BLD-Final | 9/19/2018 | 9/20/2018 | 9/20/2018 | A | PASS |
Jim Sly
|
|
|
Please call // Micheal Phone #: ###-####
|
DOC - Permit Finaled | 9/20/2018 | 9/20/2018 | 9/20/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 6/4/2018 | 6/5/2018 | 6/5/2018 | A | PASS |
Dave Hannah
|
|
|
Michael Phone #: ###-####
|
BLD-Framing/Rough-in | 5/30/2018 | 5/30/2018 | 5/30/2018 | P | PASS |
Brandon Shaw
|
|
|
Above garage conversion OK
|
BLD-Framing/Rough-in | 5/7/2018 | 5/7/2018 | 5/7/2018 | P | NR |
Tony Young
|
|
|
Mikael Phone #: ###-####,, need trades 1st
|
Issue PAID IN FULL permit | | | 3/21/2018 | | DONE |
|
|
|
|
Telephone call | | | 3/20/2018 | | DONE |
|
|
|
Spoke with Michael informing him that this permit is ready and the fee amout due
|
Routing Walk-In (Addressing) | 3/19/2018 | 3/19/2018 | 3/19/2018 | P | PASS |
Doug Chausow
|
|
|
Not addressed as ADU
|
Plan assigned to (JAB) Josh | 3/16/2018 | 3/16/2018 | 3/19/2018 | | PASS |
Josh Bogle
|
|
|
due 3/22 - ADU? - talk to NCW
|
Routing - PLAN CHECK | 3/16/2018 | | 3/19/2018 | | PASS |
Josh Bogle
|
|
|
|
Plan Reviewer's activity | | | 3/19/2018 | | DONE |
Josh Bogle
|
|
|
routed to PW per their request - JAB
|
Routing - PUBLIC WORKS | 3/19/2018 | | 3/19/2018 | | PASS |
Morgan Webb
|
|
|
PLEASE HAVE PLM INSPECTOR STOP BY OR CALL ME AFTER ROUGH IN INSPECTION IS COMPLETED. 7546 IS MY LINE.
|
1st review completed | | | 3/19/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 3/19/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/19/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/19/2018 | | DONE |
Josh Bogle
|
|
|
Have applicant bring me the 2nd set of plans (the dirty dawg stole them!!!) - JAB
|
Permit Ready to Issue | | | 3/19/2018 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 3/16/2018 | 3/16/2018 | 3/16/2018 | P | PASS |
Nicolette Womack
|
|
|
Removed kitchen space. Moved sink to the bathroom. No ADU approved.
|
Routing Walk-In (BLD) | 3/16/2018 | 3/16/2018 | 3/16/2018 | P | PASS |
Josh Bogle
|
|
|
took in as a level 2
|
Application received | | 3/16/2018 | | | |
|
|
|
|