Permit Information
Permit NumberBLD18-00969
StatusFinaled
Name ST LUKES HEALTH SYSTEM LTD
Site Address 720 E PARK BLVD Unit: 265
Project NameWGCP - 2nd flr IT suite 265
Customer Number 
ePlanReviewYes
Description
(WGCP - 2nd Floor IT Room - Suite #265) To reconfigure and existing office area located on the second floor to create an 87 Sf. IT room. Work to include construction of approximately 10 lf of non-combustible partition, Electrical & Mechanical work. Miscelaneous related interior finishes. This building is fully fire sprinklered any alterations or modifications to the sprinkler system will require separate permits. RmH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 5/11/20195/13/2019 DONE
This permit finaled on the web by Curtis Weedop
Third Notice 4/16/20195/6/2019 DONE
email curtis and vira 5-6-19 with second follow up letter
Second Follow up  5/6/2019 DONE
Third Notice 3/12/20194/11/2019 DONE
mailed 4-12-19 with first follow up letter, mcenteev@slhs.org (vira)
First Follow up  4/11/2019 DONE
Third Notice 2/11/20193/7/2019 DONE
emailed curit 3-7-19
Third Notice 1/13/20192/6/2019 DONE
emailed curtis 2-6-19
Second Notice 12/24/20181/8/2019 DONE
emailed value to curtis
First Notice11/9/201811/9/201812/14/2018 DONE
DetailsDave Hannah
mailed 12-17
Letter of compliance/Occupancy  11/29/2018 DONE
BLD-Final11/8/201811/9/201811/9/2018APASS
DetailsDave Hannah
Zac Phone #: ###-####
DOC - Permit Finaled11/9/201811/9/201811/9/2018PPASS
DetailsDave Hannah
FIRE-Final Inspection11/7/201811/8/201811/8/2018APASS
DetailsJim Page
Final life fire safety inspection for area of work complete.

Zack Phone #: ###-####
BLD-Final10/29/201810/30/201810/30/2018ANR
DetailsDave Hannah
Zack Phone #: ###-#### needs fire life saftey first
BLD-Framing/Rough-in6/6/20186/7/20186/7/2018APASS
DetailsDave Hannah
Ken Phone #: ###-####
Issue PAID IN FULL permit  5/10/2018 DONE
Print Occupancy Form  5/10/2018 DONE
Plan assigned to (RMH)3/24/20183/24/20183/28/2018 PASS
DetailsRon Hill
WGCP L-2
Routing - PLAN CHECK3/28/2018 3/28/2018 PASS
DetailsRon Hill
1st review completed  3/28/2018 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/28/2018 DONE
Permit Ready to Issue  3/28/2018 DONE
DetailsChristina Prado
Need
GC Form - met
Revised Cert of Value - met

Email permits to: Weedop, Curtis at weedopc@slhs.org
Routing - FIRE3/24/20183/24/20183/26/2018 CANC
DetailsScott Arellano
no fire review required
Intake Approval  3/24/2018 PASS
Intake Approval  3/21/2018 FAIL
DetailsRob Patrick
3/21/18:
This Prescreen has failed for the following items:
1. Checklist indicated 2 copies of specifications that were not available.
2. On Checklist "Accessibility Inside the Building" section it indicated 2 drawing, A2.1 & A2.2. Drawing A2.2 was not provided.
Application received  3/19/2018 DONE
Application submitted via PDS Online on Mar 19 2018 2:59PM