BLD-Final | 2/6/2019 | 2/7/2019 | 2/7/2019 | A | PASS |
Brandon Shaw
|
|
|
|
DOC - Permit Finaled | 2/7/2019 | 2/7/2019 | 2/7/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Aging Inspection | 2/6/2019 | 2/6/2019 | 2/6/2019 | | CANC |
Brandon Shaw
|
|
|
|
BLD-Final | 1/22/2019 | 1/23/2019 | 1/23/2019 | A | NR |
Brandon Shaw
|
|
|
Need PW approval
|
PubWorks Occupancy Approval | 1/23/2019 | 1/23/2019 | 1/23/2019 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Framing/Rough-in | 11/16/2018 | 11/16/2018 | 11/16/2018 | P | CANC |
Jim Sly
|
|
|
|
BLD-Footing | 11/8/2018 | 11/8/2018 | 11/8/2018 | P | NR |
Brandon Shaw
|
|
|
Need soil sub-grade submitted and approved by PW...
|
BLD-Other | 10/15/2018 | 10/16/2018 | 10/16/2018 | P | PASS |
Brandon Shaw
|
|
|
Back porch soffit and drywall only.
|
BLD-Energy code compliance | 9/24/2018 | 9/24/2018 | 9/24/2018 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Robert Bruno
|
BLD-Framing/Rough-in | 9/18/2018 | 9/19/2018 | 9/19/2018 | A | PASS |
Brandon Shaw
|
|
|
OK to insulate
|
Plan Modification Accepted | | | 8/31/2018 | | DONE |
|
|
|
New manual j report
|
Routing - MECHANICAL | 8/31/2018 | | 8/31/2018 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
BLD-Wall Bracing | 8/15/2018 | 8/16/2018 | 8/16/2018 | A | PASS |
Brandon Shaw
|
|
|
shear // Stevey Phone #: ###-####
|
BLD-Other | 7/12/2018 | 7/13/2018 | 7/16/2018 | P | PART |
Dave Hannah
|
|
|
Under floor inspection - Stevie Phone #: ###-####
|
BLD-Foundation | 6/27/2018 | 6/27/2018 | 6/27/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 6/20/2018 | 6/20/2018 | 6/20/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
PubWorks Subgrade Approval | 6/20/2018 | 6/20/2018 | 6/20/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Foundation | 6/1/2018 | 6/1/2018 | 6/1/2018 | P | PART |
Brandon Shaw
|
|
|
Work in progress
Basement walls
|
BLD-Footing | 5/24/2018 | 5/24/2018 | 5/24/2018 | P | PART |
Brandon Shaw
|
|
|
Set backs taken from Lots 1/2 property line only, pour at own risk. Basement footing
|
PubWorks Subgrade Approval | 5/11/2018 | 5/11/2018 | 5/11/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 5/1/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/1/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 4/30/2018 | | |
|
|
|
|
Plan assigned to (M_H) | 3/29/2018 | | 4/30/2018 | | DONE |
Michael Hanson
|
|
|
04/17 sfd L2 ePlan. 1st review completed. Planning and WUI Zone A deficiencies. MDH
|
Routing - PLAN CHECK | 4/17/2018 | | 4/30/2018 | | PASS |
Michael Hanson
|
|
|
|
Routing - PLANNING | 4/30/2018 | | 4/30/2018 | | PASS |
Todd Tucker
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/30/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 4/30/2018 | | DONE |
|
|
|
|
Route to Impact Fee Review | 4/16/2018 | 4/19/2018 | 4/17/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLAN CHECK | 3/29/2018 | | 4/17/2018 | | FAIL |
Michael Hanson
|
|
|
Planning and WUI Zone A deficiencies. MDH
|
Routing - PLANNING | 3/29/2018 | | 4/17/2018 | | FAIL |
Todd Tucker
|
|
|
|
Plan Reviewer's activity | | | 4/17/2018 | | DONE |
Michael Hanson
|
|
|
|
1st review completed | | | 4/17/2018 | | FAIL |
Michael Hanson
|
|
|
Planning and WUI Zone A deficiencies. MDH
|
Routing - FIRE | 3/29/2018 | 3/29/2018 | 4/11/2018 | | PASS |
Erika Akin
|
|
|
Plans were reviewed for FD access, availability of hydrants and defensible space.
|
Routing PW Grading-Hillside | 3/29/2018 | | 4/5/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system (downspouts and swales) must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Route to Impact Fee Review | 3/29/2018 | 4/1/2018 | 3/30/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Erosion and Sediment | 3/29/2018 | | 3/29/2018 | | PASS |
Michael Zawacki
|
|
|
Foothills lot, site prep and inspection required.
|
Routing - Addressing | 3/29/2018 | | 3/29/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 3/29/2018 | | 3/29/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - MECHANICAL | 3/29/2018 | | 3/29/2018 | | PASS |
Troy James
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/29/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/29/2018 | | DONE |
|
|
|
|
Intake Approval | | | 3/29/2018 | | PASS |
Tiffany Carson-Herker
|
|
|
|
Application received | | | 3/13/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 13 2018 3:30PM
|