BLD-Final | 5/29/2018 | 5/31/2018 | 6/1/2018 | A | PASS |
Jim Sly
|
|
|
Trent, tech: ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting
|
DOC - Permit Finaled | 6/1/2018 | 6/1/2018 | 6/1/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 5/22/2018 | 5/23/2018 | 5/22/2018 | P | CANC |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by BRS Permitting Inspection cancelled from web by: BRS Permitting
|
CHANGE STATUS TO (ISS) | | | 5/17/2018 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 5/7/2018 | 5/7/2018 | 5/14/2018 | | PASS |
Josh Bogle
|
|
|
plan mod - PV
|
Routing - PLAN CHECK | 5/7/2018 | | 5/14/2018 | | PASS |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 5/14/2018 | | DONE |
|
|
|
Plan Mod Approved
DO NOT REISSUE
|
Routing - PLANNING | 5/7/2018 | | 5/7/2018 | | PASS |
Sue Cummings
|
|
|
|
Plan Modification Accepted | | | 5/7/2018 | | DONE |
|
|
|
plan mod-had to changed the layout of the solar panels due to the roofs layout-assigned to JAB
|
BLD-Final | 4/25/2018 | 4/27/2018 | 4/25/2018 | P | CANC |
Jim Storey
|
|
|
Homeowner may not be there. No locked gates or pets. Phone #: ###-#### >> Inspection requested via web by BRS Permitting Inspection cancelled from web by: BRS Permitting
|
BLD-Framing/Rough-in | 4/19/2018 | 4/20/2018 | 4/20/2018 | A | DEFR |
Jim Storey
|
|
|
Kyle and crew will be there in the morning. Phone #: ###-#### Inspection requested via web by BRS Permitting No work needed to the existing roof structure per engineer’s roof evaluation
|
(F) Reprint permit | | | 3/28/2018 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 3/14/2018 | 3/14/2018 | 3/19/2018 | | PASS |
Josh Bogle
|
|
|
due 3/20 - PV
|
Routing - PLAN CHECK | 3/14/2018 | | 3/19/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 3/19/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/19/2018 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 3/19/2018 | | DONE |
|
|
|
Met
|
Issue PAID IN FULL permit | | | 3/19/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/19/2018 | | DONE |
|
|
|
|
Application received | | | 3/14/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 14 2018 8:45AM
|
Intake Approval | | | 3/14/2018 | | FAIL |
|
|
|
upload plans to the drawings folder and plans must be uploaded as individual sheets.
|
Plans ACCEPTED BY PLAN TECH | | | 3/14/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/14/2018 | | DONE |
|
|
|
|
Intake Approval | | | 3/14/2018 | | PASS |
|
|
|
|
Routing - PLANNING | 3/14/2018 | | 3/14/2018 | | PASS |
Colleen T Carroll
|
|
|
|