BLD-Final | 5/15/2018 | 5/18/2018 | 5/21/2018 | P | PASS |
Jim Sly
|
|
|
Chad Doty, homeowner: 5157108498 Phone #: ###-#### Inspection requested via web by BRS Permitting
|
DOC - Permit Finaled | 5/21/2018 | 5/21/2018 | 5/21/2018 | P | PASS |
Jim Sly
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/23/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/23/2018 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/19/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 4/19/2018 | | DONE |
|
|
|
please do not re issue
|
Plan assigned to (M_H) | 4/10/2018 | | 4/19/2018 | | DONE |
Michael Hanson
|
|
|
plan mod-the interconnection method was changed to load side breaker and swapped the fuse for the AC disconnect
|
Routing - PLAN CHECK | 4/16/2018 | | 4/19/2018 | | PASS |
Michael Hanson
|
|
|
1hr plan mod fee
|
Routing - PLANNING | 4/16/2018 | | 4/16/2018 | | PASS |
Jeff Lowe
|
|
|
|
Plan Modification Accepted | | | 4/10/2018 | | DONE |
|
|
|
plan mod-the interconnection method was changed to load side breaker and swapped the fuse for the AC disconnect
|
Routing - PLAN CHECK | 3/27/2018 | | 3/27/2018 | | PASS |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 3/27/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/27/2018 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 3/19/2018 | | 3/27/2018 | | DONE |
Michael Hanson
|
|
|
03/20 - Solar panels. 1st review completed - Provide documentation that indicates 2015 IRC compliance. MDH
|
Plan assigned to (JAB) Josh | 3/14/2018 | 3/14/2018 | 3/19/2018 | | DEFR |
Josh Bogle
|
|
|
due 3/20 - PV
|
Routing - PLAN CHECK | 3/14/2018 | | 3/19/2018 | | FAIL |
Michael Hanson
|
|
|
Provide documentation that indicates 2015 IRC compliance. MDH
|
Plan Reviewer's activity | | | 3/19/2018 | | DONE |
Michael Hanson
|
|
|
|
1st review completed | | | 3/19/2018 | | FAIL |
Michael Hanson
|
|
|
Provide documentation that indicates 2015 IRC compliance. MDH
|
Application received | | | 3/14/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 14 2018 11:56AM
|
Plans ACCEPTED BY PLAN TECH | | | 3/14/2018 | | DONE |
|
|
|
|
Intake Approval | | | 3/14/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/14/2018 | | DONE |
|
|
|
no fees taken at intake
|
Routing - PLANNING | 3/14/2018 | | 3/14/2018 | | PASS |
Sue Cummings
|
|
|
|