BLD-Final | 10/2/2018 | 10/5/2018 | 10/5/2018 | A | PASS |
Jim Storey
|
|
|
Ashley Phone #: ###-#### final ok pending ele.
|
BLD-Framing/Rough-in | 7/25/2018 | 7/26/2018 | 7/26/2018 | A | PASS |
Jim Storey
|
|
|
Preston-please call 20 mintues prior to meet Phone #: ###-####
|
BLD-Framing/Rough-in | 7/3/2018 | 7/3/2018 | 7/5/2018 | P | NR |
Dave Hannah
|
|
|
Nick Phone #: ###-####- please call 30 mins prior
|
BLD-Wall Bracing | 7/3/2018 | 7/3/2018 | 7/3/2018 | P | PASS |
Dave Hannah
|
|
|
Nick Phone #: ###-####-please call ahead
|
BLD-Wall Bracing | 6/28/2018 | 6/29/2018 | 6/29/2018 | A | NR |
Mike Jordan
|
|
|
Shear // Call half hour before Preston Phone #: ###-####. No repairs have been completed. provide engineering or build per the approved plans.
|
BLD-Framing/Rough-in | 6/28/2018 | 6/29/2018 | 6/29/2018 | A | NR |
Mike Jordan
|
|
|
Thomas Phone #: ###-####
|
BLD-Wall Bracing | 6/25/2018 | 6/25/2018 | 6/25/2018 | P | FAIL |
Jim Storey
|
|
|
Preston Phone #: ###-####
|
BLD-Framing/Rough-in | 6/25/2018 | 6/25/2018 | 6/25/2018 | P | NR |
Jim Storey
|
|
|
Preston Phone #: ###-####
|
BLD-Footing | 5/25/2018 | 5/29/2018 | 5/29/2018 | A | PASS |
Brandon Shaw
|
|
|
Please call ahead for access - Mark Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 5/25/2018 | | DONE |
Christina Prado
|
|
|
No fees due, change status to ISS after quick over counter modification completed
|
Plan assigned to (JAB) Josh | 5/14/2018 | 5/14/2018 | 5/14/2018 | | DONE |
Josh Bogle
|
|
|
|
Plan Modification Accepted | | | 5/14/2018 | | DONE |
|
|
|
called JAB to see if he wanted to do a plan mod-no answer so Suzanne paged him. He'll let me know if he's taking it in or keeping the plan mod to do between customer
|
OVERRIDE | | | 3/16/2018 | | |
|
|
|
|
Routing Walk-In (Zoning) | 3/16/2018 | 3/16/2018 | 3/16/2018 | P | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 3/16/2018 | 3/16/2018 | 3/16/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 3/16/2018 | | 3/16/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 3/16/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 3/16/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/16/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/16/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 3/16/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/16/2018 | | DONE |
|
|
|
|
Application received | | 3/16/2018 | | | |
|
|
|
|