BLD-Final | 4/23/2018 | 4/24/2018 | 4/24/2018 | A | DONE |
Mike Jordan
|
|
|
Karrigan Hollins - Phone #: ###-#### Inspection requested via web by BRS Permitting
|
DOC - Permit Finaled | 4/24/2018 | 4/24/2018 | 4/24/2018 | P | PASS |
Mike Jordan
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/10/2018 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 4/6/2018 | 4/6/2018 | 4/9/2018 | | DONE |
Brian McGowan
|
|
|
plan mod-Changed interconnection method to a load side breaker and swapped the fused AC disco for the non-fused AC disco.”
|
Routing - PLAN CHECK | 4/6/2018 | | 4/9/2018 | | PASS |
Brian McGowan
|
|
|
No fee, minimal time.
|
Permit Ready to Issue | | | 4/9/2018 | | DONE |
|
|
|
Plan Mod Approved
DO NOT REISSUE
|
Plan Modification Accepted | | | 4/6/2018 | | DONE |
|
|
|
Plan mod-as per Brittney with Blue Raven-Changed interconnection method to a load side breaker and swapped the fused AC disco for the non-fused AC disco.
|
(F) Reprint permit | | | 3/30/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/29/2018 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 3/14/2018 | 3/14/2018 | 3/27/2018 | | DONE |
Brian McGowan
|
|
|
1st review complete - fail - solar panels
|
Routing - PLAN CHECK | 3/27/2018 | | 3/27/2018 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/27/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 3/27/2018 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 3/14/2018 | | 3/16/2018 | | FAIL |
Brian McGowan
|
|
|
|
1st review completed | | | 3/16/2018 | | FAIL |
Brian McGowan
|
|
|
|
Application received | | | 3/14/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 14 2018 3:28PM
|
Plans ACCEPTED BY PLAN TECH | | | 3/14/2018 | | DONE |
|
|
|
|
Intake Approval | | | 3/14/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/14/2018 | | DONE |
|
|
|
|
Routing - PLANNING | 3/14/2018 | | 3/14/2018 | | PASS |
Colleen T Carroll
|
|
|
|