Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-00949
StatusFinaled
Name BLUE RAVEN SOLAR LLC
Site Address 1902 S EMPIRE WAY
Project NameMatthew Groves
Customer Number 
ePlanReviewYes
Description
PV electric roof mounted solar array 6.49 kW Permit for 385 sq' of roof-mounted, grid-tied Photo-voltaic panels with optimizers; 22 panels in 1 array. All work per plans, engineering, manufacturer’s specs, & local code. Separate electrical permit required. ***MDH***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/30/20185/1/20185/1/2018PDONE
DetailsMike Jordan
This has already passed the exterior portion of inspection, but homeowner was not home for inspector to enter residence. They will need to run the kids to school in the morning and would appreciate a call with an ETA. Thank you. Phone #: ###-#### Inspection requested via web by BRS Permitting
DOC - Permit Finaled5/1/20185/1/20185/1/2018PPASS
DetailsMike Jordan
Telephone call  5/1/2018 DONE
called Mike J. to let know we changed the am/pm times for the final inspection
BLD-Final4/23/20184/27/20184/27/2018PPEND
DetailsMike Jordan
Justin Phone #: ###-#### Inspection requested via web by BRS Permitting. Will be ok for final once electrical finals.
BLD-Final4/19/20184/20/20184/20/2018ANR
DetailsMike Jordan
The field tech Karrigan will be on site for the inspection. Phone #: ###-#### Inspection requested via web by BRS Permitting. Electrical final has failed.
BLD-Final4/10/20184/11/20184/11/2018PNR
DetailsMike Jordan
karrigan Phone #: ###-####. Electrical final failed.
BLD-Final4/10/20184/10/20184/10/2018PCANC
DetailsMike Jordan
karrigan Phone #: ###-####
Routing - PLAN CHECK3/27/2018 3/27/2018 PASS
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  3/27/2018 DONE
DetailsMichael Hanson
Permit Ready to Issue  3/27/2018 DONE
met
Issue PAID IN FULL permit  3/27/2018 DONE
Plan assigned to (M_H)3/22/2018 3/27/2018 DONE
DetailsMichael Hanson
03/22 Solar panels.1st review completed - Provide documentation that indicates 2015 IRC compliance. MDH
Plan assigned to (JAB) Josh3/16/20183/16/20183/22/2018 DEFR
DetailsJosh Bogle
due 3/22 - PV
Routing - PLAN CHECK3/16/2018 3/22/2018 FAIL
DetailsMichael Hanson
Provide documentation that indicates 2015 IRC compliance. MDH
Routing - PLANNING3/16/2018 3/22/2018 PASS
DetailsColleen T Carroll
Per ePlan approval. MDH
Plan Reviewer's activity  3/22/2018 FAIL
DetailsMichael Hanson
Provide documentation that indicates 2015 IRC compliance. MDH
1st review completed  3/22/2018 FAIL
DetailsMichael Hanson
Provide documentation that indicates 2015 IRC compliance. MDH
Application received  3/16/2018 DONE
Application submitted via PDS Online on Mar 16 2018 3:21PM
Routing - PLANNING3/16/2018 3/16/2018 PASS
DetailsColleen T Carroll
Plans ACCEPTED BY PLAN TECH  3/16/2018 DONE
Intake Approval  3/16/2018 PASS
Recd Pcfee & Taken To Pln CK  3/16/2018 DONE