/2018 FAIL
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL11/8/2018 11/8/2018 FAIL
DetailsCarl D Madsen
Routing - FIRE11/6/201811/6/201811/7/2018 PASS
DetailsErika Akin
Exterior Canopy over exisitng patio seating. No effect on previous approval.
Routing - Design Review10/30/2018 10/30/2018 PASS
DetailsJosh Wilson
Ok per DRH18-00449 for addition of exterior canopy
Routing PW Drainage10/23/2018 10/24/2018 PASS
DetailsBrian Murphy
Plan Modification Accepted  10/15/2018 DONE
Plan Mod - Add exterior canopy over outdoor seating area at southwest corner of building expansion. Steel structure will connect to new exterior wall construction, previously reviewed and approved.
BLD-Foundation8/31/20189/4/20189/4/2018APASS
DetailsJim Storey
Kevin Phone #: ###-#### walls ok / south ft/ ok with foam wrap around duct bank per engineer.
BLD-Foundation8/23/20188/28/20188/28/2018APART
DetailsJim Storey
rebar- Kevin Phone #: ###-#### south ft si to insp. corect bar to grade clearances
BLD-Foundation8/1/20188/1/20188/1/2018PPASS
DetailsJim Storey
Kevin Phone #: ###-#### rebar ok pending si report
BLD-Footing7/25/20187/26/20187/26/2018PPASS
DetailsJim Storey
Kevin Phone #: ###-####
BLD-Foundation7/18/20187/18/20187/18/2018PPASS
DetailsJim Storey
Kevin Phone #: ###-#### center sec wall rebar ok
Fees Due Hold7/13/2018 7/18/2018 DONE
DetailsChristina Prado
BLD-Foundation7/12/20187/13/20187/13/2018APASS
DetailsJim Storey
Kevin Phone #: ###-#### north sec
BLD-Footing7/11/20187/11/20187/11/2018PPART
DetailsJim Storey
Kevin Phone #: ###-#### revise reinforced concrete footing detail above & adjacent to the 24in storm drain line to support & transfer the load from the building column above the pipe insp performed with si pending report
Plan assigned to (CDM)6/27/20186/27/20187/11/2018 PASS
DetailsCarl D Madsen
Plan Mod - revise reinforced concrete footing detail above & adjacent to the 24in storm drain line to support & transfer the load from the building column above the pipe
Routing - PLAN CHECK7/11/2018 7/11/2018 PASS
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL7/11/2018 7/11/2018 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  7/11/2018 DONE
Permit Ready to Issue  7/11/2018 DONE
Plan Mod Approved
DO NOT REISSUE
CHANGE STATUS TO (ISS)  7/11/2018 DONE
Plan Mod fees to be paid my Micron
Inspection Record Card- Bld  7/11/2018 DONE
Routing - PLAN CHECK7/4/2018 7/4/2018 FAIL
DetailsCarl D Madsen
Failed pending structural resubmittals
Routing Off Site - STRUCTURAL7/4/2018 7/4/2018 FAIL
DetailsCarl D Madsen
BLD-Foundation6/29/20187/2/20187/2/2018APART
DetailsDave Hannah
Kevin--late morning preferred, concrete at 12, special inspector on site Phone #: ###-#### 24 inch storm drain is rapped with 4inchs of foam ok to back fill spec inspection will finish rebar inspection.
Telephone call  6/28/2018 DONE
customer called watning an inspection-i told him he clouldn't have an inspection for something that they had turned a plan mod in for-I told him he needed to wait until the plan mod was complete so he could have the correct drawings on the job site
Plan Modification Accepted  6/27/2018 DONE
Plan Mod - revise reinforced concrete footing detail above & adjacent to the 24in storm drain line to support & transfer the load from the building column above the pipe
BLD-Footing6/21/20186/22/20186/22/2018AFAIL
DetailsJim Storey
Kevin Phone #: ###-#### col direct on top of large pipe not allowed per plan resubmit to city// north rebar less than 3 inches to grade//flood ft sillt need conpaction re tested or aproved by engineer.
Fees Due Hold5/17/2018 6/21/2018 DONE
DetailsBrittany Hill
Fees Due Hold5/5/2018 5/16/2018 DONE
DetailsChristina Prado
Issue & PRINT to be Invoiced  5/4/2018 DONE
Inspection Record Card- Bld  5/4/2018 DONE
Plan assigned to (CDM)3/14/20183/14/20184/26/2018 PASS
DetailsCarl D Madsen
Micron Cafeteria Expansion Structrual/Demo
Routing - PLAN CHECK4/23/2018 4/26/2018 PASS
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL4/23/2018 4/26/2018 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  4/26/2018 DONE
Permit Ready to Issue  4/26/2018 DONE
NEED
ACHD - met
Rev Cert of Val from ESI (showing trades)

GC form- MET
Routing - PLAN CHECK4/10/2018 4/17/2018 FAIL
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL4/10/2018 4/17/2018 FAIL
DetailsCarl D Madsen
Routing - PLUMBING4/11/2018 4/12/2018 PASS
DetailsBill VanDegrift
relocating roof drains. project management will coordinate lining existing 24" storm drain piping under the existing building. Inspection of sleeving will be by the engineer and approval by the building official.
Route to Impact Fee Review4/5/20184/8/20184/6/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLAN CHECK3/14/2018 4/5/2018 FAIL
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL3/14/2018 4/5/2018 FAIL
DetailsCarl D Madsen
1st review completed  4/5/2018 DONE
Routing - FIRE3/14/20183/14/20183/21/2018 PASS
DetailsErika Akin
Attached comments to case
Routing - Erosion and Sediment3/14/2018 3/20/2018 PASS
DetailsAndy J. Long
covered under active permit ESC18-00006
Routing - Design Review3/14/2018 3/19/2018 PASS
DetailsSarah Schafer
Routing - Addressing3/14/2018 3/15/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS3/14/2018 3/15/2018 PASS
DetailsRachael Beierle
Routing PW Drainage3/15/2018 3/15/2018 PASS
DetailsBrian Murphy
Routing PW Environmental3/15/2018 3/15/2018 PASS
DetailsRick Christenson
Intake Approval  3/14/2018 PASS
DetailsAdele J Schaffeld-Griffin
Carl M accepted pre screen
Application received  3/13/2018 DONE
Application submitted via PDS Online on Mar 13 2018 3:26PM