BLD-Final | 10/31/2018 | 10/31/2018 | 10/31/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 10/31/2018 | 10/31/2018 | 10/31/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 10/31/2018 | 10/31/2018 | 10/31/2018 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 3.98
|
BLD-Final | 10/26/2018 | 10/30/2018 | 10/30/2018 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Blower Door Test Results | 10/30/2018 | 10/30/2018 | 10/30/2018 | A | NR |
Brandon Shaw
|
|
|
|
BLD-Final | 10/29/2018 | 10/29/2018 | 10/29/2018 | P | NR |
Brandon Shaw
|
|
|
Need PLM final... Need blower door and air seal cert...
|
BLD-Energy code compliance | 8/30/2018 | 8/30/2018 | 8/30/2018 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Framing/Rough-in | 8/27/2018 | 8/28/2018 | 8/28/2018 | A | PASS |
Brandon Shaw
|
|
|
OK to insulate
|
BLD-Wall Bracing | 8/27/2018 | 8/28/2018 | 8/28/2018 | A | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Framing/Rough-in | 8/27/2018 | 8/27/2018 | 8/27/2018 | A | NH |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Wall Bracing | 8/27/2018 | 8/27/2018 | 8/27/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Other | 8/27/2018 | 8/27/2018 | 8/27/2018 | A | PASS |
Brandon Shaw
|
|
|
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Wall Bracing | 8/23/2018 | 8/24/2018 | 8/24/2018 | A | FAIL |
Brandon Shaw
|
|
|
Hold downs and floor to floor HD/Straps to be as per plans/locations- See pgs S2.0- 2.2 detail 10 See red paint
Do not cover exterior
|
BLD-Other | 8/23/2018 | 8/24/2018 | 8/24/2018 | A | PEND |
Brandon Shaw
|
|
|
Pending wall bracing corrections
Do not cover exterior
|
BLD-Framing/Rough-in | 8/22/2018 | 8/23/2018 | 8/23/2018 | A | FAIL |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick no exterior nail insp provide access. framing nr
|
Plan Modification Accepted | | | 7/23/2018 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 7/23/2018 | | 7/23/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Foundation | 5/3/2018 | 5/3/2018 | 5/4/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Foundation | 5/1/2018 | 5/1/2018 | 5/1/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
Issue PAID IN FULL permit | | | 4/19/2018 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/19/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 4/18/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 4/5/2018 | 4/5/2018 | 4/18/2018 | | DONE |
Rob Patrick
|
|
|
4/18 sfd L1 ePlan
|
Routing - PLAN CHECK | 4/18/2018 | | 4/18/2018 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/18/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 4/18/2018 | | DONE |
|
|
|
|
1st review completed | | | 4/16/2018 | | FAIL |
Rob Patrick
|
|
|
4/16 Failed. Wrong Version was uploaded.
|
Routing - PLAN CHECK | 4/5/2018 | | 4/16/2018 | | FAIL |
Rob Patrick
|
|
|
4/16...Failed. Wrong Version was uploaded.
|
Routing - MECHANICAL | 4/5/2018 | | 4/9/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Route to Impact Fee Review | 4/5/2018 | 4/8/2018 | 4/6/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 4/5/2018 | | 4/6/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 4/5/2018 | | 4/6/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 4/5/2018 | | 4/6/2018 | | PASS |
Rachael Beierle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/5/2018 | | DONE |
|
|
|
|
Intake Approval | | | 4/5/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/5/2018 | | DONE |
|
|
|
|
Application received | | | 3/19/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 19 2018 2:36PM
|
Intake Approval | | | 3/19/2018 | | FAIL |
|
|
|
MET
NEED
2015 IECC
MET Insulation only says, "wall insulation" (on cover sheet)
|