BLD-Final | 1/9/2020 | 1/9/2020 | 1/9/2020 | P | NR |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Ron Goff// need letters from the engineer
|
BLD-Final | 1/8/2020 | 1/8/2020 | 1/8/2020 | P | CANC |
Tony Young
|
|
|
ron Phone #: ###-#### Inspection cancelled from web by: Ron Goff
|
PubWorks Occupancy Approval | 12/3/2019 | 12/3/2019 | 12/3/2019 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Aging Inspection | 9/25/2019 | 9/25/2019 | 9/27/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 9/24/2019 | 9/24/2019 | 9/27/2019 | | PEND |
Tony Young
|
|
|
|
Print Occupancy Form | | | 7/17/2019 | | DONE |
|
|
|
|
Telephone call | | | 7/17/2019 | | DONE |
|
|
|
changed zoning required signature to zoning per Karla Nelson
|
BLD-Final | 5/13/2019 | 5/13/2019 | 5/13/2019 | P | PART |
Tony Young
|
|
|
Ron Phone #: ###-####,, needs final letter from engineer,, all structural elements.. also final inspections from CDHD and zoning.. temp accupancy to move things in ok ((spoke with Tony on the phone 5-20-19 CDHD, PW, and Zoning inspections all require a Partial Final to get a Temps CO)) J.A.
|
FIRE-Final Inspection | 5/7/2019 | 5/8/2019 | 5/8/2019 | A | PASS |
Troy Cobbley
|
|
|
Previous corrections addressed. Life safety passed. Ron Phone #: ###-####
|
FIRE-Final Inspection | 4/19/2019 | 4/22/2019 | 4/22/2019 | A | FAIL |
Jim Page
|
|
|
Provide city approved drawings showing the exit/egress lighting plan, none provided, sheets were missing in approved drawing packet. Provide small documents. Install knox box as discussed. Install FACP signage on fire alamr panel room.
alarm Gym // Ron Phone #: ###-####
|
FIRE-Final Inspection | 3/15/2019 | 3/15/2019 | 3/15/2019 | P | PART |
Jim Page
|
|
|
Fire alarm and hood suppression system inspection for kitchen area have been completed, fire extinguishers are placed with current inspection tags. Life fire safety inspection for kitchen TCO complete.
Ron-kitchen area Phone #: ###-####
|
FIRE-Final Inspection | 3/1/2019 | 3/4/2019 | 3/4/2019 | A | FAIL |
Jim Page
|
|
|
As stated before, no fire alarm inspection has been requested nor finaled for area of work, fire life safety inspection will not be performed or completed until fire alarms are inspected and passed, during hood inspection is was noticed that the fire alarm system has 3 different tones in the gym area when fire alarm is activated, this is not code compliant.
Ronald-partial life safety kitchen only Phone #: ###-####
|
BLD-Final | 2/28/2019 | 3/1/2019 | 3/1/2019 | P | NR |
Tony Young
|
|
|
Ronald Phone #: ###-####,, needs trades 1st,, needs letter from engineer that all is good,, not many inspections were called in,, called ,, no answer,, left messege
|
FIRE-Final Inspection | 2/28/2019 | 3/1/2019 | 3/1/2019 | A | FAIL |
Jim Page
|
|
|
Fire alarm permit (FIR18-00644) associated with this project has not been inspected or finaled, fire alarm inspection needs to be completed and finaled before life fire safety inspection can be perfromed.ron Phone #: ###-####
|
BLD-Aging Inspection | 11/28/2018 | 11/28/2018 | 12/3/2018 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 11/27/2018 | 11/27/2018 | 12/3/2018 | | PASS |
Tony Young
|
|
|
|
BLD-Ceiling Grid Inspection | 11/5/2018 | 11/5/2018 | 11/5/2018 | P | PASS |
Tony Young
|
|
|
Ron Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 10/5/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 9/19/2018 | | |
|
|
|
|
Plan assigned to (JAR) | 9/7/2018 | 9/7/2018 | 9/19/2018 | | DONE |
Julie Romig
|
|
|
09/21 - 2nd Rev - 1st Rev Comp - Plan Mod Taft Elementary Gym
|
Routing - PLAN CHECK | 9/17/2018 | | 9/19/2018 | | PASS |
Julie Romig
|
|
|
|
Permit Ready to Issue | | | 9/19/2018 | | DONE |
|
|
|
PLAN MOD
|
Routing - PLUMBING | 9/17/2018 | | 9/18/2018 | | PASS |
Dan Ediger
|
|
|
per ISPC
|
Routing PW Sewer Design | 9/17/2018 | | 9/18/2018 | | PASS |
DeAnn Brown
|
|
|
|
Routing - PLAN CHECK | 9/13/2018 | | 9/13/2018 | | PASS |
Julie Romig
|
|
|
|
Routing PW Sewer Design | 9/11/2018 | | 9/11/2018 | | FAIL |
DeAnn Brown
|
|
|
Please tap existing manhole instead of mainline. Match crowns of pipes and re-channel manhole base as needed.
