Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD18-00905
StatusFinaled
Name BLUE RAVEN SOLAR LLC
Site Address 325 E OLD SAYBROOK DR
Project NameSaunders solar install array
Customer Number 
ePlanReviewYes
Description
PV electric roof mounted solar array 5.61 kW Permit for 332 sq' of roof-mounted, grid-tied Photo-voltaic panels with optimizers; 19 panels in 1 array. All work per plans, engineering, manufacturer’s specs, & local code. Separate electrical permit required. Panel account for less than 33% of roof area. ***MDH***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/8/20185/9/20185/10/2018PPASS
DetailsJim Storey
Trent, tech: ###-####
Austin, Install Crew Lead: ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting
DOC - Permit Finaled5/10/20185/10/20185/10/2018PPASS
DetailsJim Storey
BLD-Final5/1/20185/2/20185/2/2018PNR
DetailsJim Storey
Austin Teasdale, tech Phone #: ###-#### Inspection requested via web by BRS Permitting ele failled
CHANGE STATUS TO (ISS)  4/10/2018 DONE
Plan assigned to (M_H)4/4/2018 4/9/2018 DONE
DetailsMichael Hanson
Routing - PLAN CHECK4/5/2018 4/9/2018 PASS
DetailsMichael Hanson
1 hr plan modification review
Plan Reviewer's activity  4/9/2018 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  4/9/2018 DONE
DetailsMichael Hanson
Permit Ready to Issue  4/9/2018 DONE
Plan Mod Approved
DO NOT REISSUE
Routing - PLANNING4/5/2018 4/5/2018 PASS
DetailsJeff Lowe
Plan Modification Accepted  4/4/2018 DONE
plan mod started in e plan -assigned to M_H
Routing - PLAN CHECK3/23/2018 3/27/2018 PASS
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  3/27/2018 DONE
DetailsMichael Hanson
Permit Ready to Issue  3/27/2018 DONE
All requirements met
Issue PAID IN FULL permit  3/27/2018 DONE
Plan assigned to (M_H)3/23/2018 3/27/2018 DONE
DetailsMichael Hanson
03/20 Solar panel. 1st review completed - Provide documentation that indicates 2015 IRC compliance. MDH
Plan assigned to (JAB) Josh3/14/20183/14/20183/23/2018 DEFR
DetailsJosh Bogle
due 3/20 - PV
Routing - PLAN CHECK3/14/2018 3/23/2018 FAIL
DetailsMichael Hanson
Provide documentation that indicates 2015 IRC compliance. MDH
Plan Reviewer's activity  3/23/2018 FAIL
DetailsMichael Hanson
Provide documentation that indicates 2015 IRC compliance. MDH
1st review completed  3/23/2018 FAIL
DetailsMichael Hanson
Provide documentation that indicates 2015 IRC compliance. MDH
Application received  3/14/2018 DONE
Application submitted via PDS Online on Mar 14 2018 12:49PM
Plans ACCEPTED BY PLAN TECH  3/14/2018 DONE
Intake Approval  3/14/2018 PASS
Recd Pcfee & Taken To Pln CK  3/14/2018 DONE
no fees taken at intake
Routing - PLANNING3/14/2018 3/14/2018 PASS
DetailsJeff Lowe