Permit Information
Permit NumberBLD18-00915
StatusFinaled
Name BLUE RAVEN SOLAR LLC
Site Address 5094 N HERTFORD WAY
Project NameKenneth Klusmire
Customer Number 
ePlanReviewYes
Description
***PLAN MOD - Alter Disconnect diagram - 4-13-18 BJM*** PV electric roof mounted solar array 4.72 kW Permit for 280 sq' of roof-mounted, grid-tied Photo-voltaic panels with optimizers; 16 panels in 2 array. All work per plans, engineering, manufacturer’s specs, & local code. Separate electrical permit required. Panels are less than 33% of the roof square footage. ***BJM***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/24/20184/30/20184/30/2018PPASS
DetailsTony Young
Homeowner will be there. Kenneth. Electrical happening in the AM. Phone #: ###-#### Inspection requested via web by BRS Permitting
DOC - Permit Finaled4/30/20184/30/20184/30/2018PPASS
DetailsTony Young
done
BLD-Final4/19/20184/20/20184/20/2018AFAIL
DetailsTony Young
Permit number ELE18-01184. I cannot locate the permit number on your portal. I cannot schedule the final electrical. I need to schedule the final electrical. I have scheduled the final building for tomorrow 4/20.
Karrigan will be on site to meet with the inspector.
Please contact Garrett if you have any questions ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting/// called and talked with Karrington yesterday,, told him how to schedule the final electrical.. not done yet
CHANGE STATUS TO (ISS)  4/16/2018 DONE
DetailsTiffany Carson-Herker
Inspection Record Card- Bld  4/16/2018 DONE
Plan assigned to (BJM)4/10/20184/10/20184/13/2018 DONE
DetailsBrian McGowan
Routing - PLAN CHECK4/10/2018 4/13/2018 PASS
DetailsBrian McGowan
(1) hour Plan Review
Permit Ready to Issue  4/13/2018 DONE
Plan Mod Approved
DO NOT REISSUE
Plan Modification Accepted  4/10/2018 DONE
plan mod to change from a meter can tap to a sub panel breaker
Issue PAID IN FULL permit  3/28/2018 DONE
Plan assigned to (BJM)3/14/20183/14/20183/27/2018 DONE
DetailsBrian McGowan
1st review complete-fail- solar panels
Routing - PLAN CHECK3/27/2018 3/27/2018 PASS
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  3/27/2018 DONE
DetailsBrian McGowan
Permit Ready to Issue  3/27/2018 DONE
met
Routing - PLAN CHECK3/14/2018 3/16/2018 FAIL
DetailsBrian McGowan
1st review completed  3/16/2018 FAIL
DetailsBrian McGowan
Application received  3/14/2018 DONE
Application submitted via PDS Online on Mar 14 2018 3:43PM
Plans ACCEPTED BY PLAN TECH  3/14/2018 DONE
Intake Approval  3/14/2018 PASS
Recd Pcfee & Taken To Pln CK  3/14/2018 DONE
Routing - PLANNING3/14/2018 3/14/2018 PASS
DetailsJeff Lowe