BLD-Final | 9/27/2018 | 9/28/2018 | 9/28/2018 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by kevin debelloy
|
DOC - Permit Finaled | 9/28/2018 | 9/28/2018 | 9/28/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Grading Inspection | 9/27/2018 | 9/27/2018 | 9/27/2018 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by kevin debelloy
|
BLD-Energy code compliance | 6/21/2018 | 6/21/2018 | 6/22/2018 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by kevin debelloy
|
BLD-Framing/Rough-in | 6/21/2018 | 6/21/2018 | 6/22/2018 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by kevin debelloy
|
BLD-Framing/Rough-in | 6/20/2018 | 6/21/2018 | 6/21/2018 | A | CANC |
Jim Sly
|
|
|
Phone #: ###-#### >> Inspection requested via web by kevin debelloy Inspection cancelled from web by: kevin debelloy
|
BLD-Energy code compliance | 6/20/2018 | 6/21/2018 | 6/21/2018 | A | CANC |
Jim Sly
|
|
|
Phone #: ###-#### >> Inspection requested via web by kevin debelloy Inspection cancelled from web by: kevin debelloy
|
BLD-Framing/Rough-in | 6/18/2018 | 6/19/2018 | 6/19/2018 | P | PART |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by kevin debelloy. Needs to complete lateral bracing on trusses. Framing repairs in progress. Ok to insulate. Also noted to contractor that draft stops in attic also need to be inspected.
|
BLD-Framing/Rough-in | 6/18/2018 | 6/18/2018 | 6/18/2018 | P | FAIL |
Mike Jordan
|
|
|
Provide truss engineering. Fire block at top of all double walls. Need to provide continous 1hr. assembly were floor trusses sit on 1hr. wall. Will need to insulate behind tubs upstairs. Correction notice posted.
|
BLD-Framing/Rough-in | 6/18/2018 | 6/18/2018 | 6/18/2018 | P | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by kevin debelloy.
|
Plan assigned to (M_H) | 4/17/2018 | | 6/18/2018 | | DONE |
Michael Hanson
|
|
|
04/11 duplex L1 ePlan. 1st review completed. See comments from Planning. MDH
|
Plan Modification Accepted | | | 6/5/2018 | | DONE |
|
|
|
new manual j reports
|
Routing - MECHANICAL | 6/5/2018 | | 6/5/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 5/24/2018 | 5/25/2018 | 5/25/2018 | A | PASS |
Jim Sly
|
|
|
For shear Phone #: ###-#### Inspection requested via web by kevin debelloy
|
BLD-Foundation | 4/26/2018 | 4/26/2018 | 4/26/2018 | A | PASS |
Jim Sly
|
|
|
pour is set for 12:30 Phone #: ###-#### Inspection requested via web by kevin debelloy
|
BLD-Footing | 4/23/2018 | 4/24/2018 | 4/24/2018 | A | PASS |
Jim Sly
|
|
|
pour is scheduled for 12:30 should be ready for inspections by 11:00 Phone #: ###-#### Inspection requested via web by kevin debelloy
|
OVERRIDE | | | 4/18/2018 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/18/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/18/2018 | | DONE |
|
|
|
|
Routing - PLANNING | 4/18/2018 | | 4/18/2018 | | PASS |
Leon Letson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/18/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 4/18/2018 | | DONE |
|
|
|
|
Telephone call | | | 4/17/2018 | | DONE |
|
|
|
called Jeff Hatch and explained plans approved by mistake, still need to upload and address planning comments.
|
CHANGE STATUS TO (REV) | | | 4/17/2018 | | DONE |
|
|
|
failed planning
|
OVERRIDE | | | 4/11/2018 | | |
|
|
|
|
Plan Reviewer's activity | | | 4/11/2018 | | DONE |
Michael Hanson
|
|
|
|
1st review completed | | | 4/11/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 4/11/2018 | | DONE |
|
|
|
MET
|
Plan assigned to (M_H) | 3/29/2018 | | 4/11/2018 | | DONE |
Michael Hanson
|
|
|
04/11 duplex L1 ePlan
|
Routing - PLAN CHECK | 3/29/2018 | | 4/11/2018 | | PASS |
Michael Hanson
|
|
|
|
Routing - PLANNING | 3/29/2018 | | 4/4/2018 | | FAIL |
Leon Letson
|
|
|
1. Each unit shall have at least 375 square feet of private open space. Each space shall be fenced in order to provide “private” open space. Additionally, each open space shall be accessible from the unit that it is intended to serve.
2. A cross-access agreement for the shared driveway shall be recorded and submitted to the City prior to issuance of building permits.
3. A landscape plan with details for an irrigation system shall be included with the building permit.
|
Route to Impact Fee Review | 3/29/2018 | 4/1/2018 | 3/30/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 3/29/2018 | | 3/29/2018 | | PASS |
Doug Chausow
|
|
|
2 Addresses: 10065 W Eshelman St and 10058 W Eshelman St
|
Routing - PUBLIC WORKS | 3/29/2018 | | 3/29/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - MECHANICAL | 3/29/2018 | | 3/29/2018 | | PASS |
Troy James
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/29/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/29/2018 | | DONE |
|
|
|
|
Intake Approval | | | 3/29/2018 | | PASS |
|
|
|
|
Intake Approval | | | 3/21/2018 | | FAIL |
|
|
|
need a manual J for each side of the duplex and some of the sheets say 2012 IRC so need changed to 2015 IRC
|
Application received | | | 3/20/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 20 2018 2:27PM
|