BLD-Final | 4/2/2018 | 4/3/2018 | 4/3/2018 | A | PASS |
Brandon Shaw
|
|
|
Contact is Marcus Phone #: ###-#### Inspection requested via web by rich prasch
|
DOC - Permit Finaled | 4/3/2018 | 4/3/2018 | 4/3/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Footing | 3/29/2018 | 3/30/2018 | 3/30/2018 | A | PASS |
Brandon Shaw
|
|
|
Footing inspection can be done in the AM. You can go as early as you want as the footings are already done. Jimmy will be doing the installation and his cell number is ###-####. Thanks, Rich. Phone #: ###-#### Inspection requested via web by rich prasch
|
Plan assigned to (JAB) Josh | 3/19/2018 | 3/19/2018 | 3/28/2018 | | PASS |
Josh Bogle
|
|
|
1st done - metal patio cover - waiting on HOA approval
|
Routing - PLANNING | 3/19/2018 | | 3/28/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - PLAN CHECK | 3/28/2018 | | 3/28/2018 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/28/2018 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 3/28/2018 | | DONE |
|
|
|
All Requirements Met
|
Issue PAID IN FULL permit | | | 3/28/2018 | | DONE |
|
|
|
|
1st review completed | | | 3/27/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 3/19/2018 | | 3/27/2018 | | PASS |
Josh Bogle
|
|
|
|
Application received | | | 3/19/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 19 2018 12:54PM
|
Routing Walk-In (Zoning) | 3/19/2018 | 3/19/2018 | 3/19/2018 | P | FAIL |
Josh Bogle
|
|
|
Harris Ranch requires HOA approval
|
Plans ACCEPTED BY PLAN TECH | | | 3/19/2018 | | DONE |
|
|
|
|
Intake Approval | | | 3/19/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/19/2018 | | DONE |
|
|
|
|
Intake Approval | | | 3/19/2018 | | FAIL |
|
|
|
elevation plan sheet uploaded incorrectly
|