BLD-Energy code compliance | 5/2/2019 | 5/3/2019 | 5/3/2019 | P | PASS |
Brandon Shaw
|
|
|
Scott Phone #: ###-####
|
BLD-Framing/Rough-in | 4/30/2019 | 4/30/2019 | 4/30/2019 | P | PASS |
Tony Young
|
|
|
Scott Phone #: ###-####,, ok to insulate
|
BLD-Aging Inspection | 4/19/2019 | 4/19/2019 | 4/22/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 4/18/2019 | 4/18/2019 | 4/22/2019 | | PEND |
Tony Young
|
|
|
|
Routing - MECHANICAL | 4/9/2019 | | 4/9/2019 | | PASS |
Troy James
|
|
|
Manual j report
|
BLD-Framing/Rough-in | 12/4/2018 | 12/5/2018 | 12/5/2018 | P | PART |
Brandon Shaw
|
|
|
Exterior sheating...
OK to cover/wrap and install windows
|
BLD-Framing/Rough-in | 11/13/2018 | 11/14/2018 | 11/14/2018 | A | PART |
Tony Young
|
|
|
Scott-hold downs Phone #: ###-####,, hold down locations,, ok
|
BLD-Framing/Rough-in | 10/5/2018 | 10/5/2018 | 10/5/2018 | P | PART |
Tony Young
|
|
|
Scott Phone #: ###-####,, ?s on frame,, verified fire treated deck beams, walk through,, talked about wui
|
BLD-Foundation | 8/27/2018 | 8/28/2018 | 8/28/2018 | A | DONE |
Tony Young
|
|
|
Pat
|
BLD-Footing | 8/22/2018 | 8/23/2018 | 8/23/2018 | A | PASS |
Tony Young
|
|
|
Pat Phone #: ###-####
|
BLD-Footing | 8/21/2018 | 8/22/2018 | 8/22/2018 | A | PEND |
Tony Young
|
|
|
Pat Phone #: ###-####,, needs soils approval
|
PubWorks Subgrade Approval | 8/22/2018 | 8/22/2018 | 8/22/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 8/21/2018 | 8/21/2018 | 8/21/2018 | P | NR |
Tony Young
|
|
|
Pat-pour time1:00 Phone #: ###-####,, needs soils approval
|
OVERRIDE | | | 8/16/2018 | | |
|
|
|
|
Routing Walk-In (BLD) | 8/16/2018 | 8/16/2018 | 8/16/2018 | P | DONE |
Brian McGowan
|
|
|
|
Plan assigned to (BJM) | 8/16/2018 | 8/16/2018 | 8/16/2018 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 8/16/2018 | | 8/16/2018 | | PASS |
Brian McGowan
|
|
|
Engineering for stem wall and footing provided.
|
Routing PW Grading-Hillside | 8/16/2018 | | 8/16/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/16/2018 | | DONE |
Brian McGowan
|
|
|
Took in Engineering Documents. No fee requested.
|
Case Summary (BLD) | | | 8/16/2018 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 8/16/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 8/16/2018 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 8/16/2018 | | DONE |
|
|
|
change footing
|
CHANGE STATUS TO (ISS) | | | 8/16/2018 | | DONE |
|
|
|
Plan resubmittal/mod - no fees due per BJM
|
BLD-Footing | 8/13/2018 | 8/14/2018 | 8/14/2018 | A | NR |
Brandon Shaw
|
|
|
Need PW approval
|
Issue PAID IN FULL permit | | | 5/1/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 4/30/2018 | | |
|
|
|
|
OVERRIDE | | | 4/30/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 4/24/2018 | 4/24/2018 | 4/30/2018 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 4/27/2018 | | 4/30/2018 | | PASS |
Brian McGowan
|
|
|
|
Telephone call | | | 4/30/2018 | | DONE |
|
|
|
Spoke with Scott to inform him the permit is ready and what fees are due.
|
1st review completed | | | 4/30/2018 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 4/30/2018 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 4/30/2018 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/30/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 4/30/2018 | | DONE |
|
|
|
Met
|
Routing - PUBLIC WORKS | 4/24/2018 | | 4/27/2018 | | PASS |
Rachael Beierle
|
|
|
needs Hillside review
|
Routing - Erosion and Sediment | 4/26/2018 | | 4/26/2018 | | PASS |
Michael Zawacki
|
|
|
seeking waiver, letter included. Waiver approved, home owner to act as responsible person
|
Routing PW Grading-Hillside | 4/24/2018 | | 4/26/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
|
Routing - PUBLIC WORKS | 4/26/2018 | | 4/26/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing Walk-In (BLD) | 4/24/2018 | 4/24/2018 | 4/24/2018 | P | PASS |
Brian McGowan
|
|
|
Taken in and routed to Hillside, erosion and myself.
|
Routing Walk-In (BLD) | 4/23/2018 | 4/23/2018 | 4/23/2018 | A | FAIL |
Brian McGowan
|
|
|
Need foundation stamped by engineer, additional enercalc design for stem wall and footing areas, engineerng and Form 310 for welding.
|
Routing Walk-In (BLD) | 3/16/2018 | 3/16/2018 | 3/16/2018 | A | FAIL |
Josh Bogle
|
|
|
discussed needing more info before routing
|
Routing Walk-In (Zoning) | 3/15/2018 | 3/15/2018 | 3/15/2018 | P | PASS |
KayCee Babb
|
|
|
|
Routing Walk-In (BLD) | 3/15/2018 | 3/15/2018 | 3/15/2018 | P | FAIL |
Josh Bogle
|
|
|
discussed needing more info before routing
|
Application received | | 3/15/2018 | | | |
|
|
|
|