|
Plan Modification Accepted | | | 9/7/2018 | | DONE |
|
|
|
Sanitary sewer service, change of connection from original location to north side as shown on plans
|
BLD-Foundation | 8/3/2018 | 8/6/2018 | 8/6/2018 | A | PEND |
Tony Young
|
|
|
Ron Phone #: ###-####,, pending special inspection
|
BLD-Foundation | 8/2/2018 | 8/3/2018 | 8/3/2018 | P | PEND |
Tony Young
|
|
|
Ron Phone #: ###-####
|
BLD-Footing | 7/11/2018 | 7/16/2018 | 7/16/2018 | A | PART |
Tony Young
|
|
|
Ron Phone #: ###-####,, pending special inspection report
|
BLD-Footing | 7/5/2018 | 7/11/2018 | 7/11/2018 | A | PART |
Mike Jordan
|
|
|
(request 11am) Ron Phone #: ###-####. perimeter footings. Needs to add verts and corners and intersections. Concrete placement cancelled due to no special inspection.
|
Meeting | | | 6/8/2018 | | DONE |
|
|
|
rep from schood district came in and paid for project. He said Contractor will contact us for permit issuance (still need RP).
|
Print Occupancy Form | | | 6/8/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/8/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 6/4/2018 | | |
|
|
|
|
Plan assigned to (JAR) | 4/4/2018 | 4/4/2018 | 6/4/2018 | | DONE |
Julie Romig
|
|
|
**1st Rev Comp - 3rd Rec'd 05/25 - Expedited Review - Taft Elementary - 10 day Review
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/4/2018 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 6/4/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 6/4/2018 | | DONE |
|
|
|
NEED
RP
GC FORM-met
REVISED VALUE **GO BY STATE PLAN CHECK FEE**
|
Routing - PLAN CHECK | 5/25/2018 | | 6/4/2018 | | PASS |
Julie Romig
|
|
|
|
Routing - FIRE | 5/25/2018 | 5/25/2018 | 5/31/2018 | | PASS |
Erika Akin
|
|
|
Attached revised comments to case
|
Routing - ELECTRICAL | 5/25/2018 | | 5/31/2018 | | PASS |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 5/1/2018 | | 5/7/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing PW Drainage | 5/1/2018 | | 5/7/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing Off Site - STRUCTURAL | 5/1/2018 | | 5/7/2018 | | PASS |
Julie Romig
|
|
|
|
Routing - ELECTRICAL | 5/1/2018 | | 5/4/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing - FIRE | 5/1/2018 | 5/1/2018 | 5/3/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case, emailed architect and added parcel tag
|
Routing PW Drainage | 5/3/2018 | | 5/3/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Solid Waste | 5/1/2018 | | 5/3/2018 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Sewer Design | 5/1/2018 | | 5/2/2018 | | PASS |
DeAnn Brown
|
|
|
|
Route to Impact Fee Review | 4/13/2018 | 4/16/2018 | 4/16/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 4/13/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 4/4/2018 | | 4/13/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing Off Site - STRUCTURAL | 4/4/2018 | | 4/11/2018 | | PASS |
Julie Romig
|
|
|
|
Routing - FIRE | 4/4/2018 | 4/4/2018 | 4/10/2018 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
Routing PW Drainage | 4/4/2018 | | 4/6/2018 | | PASS |
Brian Murphy
|
|
|
SAND WINDOW DEPTH SEEPAGE BED CALCAPDX J
|
Routing PW Street Lights | 4/4/2018 | | 4/5/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Sewer Design | 4/4/2018 | | 4/5/2018 | | FAIL |
DeAnn Brown
|
|
|
Refer to changemarks on sheet C5.1 (utility plan) in eplanreview for redlines.
|
Routing PW Solid Waste | 4/4/2018 | | 4/5/2018 | | FAIL |
Evan Carpenter
|
|
|
Solid waste containers must be screened by an enclosure per the City’s Solid Waste Ordinance.
|
Routing PW Environmental | 4/4/2018 | | 4/5/2018 | | PASS |
Rick Christenson
|
|
|
|
Routing - ELECTRICAL | 4/4/2018 | | 4/5/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLUMBING | 4/4/2018 | | 4/4/2018 | | PASS |
Bill VanDegrift
|
|
|
per redlines, plans and ISPC
|
Routing - PLANNING | 4/4/2018 | | 4/4/2018 | | PASS |
Celine Acord
|
|
|
per CUP18-00008
|
Routing - Addressing | 4/4/2018 | | 4/4/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 4/4/2018 | | 4/4/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 4/4/2018 | | 4/4/2018 | | PASS |
Michael Zawacki
|
|
|
Provided SWPPP is Pre-construction. RP is still needed before construction begins. Site maps for bid and bid alternate provided, it is responsible persons responsibility to make sure correct BMPs and map are used.
Site prep inspection will be required.
|
Routing - MECHANICAL | 4/4/2018 | | 4/4/2018 | | PASS |
Troy James
|
|
|
Commissioning is required if the district accepts the gymnasium for buildout.
|
Routing - Design Review | 4/4/2018 | | 4/4/2018 | | PASS |
Sarah Schafer
|
|
|
no review required.
|
Intake Approval | | | 4/4/2018 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 3/29/2018 | | PASS |
Carl Westfall
|
|
|
Carl Madsen approved the plan intake while Carl Westfall was on vacation
|
Intake Approval | | | 3/23/2018 | | FAIL |
Carl Westfall
|
|
|
(3-23-18) Please refer to the circled items in the plan intake checklist. Please resolve each item as directed. CJW
|
Application received | | | 3/16/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 16 2018 1:24PM
|